10-06-86 Public Works Comm Minutes• October 6, 1986 PUBLIC WORKS COMMITTEE 3:00 P.M. Chairman Ruiz and Councilmen Palmer, Schindler and Nystul in attendance. Mayor Kennedy, DPW Hammer, Attorney Neier, Sewer and Water Superintendent Hyde, Surveyor Zavodny, Construction Inspector Van Dyke, Street Superintendent Brady, Police Chief Stefanic, Mike Fraser of TD&H and Roger Hopkins of .the Daily Inter Lake also present. 5TH AVENUE WEST PROJECT - DPW Hammer stated that the problem with the timing of the work on 5th that was the cause of this meeting had been solved during the morning. Mike Fraser said Pack had been fighting water problems but that was no excuse and 2 - 4 more blocks would be ready for paving by the end of the week. The completion date for turning 5th over to the City for paving was September 15. A small amount of time consideration could be given for extra services. Imposition of penalties will be actual damages and costs incurred by the City, which would include inspection time by both the City and TD&H and some time for DPW Hammer. DPW Hammer stated that during the last week when the subgrade was so wet there was no compaction Pack wanted to give it to the City to pave, but he would not accept it. The City has two options: 1) wait for weather to dry the road out sufficiently to allow paving, or 2) have Pack remove the wet material and-r-eplace it with dry. The decision was made to wait until after the weekend, hoping it would be a dry one, and scarify it so aid in the drying. Jim Lynch of Pack agreed to that. The time frame for total completion of the project is 180 days and Pack is within that. • IOTH STREET WEST - DPW Hammer explained that a third of the three blocks of 10th which are part of the project is torn up for the water, a third for the sewer, and there is an 8' strip -of old asphalt down the center. The contract price for patching those three blocks is $20,000. Construction Inspector Van Dyke explained the attached memo showing that for an additional $26,000 those three blocks can be completely reconstructed, including storm drainage. C. Palmer asked about the City just patching, rather than the contractor,. but DPW Hammer explained that it would be a real mess because there is only about 8' of original pavement left in the center of the street. Mike Fraser summarized the costs incurred for Phases I and II of the project and stated that the costs were approximately $300,000 under the original $2.1 million estimate. The reconstruction of these 3 blocks was not included in the original plans because it was felt there would not be sufficient funds. There was concern about the condition of the street through the winter. DPW Hammer said if a decision was made soon the City crews could probably get all but the paving done, and if the weather holds possibly the paving. The Committee was concerned about other needs for the excess monies and wanted to see a list of needs and costs (possible reimbursement of sewer and water funds, lst Alley West project, and finishing several blocks of water line tie-ins) before making a final decision. C. Palmer stated that there comes a point when a street is not worth patching and this is a good example. The question was asked why trenching was done here instead of total excavation, and again the response was that it appeared originally that there would be a lack of funds. The Committee requested a "shopping list" of needs for the remaining funds. s V PUBLIC WORKS COMMITTEE • October 6, 1986 Page 2 LEAF PICK-UP - The Mayor indicated he has received phone calls indicating an attitude of non-compliance with the leaf policy and felt it should be discussed again. C. Palmer stated that the longer the City procrastinates the more complaints there will be and that for the future there should be a list of pros and cons, a summary, and a decision rather than dragging out a decision. C. Schindler felt the City should do as it has in the past with leaf pick-up and purchase a leaf -vac for next year. DPW Hammer confirmed that a leaf -vac was the only real answer. C. Palmer asked if there could be an assessment on the Kalispell Original only (since that is where the leaves are) rather than the whole City paying when there are no leaves in some areas. Enforcement of the request to bag the leaves is not possible without an ordinance to cover it. After continued discussion the Committee consensus was that the City is ASKING that the leaves be bagged this year, but there is no enforcement of that, and a leaf -vac should be purchased for next year. HERITAGE WAY STREET LIGHTS - The Public Works Secretary explained that a decision needed to be made -on whether -the-l-ighting--for Heritage Way was to be part of the City-wide lighting district or a special lighting district. C. Schindler didn't see a need for lights. C. Nystul said there was definitely a need at the intersection with Hwy. 93. DPW Hammer stated that at the time of the development he had expressed a need to the developer but the developer • had said they were not needed, so perhaps they should have the responsibility if lights are put in now. The Committee agreed to authorize only the one light at the intersection, and any additional would have to be with the creation of a special lighting district to be paid for by the adjacent property owners. ajg • SM-0078-86 • CITY OF John "Ed" Kennedy, Jr. °z`` j-/2ew Mayor DATE: October 6, 1986 TO: Ken Hammer, Director of Public Works FROM: Ben Van Dyke, Construction Inspector RE: loth Street West • a] 8 K] PACK & COMPANY PATCHING COSTS Two 6' ditches = 1490 S.Y. x $9.00/S.Y. _ $13,416 (1118 L.F. x 12 = 13,416 e 9 = 1490 S.Y.) OR Two 9' ditches = $20,124 CITY COST TO RECONSTRUCT STREET Asphalt to pave 3 blocks (579 tons x $16.75) _ $9,698 Gravel and pit run = 4,632 Cushion = 4,632 Curb and Gutter (1638 x $6.25) = 10,237 Storm Drain (TD&H 5th Ave.W. estimated price)= 14,000 Excavation of 3 blocks = 2,880 TOTAL $46,079 Drawer 1997 Kalispell, Montana 59903-1997 .,�i�raliait r/u, -1 EN'f�1I L_r' �,.11NG CONSULTANTS 3 Sunset Plaza • K.alisDe;I, Montana 59901-3691 • 755-5246 • Area Code 406 T. H- (TONI) THOMAS P2sic erd SUPERVISING ENGINEERS Dave Heckler - Sanitary JACK HOLLAND Eery A. Hd,drix - Sanitary Vlca P'-".'I r.achael Vv. Fraeer- Civil Anry Rykels - Civil JAMES A. CUMMINGS October 6, 1986 Lee Ehclinu - Structural Secreiarv-Treasurer David Zahlier- Structural WAYNE W. DEAN Re: Kalispell Phase II e2.el arse l_nt - Kenneth I3ammer City of Kalispell Box 1997 Kalispell, MT 59901 Dear Ken: You have requested an update on project funding for Phase I and Phase II of the Kalispell projects. We have researched our file and have the following summary. Phase I - Sanit • Contract Bid Final Contract Engineering: Design Inspection Sewer Trunkline $571,020.00 568,254.60 35,255.37 38,811.66 $642,321.63 Phase II - Water, Storm s Schedule I - Sanitary Sewer Contract Bid Est. Final Contract Engineering: Design Inspection (Est.) Schedule II - Water* Contract Bid Est. Final Contract Engineering: Design • Inspection (Est.) Sanitary Sewer and Pavinc $375,506.57 368,121.95 20,682.90 20,000.00 $237,943.40 246,842.69 14,121.55 9,300.00 * Excluded from contingency budget. OFFICES LN CPFAT FALLS, BOZE�,^!,A'J. AND KALISPELL I • • Kenneth Hammer October 6, 1986 Page 2 Schedule III - Storm Drain Contract Bid Est. Final Contract Engineering: Design Inspection (Est.) $262,440.96 255,467.97 Schedule IV - Streets Improvements 12,849.07 12,000.00 Contract Bid $336,289.44 Est. Final Contract 332,920.00 Engineering: Design 31,451.78 Inspection (Est.) 30,000.00 Contingency (unallocated) Under Budget Estimate: $20,492.45 Funding Needs and Allocations Sanitary Sewer $1,055,935.00 Sewer Revenue Bond $ 876,426.00 Tax Increment 179,509.00 Water Capital Improvement Tax Increment Storm Drain Storm Sewer Revenue Tax Increment Street Construction Sewer Revenue Water Fund Storm Revenue Tax Increment Total $270,264.00 $280,317.00 $394,373.00 166,424.00 103,840.00 140,158.50 140,158.50 51,269.00 51,269.00 51,269.00 240,566.00 $2,000,887.00 • Kenneth Hammer October 6, 1986 Page 3 Funding Summary - Expenditures Sewer Revenue $ 927,695.00 Water Fund 217,693.00 Storm Revenue 191,427.50 Tax Increment 664,073.50 Street Fund -0- Funding Summary - Source Sewer Revenue Storm Revenue Water Fund _. Tax Increment _ Remaining Available Funds 40 Sewer Revenue Storm Revenue Water Fund Tax Increment $2,000,887.00 $1,000,000.00 300,000.00 217,693.00 664-,_07.3.5-0 _ $2,181,766.50 $ 72,305.00 108,572.50 -0- 135,926.50* Deleting pavement replacement from the sanitary sewer and water projects would result in a savings of approximately $16,119.00. The contractor has placed fabric and base gravel but not asphalt. Savings would exclude the cost of fabric and gravel. At this time all subbase except under the curb and a stop approximately eight feet wide in the center has been reconstructed. Approximately 976 square yards of excavation and replacement must be completed for total reconstruction. Tenth is in poor condition and we recommend reconstruction utilizing the gravel placement. Curb and gutters would be needed prior to paving. From the above numbers it appears there is approximately $135,900 remaining for improvements in the tax increment district. Approximately $180,900 is available for asphalt patching, additional sewer work, and additional storm drainage. 0 * Within tax district only. • Kenneth Hammer October 6, 1986 Page 4 • These amounts are estimates and will change subject to the final contract amounts. US. MWF:ah #35-85 If you have any questions, please feel free to contact Very truly yours, THOMAS, DEAN & HOSKINS, INC. By: W01a��W-ie� Michael W. Fraser L