1b. Water Capital Improvement PlanKalispell Original CCI Current CCI Multiplier 2012/13 Council Proposed Water Capital Improvement Plan 8007.48 9273 1.158042231 Project Number Funding Designation Project Description Estimated Cost FY 12-13 Estimated Cost FY 13-14 Estimated Cost FY 14-15 Estimated Cost FY 15-16 Estimated Cost FY 16-17 Estimated Cost Future W-EX-3 D Greenacres NW $ 355,090.49 W-EX-5 R 8th Ave W. Main Replacement $ 1,288,310.40 W-EX-6 R 6th Ave. West Main Replacement $ 402,697.61 W-EX-8 I ConwayDrive and Highway 93 Loop $ 207,416.94 W-EX-10 D S. Woodland Dr. to 5th Ave. E. $ 301,820.55 W-EX-11 D Sylvan Ct. Loop $ 158,142.25 W-EX-12 R Grandview Drive Loop $ 503,736.79 W-EX-15 R 6th St Water Main Improvements $ 747,110.95 W-EX-17 R 3rd Ave. WIN Water Main Replacement $ 328,779.77 W-EX-21 R 4th Avenue East Main Replacement $ 735,125.21 W-EX-22 D Northridge Drive to Four Mile Drive Loop $ 1,232,041.13 W-EX-23 R Meridian Road to Sunnyside Drive Loop (30 % of prj completed in 2005) $ 749,438.61 W-EX-24 R Kelly Road to Woodland Ave Loop (Lehi Ln to Woodland) $ 312,000.00 W-EX-26 R Hwy 93 Loop to Airport Rd $ 948,042.85 W-EX-28 TIF Colorado Street Loop $ 204,800.00 W-EX-29 R Sunset Boulevard Loop $ 247,369.40 W-EX-30 R First Avenue NE Loop $ 165,000.00 W-EX-32 R 7th Avenue W.N. Loop $ 336,932.39 W-EX-38 R Third Ave. W. Loop $ 83,413.78 W-EX-40 R Second Ave. E Loop $ 166,468.57 W-EX-45 D Liberty Street Loop $ 459,789.09 W-EX-109 R Noffsinger Spring Maintenance (misc. repairs/roof replcmnt) $ 80,625.97 W-EX-110 R Washington St. Main Replacement (4th Ave to 5th Ave) $ 78,909.00 W-EX-115 R Vulnerability assessment security upgrades (will do only if mandated) $ 169,074.17 W-EX-119 1 Misc Contract Main Upsize $ 50,000.00 $ 75,000.00 $ 75,000.00 $ 75,000.00 $ 75,000.00 $ 375,000.00 W-EX-123 I Meters $ 65,000.00 $ 65,000.00 $ 65,000.00 $ 65,000.00 $ 65,000.00 $ 325,000.00 W-EX-124 R Meters - Replacements $ 130,000.00 $ 130,000.00 $ 130,000.00 $ 130,000.00 $ 130,000.00 $ 130,000.00 W-EX-128 R Connect existing 6-inch piping on 6th Ave. East and 7th Ave. East with an 8-inch pipe on 10th St. East $ 99,082.09 W-EX-130 R Replace 6-inch pipe on E Oregon St. between 7th Ave. EN and 8th Ave. EN with an 8-inch pipe $ 110,268.78 W-EX-132 R Replace 2-inch and 4-inch pipe in E Arizona At and 1 st Ave. EN with 6-inch and 8-inch pipe $ 195,000.00 W-EX-133 R Replace 6-inch pipe in 4th Ave. WIN from W California St. to W Wyoming St with 8-inch pipe $ 276,471.00 W-EX-135 R Replace 6-inch pipe in W Arizona St. with 8-inch pipe $ 330,806.34 W-EX-136 R Replace 8-inch pipe in Highway 2 from Meridian Rd to the entrance to the Hampton Inn with 10-inch pipe $ 105,474.49 W-EX-137 R Replace 8-inch pipe to commercial area adjacent to Corporate Drive with 10-inch resco e $ 174,192.71 W-EX-139 R Renewal and Replacement $ 445,846.26 $ 445,846.26 $ 445,846.26 $ 445,846.26 $ 445,846.26 $ 445,846.26 W-EX-141 D Glacier Street $ 140,632.65 W-EX-142 R Hawthorn Drive West $ ,4.17 W-EX-143 R Avenue Hilltop214 $ 14,145.17 W-EX-144 R 6th Avenue North West $ 364,366.41 W-EX-145 R 1st Avenue West North $ 284,461.49 W-EX-147 I Develop Grosswieller Water Supply FY 12-13 & Construct Grosswieller Well FY 14-15 $ 46,000.00 $ 518,740,21 W-EX-150 R Armory Well Generator $ 90,000.00 W-EX-153 R Abandon 2" line betwn 3rd Ave E & 5th Ave E reconnect services to existing main -to be completed by City $ 45,000.00 W-EX-154 R 2nd Ave WIN Waterline Replacement $ 248,000.00 W-EX-155 R SCADA System Upgrade/Improvements $ 40,000.00 W-EX-156 D/TIF Liberty Street Water Main Prj $ 338,796.83 W-EX-158 R Lower Zone Reservoir Upgrades I $ 120,000.00 W-EX-159 R Utility Asset Management Program $ 34,000.00 W-EX-160 R Noffsin er Spring Emergency Generator Replacement (Applied for FEMA Grant to pay 25% cost $ 90,000.00 W-EX-161 R Sheepherder Tank Backup Power (Applied for FEMA Grant to pay 25% cost $ 16,000.00 Total Cost/Year $ 2,296,646.26 $ 2,058,248.81 $ 1,947,917.32 $ 2,547,486.91 $ 1,947,887.39 $ 8,308,107.10 2013 Water CIP - Added Projects W-EX-158 - W-EX-161 FY 09 - FY 12 Completed Projects - $6,351,428 W-EX-13 - Upper Zone Storage W-EX-127 - Mach & Equip moved to Equip CIP W-EX-19 - llth St E Water Main W-EX-138 - Upper & Lower Zone Interconnect W-EX-115 - Security Upgrades W-EX-140 - 1st Ave E Idaho St Crossing W-EX-117 - Upper Zone Production W-EX-146 - System Distribution Impry W-EX-119 - Annual Allocation W-EX-149 - US 93 Bypass Water Utility Relocate W-EX-123 - Annual Allocation W-EX-152 - Parkway Dr Water main Replc. W-EX-124 - Annual Allocation W-EX-157 - Section 36 Water Main Extension Total Current Prjs - FY 13 thru Future W tion R = Rates = Impact Fees D = Developer / SID / TIF Combination of Funds $ 19,106,293.79 $ 13,768,023.65 $ 2,147,157.15 $ 3,191,112.98 $ 19,106,293.79