01-09-84 Street & Alley Comm Minutesi
SEWER & WATER COMMITTEE MEETING PAGE 2 JANUARY 9, 1984
0
7. As previously instructed,proposals for storm sewer study for the West North
area were received. Prices ranged from $3,000 to $20,000 with two not giving
total prices. Those present agreed to wait for the new DPW to see if he could
do some or all of the work.
8. The Superintendent emphasised the necessity to move forward rapidly to
develop and implement a plan for accepting sewage from North Valley County
Sewer District. Superintendent Hughes was instucted to call at :Least two firms
for an estimate of cost for them to give us a second opinion on alternatives
proposed.
9. The water main project south of llth street was discussed. The chairman will
check the statute to see if an S.I.D. or R.S.I.D. is appropriate. Due to the
hour, no other discussion was conducted.
10. Customer Service Water Lines. As previously requested, the Superintendent
wants to revert to the policy of the city doing repairs and trenching in the right-
of-way. Previous discussion stated that the new DPW should be consulted. As it
appears a decision on a Director of Public Works may be•made, Superintendent Hughes
will continue on a case by case basis until a new decision is made.
11. Green Acres Water. Superintendent Hughes stated Dean Marquardt had asked the
status of the request to extend water to Green Acres. Those in attendance agreed
that the philosophy of extension of city services needs to be established by the
�' Council. When that decision is made we can proceed.
12. The Superintendent presented documentation relative to the dismissal of a
water department employee.
Meeting adjourned at 5:50 P.M.
Gary Nystul
Chairman
GN/ms