05-14-84 S&W Comm Minutes4:15 P. M. May 14, 1984
• SEWER AND WATER COMMITTEE
_ The Sewer & Water Committee met on this date in the Committee Room at City Hall. Present
were committee members Nystul and Ruiz, Councilman Schindler, Mayor McDowell, DPW Hammer,
Supt. Hughes and Dennis Carver.
Bids North Main Sewer Trunk.
The bids received at the Special City Council meeting were reviewed. The Director of
Public Works and Supt. Hughes will review and report back tomorrow at the next meeting.
Fifth Avenue West Street Proposal
In consideration of replacing the main trunk sewer line now in First Alley West, it pos-
sibly could go down Fifth Avenue West. That would put the line around the mall so it
would not go under any buildings. If it does down Fifth, the water line probably should
be replaced and storm sewer installed. This would pretty well cause a rebuilding of the
whole street. Questions were raised about wideninT the street and of the existinv trees
The DPW and Supt. were authorized to proceed with the planning for the entire length of
Fifth Avenue West.
PROPOSAL:
An individual, Henry Marquardt, had contacted the Superintendent regarding water and
sewer to the vicinity of Reeds Potato Farm on Highway #93N. The committee felt this
was a little far to go.
*Randy Vickhammer. The Supt. announced that Randy Vickhammer, formerly of Evergreen Water
District had been hired as a replacement for Ivan Jones. Randy will start May 29th.
Ivan's last day is May 18-.
Water Quality Hearing
Supt. Hughes is to make a statement at tonight's hearing on water quality of Flathead
Lake. Basically, the position is that Kalispell will remove phosphorous from the WWTP
discharge, but otherg,septic tanks, should be required to do their part.
Meeting adjourned at about 5:00 P.M.
GN/ms
41
DEPARTMENT OF HEALTH AND ENVIRONMENTAL SCIENCES
TED SCHWINDEN, GOVERNOR
May 14, 1984
Mr. Dennis Carver, P.E.
Carver Engineering, Inc.
720 Second Street East
Kalispell, MT 59901
COGSWEL BUDDING
HELENA, MONTANA 59620
Re: Plans and specifications for a 12" sewer main installation on North
Main Street between East Arizona and East Nevada and on East Nevada
between North Main and the alley immediately east of North Main.
Plans and specifications dated received by DHES on 9/20/84 and
prepared under the seal of Dennis Carver, P.E., E.S. 84-47
Dear Mr. Carver:
The above referenced plans and specifications have been reviewed by engineers
of the Environmental Sciences Division and were found to be satisfactory.
Approval of these plans is given herewith and according to the following
provisions:
That any change in the above referenced plans will be submitted to the Water
Quality Bureau for review prior to the beginning of construction, and,
That within 90 days after project construction, the engineer shall certify to
the department that the project was completed in accordance with the plans and
specifications approved by the department. This certification shall be
accompanied by a complete set of "as built" drawings signed by the project
engineer, and,
That departure from any criteria set forth in the approved plans and
specifications without department approval is grounds for injunction by the
Department of Health and Environmental Sciences.
Sincerely,
I ", 11-,:r
Ji Melstad
En >_ronmentalEngineer
WaE Quality Bureau
Environmental Sciences Division
JM:ca
cc: City of Kalispell