07-02-82 S&W Comm Minutes3:30 P. M. FRIDAY CONFERENCE ROOM JULY 2, 1982 Councilman Ruiz presided. Present were Mayor McDowell, Councilman Nystul and Saveru_d, Director of Public Works Hafferman., Paul Stokes and Tom Flynn. Paul Stokes, Stahly Engineering, explained that the application for the construction grant for the wastewater treatment plant must be signed before July 15, 1982. They are allowing us to apply for this grant before the design is finished. The construction will be financed 75/ grant and 25/ revenue bonds and sewer funds. If 85/ grant money is available later, we will be allowed to apply for the extra amount. Mr. Stokes explained that Mr. Flynn will be doing a rate study on the sewer use fee, $3,000 of which will be eligible under the grant and a separate contract and $4,500 will be paid by the City. The total construction cost will $1,942,000. Our portion will be $647,000. The bond issue will be $900,000 to cover our cost plus existing liabilities in the sewer fund. This includes money to pay back a loan from the storm sewer to purchase the second Big "A". Councilman Ruiz asked if the agreement with Stahly Engineers had been reviewed by City Attorney Neier. He was assured that it would be before the Tuesday evening council meeting. Discussion on storm sewer charge; bond sale; sewer audit and sewer study procedure. Committee agreed and will recommend to the Council that the Mayor be author- ized to sign application for grant; engineering agreement and contract with Mr. Flynn. Director of Public Works Hafferman asked the committee to agree to furnishing 300' of sewer pipe at $2.20 per foot or a total of $660.00, which will be placed under the airport runway. The sewer will connect with the Robert Monk property and Mr. Monk will do the work. Committee agreed to go ahead with the project. Councilman Ruiz read a letter from Keith Allred, Superintendent of Schools, asking that the City Council, Flathead County Commissioners and School Board discuss a city water line to the Flathead County Nursing Home and the Vo-Ag Building. Councilman Ruiz said he would set a date for the discussion. Director of Public Works will write a statement recommending that a source of water reach that area. He said it would be good to have water to 4-Corners and across to Foys Bend. Discussion on new water line on Main Street. The line will be installed two blocks at a time and the line and extension to each service will be tested before proceeding to the next two blocks. They started at Center and are proceeding south. Center Street will be open to traffic by the middle of Page 2 Sewer and Water Committee Meeting next week® Councilman Nystul reported that he has contacted Gene Hufford about buying our revenue bonds and the interest rate will be 113% to 12%® Meeting adjourned at 4®50 P. M. /6 Leroy E. McDowell Mayor THE CITY OF P.O. Box 1035 ZIP 599oi-io35 Telephone (4o6) 755-5457 K A L I S P E L L, MONTANA TO: Mayor and Water & Sewer Committee FROM: Director of Public Works SUBJECT: Water Service Map by Hardy Cross Method DATE: September 9, 1982 Attached is a proposal from J, Jay Billmayer, P, E,, with regard to the above subject. This project is included in the budget item "Consultants", and was programmed for $6,000, The need for this project is summarized as follows: 1. Existing Conditions, It is necessary to know the shortfalls of the existing system serving the present population, As sections are replaced, the sizes can be increased if a bottle- neck exists and, in some cases, it may be possible to add short sections (less than 1,000 feet) to the grid to improve service. 2. Capabilities of the Existing System'to Serve More Customers. It is an objective to serve as many additional customers as possible on the existing system without decreasing services to the current customer. Each site of new development has certain limiting features. If the demand for water at a new site exceeds the capabilities of the existing system, it is the responsibility of the Developer to make improvements to the present system to meet the demand of the proposed development, 3. Projection of the Foreseeable Service Area. The objective is to project a logical service area for the imaginable future, As the City replaces components and Developers improve or ex- tend the existing system, the needs of future developments be- come imperative, The City can require increased facility sizes above the needs of a particular development, provided the City pays the cost of oversizing. The City can have a basis for oversizing components. Some of the shortfalls of the existing system are already known through our ex- perience, and the work done by the students at Montana State University has brought to light other weaknesses not so obvious. "lit the Heart of the Nation's Playgroiaid" Page 2 We are now in the throes of requiring the developer of Treasure State Plaza to make improvements to the existing system in order to meet fire flow require- ments. Throught the information this project will garner, we can have a plan available which will minimize such unfortunate and costly incidents. Oversizing of lines is always costly. With the configuration of the existing system, we need factual information on pipe sizing. The cost of this project can be saved many times over by avoiding oversizing beyond need or installation of cross piping which provides minimal benefit. I recommend we accept Jay Billmayerts proposal. Mr. Billmayer is experienced with this specialized engineering and he has and is working closely with MSU on just such analysis. ms R, T, H, 9(H ENC cc: Jeff Hughes Consulting Engineers Dean K Marquardt. P.E. J Jay B01mayer. P.E. 2191 Third Avenue East M Kalispell, Montana 59901 M (406) 257-8708 September 2, 1982 Honorable Mayor McDowell & Councilmen City of Kalispell Kalispell, Montana 59901 Re: Kalispell Water System, Engineering Analysis Gentlemen: We are pleased to propose the following Scope of Work and Fee Quote for a comprehensive Engineering Analysis of the dater supply and distribution facilities of Kalispell. The developed information will serve to guide the city in selection of expansion and rehabilitation projects and assist the city in assessing the impact of developments utilizing city services. Upon your authorization we are prepared to start work immediately. Respectfully Submitted M,ARQUARDT,BILLMAYER J J y B71lmayer, P.E. JJB/tj SCOPE OF 14ORK 1. SYSTEM REVIEW. A. Research of existing reports, as built plans of distribution grid, pump stations and storage reservoirs. Review of flow and reservoir draw down records, and hydrant tests. B. On site inspection to acquire flow and pressure measurements of selected segments of the distribution grid. Review of operational logic and switch settings for pump stations. 2. SYSTEM PERFORMANCE ANALYSIS. A. Determination of maximum hourly, maximum daily demand for current service area. B. Identify existing and currently anticipated high fire flow areas together with areas of future high fire flow as determined by the comprehensive plan. The city will provide the fire flow rates for the identified areas. C. Computer modeling of existing system. 1) Runs based on imposed demands and pressures at selected node points will be made to calibrate the model. 2) System performance will be simulated for the following conditions: a) Fire Flows - Central - Business Commercial Strip - West & East Commercial Strip - North & South b) Maximum hourly, maximum daily flow with existing grid and storage. c) Simulation with residual pressure fixed at selected points on the 'distribution system. 1 3. SYSTEM IMPROVEMENTS RECOMMENDATIONS. Critical areas identified by field observations and computer modeling will be cited. Apparent supply capability at residual pressure will be indicated for areas of high development potential. Recommend long range trunk mains future well sites and future storages requirements for a growth area established by the director of Public Works. 4. ABOVE INFORMATION. will be assembled in a report format and 4 copies submitted to the City Council. The report will provide sufficient information that the City can reprogram a computer to supply information as growth occurs. FEE SCHEDULE AND CONDITIONS 1. Fee for Engineering services and all anticipated expenses shall be fixed at $5800.00 2. Billings will be forwarded on a monthly basis as costs acrew with pay- ment due 15 days after date of invoice. 3. Should it be requested, a presentation will be made before the City Council 60 days from date of authorization to proceed. 4. Mr. Hafferman has indicated city personnel will be assisting in collet— tion of data, we have accordingly reduced our fee in anticipation of that assistance. Reviewed: Supt. Water & Sewer Date Recommended: Chairman, Water & Sewer Coin. Date Recommended: Approved: Director of Public Works Date Mayor 2 Date