Loading...
06. Addendum to North Side Water Well Engineering ContractThe Cit`� of Ka isle Incorporated 18992 Telephone (406) 758-7700 FAX (406) 7 58-7 7 78 Post Office Box 1997 Ka lis i 1, f'vinntana Zip 59903-1997 Date: August 21, 1996 To- Clarence Krepps, City Manager From: John Wilson, Assistant City Engineer, .e: Council Approval of Addendum to North Side 'Water well Engineering Contract This memo is to request the approval of the addendum to the North Side water well engineering contract be added to the August 23 rd Council 'work Session agenda. The original contract dates back to April 1994. At that time fees were negotiated for engineering services up through the test well drilling and. final design report phases. Fees for the final design and construction management phases were left for future negotiations. Douglas Rauthe ►",*1ayor Clarence W. Krepps City Manager City Council Members: Gary W. Nystul Ward 1 Cliff Collins Ward I Norbert F. Donahue Ward 11 Dale Haarr Ward 11 Jim Atkinson Ward IiI Lauren Granmo Ward III Pamela B. Kennedy Ward IV Mthough we do not have a finalized addendum to submit at this time, we will +' . Duane Larson certainly have completed negotiations before the September 9 regular meeting.. with. ward IV luck, we may have something to hand out on August 2 a . we would like to have approval on September 9th so we can move ahead for a mid -December start up on the well drilling schedule The project, which will be built on the commurnity college property, was temporarily derailed because of a conflict between drilling and school schedules. The college President has recently agreed for us to drill the new wells through the Christmas break and into the next semester. Although I have discussed the new schedule with Al, it is possible the Council thinks the project still is on hold until spring. cc: Debbie Gifflord. Clerk of Court +/ file