Loading...
3. Aquatic Facility Change OrderCity of Kalispell Post Office Box 1997 - Kalispell, Montana 59903-1997 - Telephone (406)758-7700 Fax(406)758-7758 To: Chris Kukuli CC: From: Mike Baker, Date: 5/6/2003 Re: Aquatic Fac The pool construction is moving along smoothly. The suspected problems with ground water have not materialized to the extent we had anticipated. The footings for the bathhouse are just about completed and excavation is taking place on the skate park, lazy river and parking area. A scheduled budget review is indicating that there is funding available for the concession stand and bathrooms that were previously withdrawn from the initial bid. Based on the enclosed construction administration project accounting spreadsheet we have approximately $98,500 in savings that could be applied to construct the bathrooms and concession stand. The savings are an accumulative amount resulting from the modified excavation, savings from owner provided products and the change in the water and sewer connections. The contractor has indicated that the amount of $98,500 could construct the concession stand and bathrooms in a roughed in condition. At this point, I would anticipate potential for further savings within the owner provided items as they have not been purchased to date and potentially additional credits that may be reflective by the contractor and finally by not expending all contingency funds. May 6, 2003 At any rate the scheduled construction completion is in October and the city would have the remaining fall and winter to complete the plumbing, electrical and carpentry inside the concession and bathrooms. It is the recommendation of the consultant to extend the construction contract to Swank Enterprises by $98,500 to complete the originally proposed concession stand and bathroom. I have enclosed the spreadsheet for the project accounting. Pq CITY OF KALISPELL LEISURE AQUATIC FACILITY KALISPELL - MONTANA ARCHITECTS DESIGN GROUP PC ADG: 01-131 5/6/2003 PROJECIr ACCOUNTING BUDGET LINE ITEMS BOND AMOUNT 1. BASE BID 1 OWNER PROVIDED PRODUCTS 3. CHANGE ORDERS 4. CONSTRUCTION CONTINGENCY 5. A/E BASIC SERVICE FEES 6. A/E DESIGNATED SERVICE FEES 7. A/E REIMBURSABLE EXPENSES 8. QUALITY CONTROL TESTING 9. MISCELLANEOUS CURRENT COST $2,693,000 $416,993 $3,840 $146,160 $188,005 $124,160 $51,446 $lljoo $25,000 TOTAL $3,675,000 $3,659,704 DIFFERENCE = BOND -CURRENT COST $15,296 ITEM DATE BUDGET REVISIONS AGREEMENT SUB -TOTAL -1. BASE BID Swank Enterprises Base Bid 216103 $3,106,580 $0 $2,693,000 $2,693,000 Construction Review of Project Cost 1 ITEM DATE BUDGET REVISIONS AGREEMENT SUB -TOTAL 2. OWNER PROVIDED PRODUCTS A. Water Tower and Slides 5/2/03 Bid $163,720 B. Water Attractions Zero Entry Pool 5/2103 Did $42,860 C. Diving Boards 121 $3,500 D. Handicapped Ramp $4,720 E. Landscaping $7,500 F. Irrigation $7,500 G. Tables and Trash Recepticles $4,890 H. Site Funiture $2,500 I. Canopies, [2] Unbrella $8,700 J. Lockers, Plastic Type $14,000 K. Concession Equipment $5,000 L. Lazy River Attractions $21,625 M Water and Sewer Connection Fees -Meters S29,736 N. Colored CMU Addition Funded by Parks $2,242 0. Concession Building -Revised Funded by Parks $98,500 3. CHANGE ORDERS A. Contractor Initiated No. 5 Dawatering and V.E. Gravel $o B. Architect Initiated No 3 Electrical Power to Hand D-ryers $2,213 No. 4 Fire Extinguisher Cabinet $467 No. 7 Upgrade Mirrors $660 No. 8 V.E. Exterior Sign Cx(xk Estimate No. 9 Exit Door from Pool Pump Room Estimate $2,000 C. Owner Initiated No, I Colored CMU Added No. 2 Concession As Bid No. 6 Concessions Building -Revised 4. CONSTRUCTION CONTINGENCY A. Construction Contingency & Equipment Contingency C. Sub -Total B. Contingency Reductions [Change Orders] C. Current Contingency Total Funded Under Item 2-N, Above Not Accepted Funded Under Item 2-0. Above $0 $0 $o $416,993 $3,840 $3,840,00 $146,1.60.00 $146,1.60 C-onstracfiouaeui=_oLRwiact Cast 46,160 ITEM DATE BUDGET REVISIONS AGREEMENT SUB -TOTAL 5. AfE BASIC SERVICE FEES A. AIE Basic Senrice Fees Pool $183,035 Skate Park $2,970 B. Less Current Due -Paid 7131102 $o C. Sub -Total $188,005 $188P5 $188,005 6. A/E DESIGNATED SERVICE FEES NO= �=_ Pre -Funding $35,620 Pool $63,120 Skate Park $25,420 B. Less Current Due -Paid 7/31/02 $0 C. Sub -Total $124,160 $124,160 $124,160 7. A/E REIMBURSABLE EXPENSES A. A/E Reimbursable Expenses Pool $46,646 Skate Park $4,800 B. Less Current Due -Paid 7/31/02 ($14,228) C. Sub -Total $37,218 $51,446 $5 IW Construction Review of Project Cast ITEM DATE BUDGET REVISIONS AGREEMENT SUB -TOTAL 8. QUALITY CONTROL TESTING A- Geotechnical Survey $6,300 B. Special Quality Control Services $4,800 D. Less Current Due -Paid E. Sub -Total 9. MISCELLANEOUS NOTES $0 $11,100 $11,100 $11,100 $0 $25,00t) $25,(X)O Construction Review of Projmt Cost.