Loading...
1. Upper Zone Water Storage and Productionpity of Kalispell Public Works Department Post Office Box 1. 997 , Kalispe 11, Montana 5 990 - � o - , 'Fax 40 5 -7 8 31 REPORT TO: Mayor and City Council FROM: James C. Hansz, P.E., Director of Public W SUBJECT: Upper Zone ''water Storage and Production Yioject — ConkuWant Presentation MEETING DATE: 28 November 2005 The 2002 Kalispell Facility Flan identified critical needs for addItional water storage and water production capability 1n the City`s upper water pressure zone. This water service area serves most of north Kalispell and virtually all the new developing areas west of Kalispell along Three Mile Drive. The current budget includes .funds for both new production facilities (water well) and additional storage water tam.) within the upper pressure zone. The first task of this project was to identify the most appropriate location(s) for these new facilities. Robert Peccia and Associates was retained to engineer these projects and the Peccia engineers have devoted. their initial e forts to accomplishing these 'important first steps for the project. Storage needs and production .seeds were dealt with as separate but related issues. Several potential storage tank sites for at -grade, elevated, and in -ground tanks were identified and assessed. Tank location is generally constrained by topography and the need to match existing operating pressures within the service zone. Tank options also were assessed for cost -to - budget and optimum size In light of recent growth in the service zone. A desirable site has been identified and the landowner has indicated a willingness to work with the City on this project. Similarly, water well sites were investigated with several Factors in mind. Among these were possible prop mity to a new tank (for maximizing use of acquired land), optimum locations for attachment to existing distribution facilities, potential for high rates of production, and potential .for using existing City -owned property to reduce costs. Robert peia engineers will be at the work session to discuss the first phase of work and their recommendations. ember 28, 2005 Upper Zone W ater Proi ectdo