7. Award Bid - Sidewalk Replacement ProjectCity of Kalis Post Office Box 1997 • Kalispell, Montana 59903-1997 • Telephone (406) 758.7700 • FAX (406) 758-7758 REPORT TO: Mayor and City Council FROM: Jim Hansz, Director of Public Works SUBJECT: Award Bid, 2001 Sidewalk Replacement Project MEETING DATE: May 7, 2001 BACKGROUND: The FY 2000/2001 budget includes appropriated funds in the Downtown Urban Renewal District (TIF) and Gas Tax categories for sidewalk replacement. The amounts budgeted are TIF funds of $75,000.00, and Gas Tax Funds of $25,000.00. Gas Tax funds are presently being reserved to fund the City's required match on the NW Sidewalk installation project for with we received a $600,000.00 MACI program grant last year. Therefore, the annual Sidewalk Replacement project was developed around the TIF budget. Bids for work at 14 sites were due on April 25`". Bids were received from Sandon Construction in the amount of $74,018.00 and from Marriot Concrete in the amount of $79,996.50. Bid details are shown on the attached staff memorandum. A Supplemental Bid was obtained to allow adjacent property owners to replace walks on their property at the same time. This bid data is included with the staff memo. RECOMMENDATION: We recommend award of the 2001 Sidewalk Replacement contract to Sandon Construction based on their low bid of $74,018.00. We also recommend acceptance of their Supplemental Bid. FISCAL EFFECTS: Expenditure of budgeted funds as indicated. ALTERNATIVES: As suggested by the City Council 3dmes C. HanszR-E./ Chris A. Kukulski Director of Pub orks / City Engineer City Manager Report compiled April 30, 2001 MEMORANDUM DATE: April 27, 2001 TO: James Hansz, Director of Public Works FROM: Fred Zavodny, Project Manage RE: City of Kalispell Sidewalk Rep acement Project — Bid Analysis Recommendation Bids for the City of Kalispell Sidewalk Replacement Project were received from Sandon Construction and Marriott Concrete. All bids are in order and contained the required Bid Bond. The bid was comprised of fourteen individual sites. A lump sum price was requested for the total of the fourteen sites. The bid totals are as follows: Sandon Construction $74,018.00 Marriott Concrete $79,996.50 The Public Works Department's estimate for the fourteen sites amounted to $74,000.00. There are sufficient monies in the budget for this project. A Supplemental bid was included in the contract to enable the owners of property adjacent to the project sites the opportunity to have sections of their walkways repaired in conjunction with this project. The Supplemental Bid establishes fixed prices for this work. The prices quoted by Sandon are consistent for this type of work. A copy of the Supplemental Bid is attached. The property owner will pay the contractor directly for this work. I am recommending the bid for the City of Kalispell Sidewalk Replacement Project be awarded to Sandon Construction in the amount of $74,018.00. It is also recommended that Sandon's Supplemental Bid be accepted. SUPPLEMENTAL BID The Supplemental Bid may be utilized toexpand the con struction of sidewalks beyond the original scope of the City of Kalispell Sidewalk Replacement Project: The Contractor shall provide excavation, materials, labor and equipment required to construct sidewalks to the project specifications. BID ITEM DESCRIPTION UNIT- EST. QUANTITY UNIT PRICE 1. 4" Thick Sidewalk SF Any Quantity �D 2. Landscaping SF Any Quantity A SO 3. Concrete Sidewalk_ LF Any Quantity Sawcutting The bid sheets shall not be removed from this document. The entire document shall be submitted as a bid. Date Mailing Address J r, A,&Z /77/1 /JOA- Phone r gnature o.Pi 'i3 S/�NooN Montana Contractor's Registration Number G�fEkrjc i:. SC90 V. o . l3ax 5557 Page I of 1 G