REPORT TO: Mayor and City Council
FROM: Jim Hansz, Director of Public Works
SUBJECT: Award Bid, 2001 Sidewalk Replacement Project
MEETING DATE: May 7, 2001
BACKGROUND: The FY 2000/2001 budget includes appropriated funds in the Downtown
Urban Renewal District (TIF) and Gas Tax categories for sidewalk replacement. The amounts
budgeted are TIF funds of $75,000.00, and Gas Tax Funds of $25,000.00. Gas Tax funds are
presently being reserved to fund the City's required match on the NW Sidewalk installation
project for with we received a $600,000.00 MACI program grant last year. Therefore, the annual
Sidewalk Replacement project was developed around the TIF budget. Bids for work at 14 sites
were due on April 25`". Bids were received from Sandon Construction in the amount of
$74,018.00 and from Marriot Concrete in the amount of $79,996.50. Bid details are shown on the
attached staff memorandum. A Supplemental Bid was obtained to allow adjacent property owners
to replace walks on their property at the same time. This bid data is included with the staff memo.
RECOMMENDATION: We recommend award of the 2001 Sidewalk Replacement contract to
Sandon Construction based on their low bid of $74,018.00. We also recommend acceptance of
their Supplemental Bid.
FISCAL EFFECTS: Expenditure of budgeted funds as indicated.
ALTERNATIVES: As suggested by the City Council
3dmes C. HanszR-E./ Chris A. Kukulski
Director of Pub orks / City Engineer City Manager
Report compiled April 30, 2001
MEMORANDUM
DATE: April 27, 2001
TO: James Hansz, Director of Public Works
FROM: Fred Zavodny, Project Manage
RE: City of Kalispell Sidewalk Rep acement Project — Bid Analysis Recommendation
Bids for the City of Kalispell Sidewalk Replacement Project were received from Sandon
Construction and Marriott Concrete. All bids are in order and contained the required Bid Bond.
The bid was comprised of fourteen individual sites. A lump sum price was requested for the
total of the fourteen sites.
The bid totals are as follows:
Sandon Construction $74,018.00
Marriott Concrete $79,996.50
The Public Works Department's estimate for the fourteen sites amounted to $74,000.00. There
are sufficient monies in the budget for this project.
A Supplemental bid was included in the contract to enable the owners of property adjacent to the
project sites the opportunity to have sections of their walkways repaired in conjunction with this
project. The Supplemental Bid establishes fixed prices for this work. The prices quoted by
Sandon are consistent for this type of work. A copy of the Supplemental Bid is attached. The
property owner will pay the contractor directly for this work.
I am recommending the bid for the City of Kalispell Sidewalk Replacement Project be awarded
to Sandon Construction in the amount of $74,018.00. It is also recommended that Sandon's
Supplemental Bid be accepted.
SUPPLEMENTAL BID
The Supplemental Bid may be utilized toexpand the con
struction of sidewalks beyond the
original scope of the City of Kalispell Sidewalk Replacement Project:
The Contractor shall provide excavation, materials, labor and equipment required to
construct sidewalks to the project specifications.
BID ITEM DESCRIPTION UNIT- EST. QUANTITY UNIT PRICE
1. 4" Thick Sidewalk SF Any Quantity �D
2. Landscaping SF Any Quantity A SO
3. Concrete Sidewalk_ LF Any Quantity
Sawcutting
The bid sheets shall not be removed from this document. The entire document shall be
submitted as a bid.
Date
Mailing Address
J r, A,&Z /77/1 /JOA-
Phone r
gnature o.Pi 'i3 S/�NooN
Montana Contractor's Registration Number
G�fEkrjc i:. SC90
V. o . l3ax 5557
Page I of 1
G