Loading...
E/5. Modification to CTEP Project Agreement - Lawrence Park TrailCity of Kalispell Post Office Box 1997 - Kalispell, Montana 59903-1997 - Telephone (406)758-7700 Fax(406)758-7758 REPORT TO: Honorable Mayor and City Council FROM: Michael Baker, Director of Parks & Recreation SUBJECT: Modification to the CTEP General Project Development and Construction Agreement - 1996 Lawrence Park Tr-Kal MEETING DATE: June 18, 2001 BACK GROUND: A modification to the CTEP General Project Development and Construction Agreement for the 1996 Lawrence Park Tr-Kal has been requested by MDT. The standard revision of the original design and construction estimates is necessary upon submittal of the final design and engineers construction estimates. The pedestrian/bicycle trail is = 1,600 feet long and 10 feet wide, inclusive of 2 bike racks, 4 pedestrian benches, and the main component, a pedestrian bridge across the Stillwater River. This section of the trail will allow for an uninterrupted pedestrian trail from Reserve Drive to North Main and Highway 93 North. The project began in 1996 with the preliminary engineering estimates. After extensive review by MDT the final design and engineers construction estimates were revised and submitted. The following modifications are needed as follows: Total Project CTEP Funds City Match Total FY2002 Budget $197,058.00 $170,612.00 $26,445.00 Total Modification $239,697.00 $207,531.00 $32,166.00 Difference $42,639.00 $36,919.00 $5,720.00 RECOMMENDATION: Adopt and sign agreement Modification with the State of Montana to include increase from $197,0580.00 to $239,697.00. Honorable Mayor and City Council Page Two FISCAL EFFECTS: Minimal. FY2002 budget is adjusted to accommodate the new estimates. This increase in funding will not require additional dollars, as the CTEP account has the funds from previous year's contributions to allow for this adjustment.. ALTERNATIVES: As Councils recommends. Respectfully submitted, Michael Baker, Director of Parks Attachments - CTEP Modification Agreement CAA Chris Kukulski, City Manager Report Compiled June 12, 2001 w Montana Department of Transportation David A. Galt. Director 2701 Prospect Avenue Judy Martz, Governor PO Box 201001 Helena MT 59620-1001 June 7, 2001 Mike Baker - Director Parks Dept City of Kalispell PO Box 1997 Kalispell MT 59901-1997 Subject: Modification to the CTEP General Project Development and Construction Agreement Project No.: STPE 67-99(15) Project Name: 1996 LAWRENCE PARK TR-KAL Control No.: 3220 The Montana Department of Transportation has received your request to modify the General Project Development and Construction Agreement. After all original documents have been signed and sealed by the City Officials, return all originals to the CTEP Office. After our Chief Engineer has signed all originals, we will return one original to you, for your files. All Agreement changes are shown in bold type. Under WITNESSETH, fourth paragraph: WHEREAS, the total estimated cost of the project development and construction totals $239,697; and, Section 1. Will be modified to read: "Design and construction for an asphalt surfaced pedestrian/bicycle trail approximately 1,600 feet long and 10-foot wide including two bike racks, four pedestrian benches, one pedestrian bridge and appropriate signing in accordance with current design standards and ADA requirements." Preliminary Engineering: (Including environmental documentation) Right-of-Way/Easement Acquisition: Incidental Construction: Construction: Construction Engineering: (Including contract administration and inspections) Project City of Kalispell $ 239,697 TOTAL $ 239,697 CTEP Funds $ 45,771 $ -0- $ -0- $186,380 $ 7,546 Local Match $ 207,531 $ 32,166 $ 207,531 $ 32,166 ADD. Contribution $ 0 The Local Agency will engage a project engineer for the preliminary engineering, contract bid document preparation and construction engineering. Construction will be by competitive Community Transportation Enhancement Program Rail, Transit, and Planning Division Phone: (406) 444-3423 An Equal Opportunity Employer TTY: (800) 335-7592 Fax: (406)444-9451 Web Page: www.mdLstate.mGus bid. The State will perform a final inspection to ensure substantial compliance with project plans, specifications and estimates. 8. That the Federal participation in this project will be $207,531 and the Local Agency will be responsible for the matching funds that total $32,166. The Local Agency will be responsible for 100% of the project costs, exceeding the proposed $239,697, required to complete the work described in item 1 above. 9. That the Local Agency may submit a claim detailing items and quantities of acceptable work completed that period to the CTEP Engineering Coordinator, at most monthly, for 100% of the project development and/or construction costs incurred. Documentation will accompany the request substantiating the amount requested. The Local —.Agency will also request State processing of the 86.58% federal participation reimbursement payment that is not to exceed a cumulative amount of $207,531. All other terms of the original agreement will remain in full force. Upon receipt of the signed and sealed, agreement modification we will send you a notice identifying the next step to be taken in the development of your project. IN WITNESS WHEREOF, the Director of Transportation or his authorized representative has hereunto subscribed his name for the State of Montana and the Mayor of the City of Kalispell for said Local Agency, has subscribed his or her name and affixed hereto the seal of said Local Agency. DATED this day of 20_ STATE OF MONTANA, DEPARTMENT OF TRANSPORTATION David A. Galt Director of Transportation EN Gary Gilmore, P.E. Chief Engineer, Engineering Division CITY OF KALISPELL ATTEST Local Agency Official City Clerk Mayor I, Clerk of the City of Kalispell, do hereby certify that the Council of the City regularly adopted this agreement modification at a meeting held on the _ day of , 20 , and that the Council of the City of Kalispell authorized the Mayor to sign this agreement for said Council. City Clerk [OFFICIAL SEAL]