Loading...
E/4. Modification to CTEP Project Agreement - Meridian Trail ConnectorCity of Kalispell Post Office Box 1997 - Kalispell, Montana 59903-1997 - Telephone (406)758-7700 Fax(406)758-7758 REPORT TO: Honorable Mayor and City Council FROM: Michael Baker, Director of Parks & Recreation SUBJECT: Modification to the CTEP General Project Development and Construction Agreement - Meridian Trail Connector MEETING DATE: June 18, 2001 BACK GROUND: A modification to the CTEP General Project Development and Construction Agreement for the Meridian Trail Connector has been requested by MDT. The standard revision of the original design and construction estimates is necessary upon submittal of the final design and engineers construction estimates. The trail begins at the intersection of Meridian Road and Highway 93, traveling along the west side of Highway 93 to the KYAC, then along Four Mile Drive to the soccer fields. The trail is 5,235 feet in length, 8 feet wide, in accordance with the current design and ADA requirements. Also inclusive is landscaping to plant 50 trees, install 5 pedestrian benches, a retaining wall and appropriate signing and easement acquisitions. After original Preliminary Engineering was completed, the project scope was substantially increased to include an additional c 1,000 feet of trail with landscaping and trees. Trail modifications were required to better serve the entire KYAC site and accommodate handicap access. Modification of the Preliminary Engineering, Construction and Construction Engineering costs are needed as follows: Total Project CTEP Funds City Match Total Original $113,490.00 $98,260.00 $15,230.00 Total Modification 197,074.00 170,627.00 26,447.00 Difference $83,584.00 $72,367.00 $11,217.00 Honorable Mayor and City Council Page Two RECOMMENDATION: Adopt and sign agreement Modification with the State of Montana to include increase from $113,490.00 to $197,074.00. FISCAL EFFECTS: Minimal. FY2002 budget is adjusted to accommodate the new estimates. This increase in funding will not require additional dollars, as the CTEP account has the funds from previous year's contributions to allow for this adjustment. ALTERNATIVES: As Councils recommends. Respectfully submitted, Michael Baker, Director of Parks Attachments - Modification Agreement C "A Chris Kukulski, City Manager Report Compiled June 12, 2001 MVMontana Department of Transportation David A. Galt, Director 2701 Prospect Avenue Judy Martz, Governor PO Box 201001 Helena MT 59620-1001 May 16, 2001 Mike Baker — Dir parks & Recreation City of Kalispell PO Box 1997 Kalispell MT 59901-1997 Subject: Project No.: STPE 6799(23) Project Name: MERIDIAN TRAIL CONNECTOR-KAL Control No.: 4176 The Montana Department of Transportation has received your request to modify the General Project Development and Construction Agreement. After all original documents have been signed and sealed by the City Officials, return all originals to the CTEP Office. After our Chief Engineer has signed all originals, we will return one original to you, for your files. All Agreement changes are shown in bold type. Under WITNESSETH, fourth paragraph: WHEREAS, the total estimated cost of the project development and construction totals $197,074; and, Section 1. Will be modified to read: "Design and construction for a pedestrian path that includes: sub -grade preparation and asphalt surfacing for a path about 8-feet wide and approximately 5,235 feet in length in accordance with current design standards and ADA requirements. Also included is landscaping to plant about 50 trees, install 5 pedestrian benches, a retaining wall construction, appropriate signing and easement acquisition." Preliminary Engineering: (Including environmental documentation) Right-of-Way/Easement Acquisition: Incidental Construction: Construction: Construction Engineering: (Including contract administration and inspections) City of Kalispell TOTAL Project CTEP Funds $ 197,074 $ 170,627 $ 197,074 $ 170,627 $ 21,655 $ -0- $ -0- $163,085 $ 12,334 Local Match ADD. Contribution $ 26,447 $ 0 $ 26,447 $ 0 Community Transportation Enhancement Program Rail, Transit, and Planning Division Phone: (406) 444-3423 An Equal Opportunity Employer TIY: (800) 335-7592 Fax: (406)444-9451 Web Page: v vmdrstate.mtus The Local Agency will engage a project engineer for preliminary engineering, contract bid document preparation and construction engineering. Construction will be by competitive bid. The state will perform a final inspection to ensure substantial compliance with project plans, specifications and estimates. 8. That the Federal participation in this project will be $170,627 and the Local Agency will be responsible for the matching funds that total $26,447. The Local Agency will be responsible for 100% of the project costs, exceeding the proposed $197,074, required to complete the work described in item 1 above. 9. That the Local Agency may submit a claim detailing items and quantities of acceptable work completed that period to the CTEP Engineering Coordinator, at most monthly, for 100% of the project development and/or construction costs incurred. Documentation will accompany the request substantiating the amount requested. The Local Agency will also request State processing of the 86.58% federal participation reimbursement payment that is not to exceed a cumulative amount of $170,627. All other terms of the original agreement will remain in full force. Upon receipt of the signed and sealed, agreement modification we will send you a notice identifying the next step to be taken in the development of your project.