Loading...
3. Resolution 4599 - Contract Supplement #7 for Meridian Road40 City of Kalispell Past Office Box 1997 - Kalispell, Montana 59903-1997 -Telephone (406)758-7700 Fax(406)758-7758 REPORT TO: Mayor and City Council FROM: Jim Hansz, Director of Public Works SUBJECT: Contract Supplement #7, Meridian Road Project Design & Right of Way Acquisition MEETING DATE: February 5, 2001 The Meridian Road Project has been in the works for many years. In April 1999 contract supplement #6 was approved so that the consultant could immediately begin all the work necessary to acquire right of way for construction. Normally MDT staff would have performed this work. However MDT was unable to do this because of an increased workload from the TEA-21 program. Since April 1999, the consultant's work has moved generally forward until about two months ago. At that point the utility companies reassessed their ROW needs and additional ROW was specified. This change caused significant concern because approximately one half of the affected parcels were negotiated and checks had been issued completing the purchase. The additional requirement has been incorporated into the design and now must be acquired. This has added unbudgeted costs for redesign along most of the project length, and has required new negotiations for completed parcels. Supplemental funds are required for this added work. Supplement #7 totals $48,551.84 and includes the costs of the primary engineering consultant and sub- contracted costs of the right of way contractor. Approval of this supplement will raise the contract ceiling to $820,841.14. We have reviewed the request and find the costs to be normal and consistent for the intended work. RECOMMENDATION: A motion to approve a Resolution for Supplement #7 raising the Meridian Road design contract ceiling from $772,289.30 to $820,841.14. FISCAL EFFECTS: There is no cost to the City of Kalispell. MDT pays all costs for design and right of way acquisition after review by the City of Kalispell. ALTERNATIVES: As suggested by the City Council Respectfully submi .. Hansz, E. Chris A. Kukulski Director of Public Wor ity Engineer City Manager Report compiled January 25, 2001 RESOLUTION NO. 4599 A RESOLUTION TO ALTER AND AMEND THE CONTRACT WITH ROBERT PECCIA AND ASSOCIATES ON THE NORTH MERIDIAN ROAD RECONSTRUCTION PROJECT, STPU 6701(6). WHEREAS, the City on October 10, 1995 did enter into a contract with Robert Peccia and Associates, Helena, MT for the reconstruction of North Meridian Road and WHEREAS, certain elements in the project required additional work, as well as time to complete; and said additional work and time requirements could not have been necessarily foreseeable when the original construction contract was entered into, and said changes are contained in Exhibit "A", attached hereto and are by this reference made a part hereof; and WHEREAS, upon the advice and recommendation of Jim Hansz, Public Works Director, it appears in the best interests of the City to approve said changes and alterations. NOW THEREFORE, pursuant to the provisions of Section 7-5- 4308(1) MCA be it hereby resolved: 1. The alterations and modifications of the contract between the City of Kalispell and Robert Peccia and Associates, dated January 17, 2001, as set out in Exhibit "A" attached hereto are hereby approved, and 2. As soon as the alterations and modifications are agreed to in writing, signed by the City Manager, as hereby approved by the Council, this approval thereof shall be in effect. PASSED AND APPROVED BY THE CITY COUNCIL AND SIGNED BY THE MAYOR OF THE CITY OF KALISPELL THIS 5TH DAY OF FEBRUARY, 2001. Wm. E. Boharski Mayor ATTEST: Theresa White City Clerk V:\attsect\wp\res\4599 north meridian.wpd CIVIL, TRANSPORTATION, ENVIRONMENTAL, ENGINEERS P.O. Box 5653 825 Custer Avenue Helena, Montana 59604 14061447.5000 FAX 1406)447-5036 www.rpa-hln.com January 19, 2001 Jim Hansz, P.E. Director of Public Works/City Engineer City of Kalispell P.O. Box 1997 Kalispell, MT 59903-1997 Subject: STPU 6701(6) North Meridian Road Kalispell Dear Jim: Attached is a revised cost proposal for revising the plans and re -appraising parcels to which an additional 1-meter of right-of-way was added. It is our understanding that after utility plan -in -hands have been conducted, the MDT Right -of -Way Bureau will determine whether or not it will be necessary to reopen the nine closed parcels to obtain additional rights -of -way. For this reason, reappraisal and renegotiations of the nine closed parcels was removed from the original cost proposal. Negotiation of the remaining parcels will continue during the re -appraisal of the 12 parcels that were not closed. Let me know if you have any questions or if there is any additional information you need. Sincerely, ROBEERT PE�CCIA AND ASSOCIATES Gordon L. Larson, P.E. Manager, Streets and Highways Division cc: File \\SER VER_ I \VOL2\HIGHWAYS\MERIDIAN\CORRESPO\011701J H.LTR CONTRACTSUPPLEMENT- NO.7(ReVlsed 1117101)• RIN ST. PLAN REVISIONS $POPE OF SERVICES AND COST PROPOSAL ROBERT PECCIA AND ASSOCIATES NORTH MERIDIAN ROAD - KALISPELL CONTROL NUMBER 29M 174U 1 WORKREMS PROJECT MANAGER PROJ CT ENGINEER 522.40 PROJECT DESIGNER S1B.3B CADO OPERATOR $10.90 ADMIN. ASSIST. 31398HOURS TOTAL RPA CARD TIME SS0000MlmU PC TIM531.94 wt.nd MDT flnsll3ln submwdendopne94tsR NmsMR 46 4.0 IneRem2 12 14 smsls 218 92B 240 4. CcerNnstlonwlMntand MDTDudn A rAlssls 4 4B 40T.Mn p1A SuhmlWl to MOT 1 S 7 4Co fln4U4n hnt 4ntl MOT UuHn N Ustlons 2 4 B 2.0 2.0 7. A4u.tA rwehss Ad wt LSsctl4n4, Rsvlw Ou4ntl1144 R.I.R uswfw CM Eta. P4Wss C9nsl Phm otl,b Chsn 6 40 24 70 40.0 4.0 B. NwOn whh Wltlolsnsn EstlmAW 1 2 $ 10 2.0 e. A.]. W N . NU snd Suhmitdl nl Clw. Dxumenb 1 2 y 20 t0. Grwn Shwb Om rwn 4hwllOr l2 rwl4 4 6 24 b 8.0 I6.0 tt R4vlwendU .WRIWPIme 2 40 24 1 40.0 4 2 32 3B 21.0 2.0 pPl..RTl.[..,f.,FaI,mnd. 3a B 1Be SB 1 2BB IQOR COSTS $1,OT1.]8 1178.20 St.W.71 S1134.40 $1399 S5.147.66 5710.00 SBB.00 LABOR COSTS RPA OVER- LOADED DIRECT HEAD SPA SUBTOTAL VISOR COSTS $5.197.66 18.165.5s $13,$1LI21 OIRECTJOBCOSTS TOTAL SUBTOTAL DIRECT COSTS $2e32800 CONTINGENCIES 10% SLOCI I. �15' ,. PROM TOTALPROPOSAL SuppiwT.4Ua PHASES 1b2 $4,265.13 S46,We.M b1,502.40