5. Reject Bid - 911 Dispatch Center Remodel - Police DeptREPORT: The Kalispell Department Honorable Mayor and City Council MOM: Frank Gamer, Chief of Police SUBJECT: Dispatch Remodel January 11, 2001 BACKGROUND: In 1994 the Kalispell Police Department answered 13,695 calls for service using the same equipment and manpower as we use today. In the year 2000 the Kalispell Police Department answered 18,623 calls for service, a 36% increase in six years. The current staffing level and environmental design will no longer accommodate the service need. As part of our strategic plan to ensure the safety of our residents through improving all of our public safely access points we have developed a comprehensive site plan. We have included a schematic design of the proposed concept. The estimate for the project is $43,000.00. 7bat estimate includes all design, construction and installation costs associated with the project. See attached cost sheet. The project should be funded through either tax increment financing fimds, 911 fiords or a combination thereof. RECOMMENDATIONS: The council should accept a competitive bid based on a comprehensive RFP for the project. The council should be prepared to support the funding ofthe project through tax increment funds, 911 funds or a coQ►bmation thereof. FISCAL EFFECTS: ALTERNATIVES: Respectfully su ' ed, Gamer Chief of Police As described. As recommended by Council. (.s . ` Chris Kukulski City Manager Frank Gamer, Chief of Police • Jim Brown, Asst. Chief of Police • KPD phone (406) 758-7780, FAX (406) 758.7799 Inn I., Avn V.., V.Ii..AI MT WO M The following is a breakdown of the approximate costs associated with the new design for the Kalispell Police Department Dispatch center: 2. 3. 4. Watson Furniture Company - Design, installation and purchase costs Cosner Comtech $32,235.00 - Removal and temporary installation of all dispatch related equipment - Installation of all dispatch equipment to permanent location $ 3,800.00 Lilienthal Insulation Company - Sound panel purchase and installation Carpet - To be bid 5. Associated and anticipated additional costs - Relocation of inside/outside monitoring system - Relocation of phone & 911 lines - Framing and installation of north and south walls (for wiring and sound purposes) - Tear down and removal of old dispatch furniture $ 2,800.00 approx. $ 1,500.00 $ 2,800.00 Total $43,135.00 Oct 25 00 11:01a Watson Dispatch _nl N 1 N V-11 11/16" 61-5 11/16" 2068423290 p.2 PLEASE VERIFY ALL OM9ENSIONS THIS MATEIOAL NAY NOT Be RUMU CED IN ANY FORM WRNOIrt PAW FEMISVON FRDM WY16OM FYmODTs PROJECT: KALISPELL POLICE DRAWN Br. DATE CHBOM BY: DATE OMON WATSON, DISPATCHCLIENT: CDM�AINICATIOM CENTER W_N IQ 2WD _ PLAN A OF LOCATION: 1(AuRPEL i . MT 11779 B NNn Rand NE - REV BBInbfto blued PROJECT MANAGER: WN FILE: SCALE; BASIK 2DP W BBttO VEo Dare KGI ISPFLLA 1/4° = I' POWERGEAR Dec 05 00 11:33a Watson Dispatch QUOTATION Watson Furniture Systems 12715 miller Road N.B. Bainbridge Island, WA 98110 (206) 842-6601 To: Ralispell Police Dept. Attn: Jim Brown 2068423290 p.2 No.: 001205WNI Date: 1215/00 Expiration Date: 3/6/01 PROJECT: Dispatch Console Furniture Plan A Quantity Description unit Extension 1 ea. Basik 2DP 90* PowerGear Position $7,405.00 $7,405.00 Position 1 Includes: Electronically Adjustable Primary Worksurface Articulating Keyboard Platform 48" and 78" High Panels Front Access to Extension Cavities 1 ea. Box, Box, File Storage Pedestal 1 ea. 48" Overhead Storage Unit with Door 1 ea. 42" Overhead Storage Unit with Door 1 ea. Desk Top Phone Mount (2-High) 1 ea. Basik 2DP 90* PowerGear Position $7,135.00 $7,135.00 Position 2 Includes: Electronically Adjustable Primary Worksurface Articulating Keyboard Platform 48" and 78" High Panels Front Access to Extension Cavities 1 ea. Box, Box, File Storage Pedestal 2 ea. 36" Overhead Storage Unit with Door 1 ea. Pull -Out Keyboard Tray 1 ea. Basik 2DP Straight -Line PowerGear Position $7,135.00 $7,135.00 Position 3 Includes: Electronically Adjustable Primary Worksurface Articulating Keyboard Platform 78" High Panels Front Access to Extension Cavities 1 ea. Box, Box, File Storage Pedestal 1 ea. 36" Overhead Storage Unit with Door 1 ea. 48" Overhead Storage Unit with Door 1 ea. Desk Top Phone Mount (2-High) 1 ea. Wdeep x 72"wide Basik 1 Credenza $530.00 $530.00 1 ea. Installation $6,830.00 1 ea. Delivery $3,200.00 GRAND TOTAL $32,235.00 I. Taxes are not included State and Local taxes unll apply unless proof of exemption is provided with the purchase order. 2. 50% Deposit with order; Net 30 days from Shoment of Product. 3. Chairs are for representational purposes only. 4. Lead time 60.90 days after receipt of purchase order issued to Watson Furniture Systems. Completed order consists of signed Contract or Purchase Order, Signed drawings, Signed Color Selection Sheet and 50%Deposit. W LN 16.)de Jan 17 01 03:57p Watson Dispatch 2068423290 p.2 Watson Furniture Systems 12715 Dliiller Road N.E. Bainbridge Island, WA 9S310 (206) 842-6601 To: Ralispell Police Dept. Attn: Jim Brown QUOTATION No.: Date: Expiration Date: 010117WN2 1/17/01 4/18/01 PROJECT: Plan A Phase I . Dispatch Furntiure 1 ea. Basik 2DP 90* PowerGear Position $7,135.00 $7,135.00 Position 2 Includes: Electronically Adjustable Primary Worksurface Articulating Keyboard Platform 48" and 78" High Panels Front Access to Extension Cavities 1 ea. Box, Box, File Storage Pedestal 2 ea. 36" Overhead Storage Unit with Door 1 ea. Pull -Out Keyboard Tray 1 ea. Basik 2DP Straight -Line PowerGear Position $7,135.00 $7,135.00 Position 3 Includes: Electronically Adjustable Primary Worksurface Articulating Keyboard Platform 78" High Panels Front Access to Extension Cavities 1 ea. Box, Box, File Storage Pedestal 1 ea. 36" Overhead Storage Unit with Door 1 ea. 48" Overhead Storage Unit with Door 1 ea. Desk Top Phone Mount (2-High) 1 ea. 24"deep x 72"wide Basik 1 Credenza $530.00 $530.00 1 ea. Installation $4,200.00 $2,500.00 1 ea. Delivery GRAND TOTAL $21,500.00 ' Installation Charges Based on Separate Trip from Phase U. 1. Taxes are not included. State and Local taxes will apply unless proof of exemption is provided with the purchase order. 2. 50%Deposit with order; Net 30 days from Shipment of Product. 3. Chairs are for representational purposes only. 4. Lead time 60-90 days after receipt ofpurchase order issued to Watson Furniture Systems. Completed order consists of signed Contract or Purchase Order, Signed drawings, Signed Color Selection Sheet and 50%Deposit. W LN 16.xls Jan 17 01 03:58p Watson Dispatch 2068423290 p.5 5'-11 7/8" — 9'-7 11 6'-10 1 /4" PLEASE VERIFY ALL DIMENSIONS THIS MATERIAL MAY NOT BE REPRODUCED IN ANY FORM WITHOUT PRIOR PERMISSION FROM Wa19on Fumilurs WATSON PROJECT: KALISPELL POLICE DRAWN BY: DATE CHECKED BY: DATE OPTION CLIENT: COMMUNICATIONS CENTER WN 1/ul� PLAN A of DISPATCH LOCATION: KALISPELL. MT 12725 B Miller Road HE REV Bainbridge Island PROJECT MANAGER: WIN FILE: SCALE: BASIK 2DP WA 98110 PPROVED DATE K41 LSPPI 10% 1/4" = I' POWERGEAR `Jan 17 01 03:58p Watson Dispatch 2068423290 p.3 -7 PLEASE VERIFY ALL DIMENSIONS THIS MATERIAL MAY NOT BE REPRODUCED IN ANY FORM WITHOUT PRIOR PERMISSION FROM WallSan iufnlium PROJECT: KALISPELL POLICE DRAWN BY: DATE CHECKED BY: DATE OPTION WATSON CLIENT: COMMUNICATIONS CENTER W�/17101 PLAN A HOF DISPATCH LOCATION: KAI ISPELL. MT _ REV 12725 B Miller Road NE Bainbridge leland PROJECT MANAGER: WN FILE: SCALE: BASK 2DP WA 98110 DATE KAI ISPFI I AI I/L" = V POWERGEAR ROVED_ Kalispell Lin P`09 tom'"'" TA oou'D VIi'SO REPORT: FROM: SUBJECT: Honorable Mayor and City Council Frank Gamer, Chief of Police Dispatch Center Remodel MEETING DATE: August 20, 2001 Department BACKGROUND: This year the police department identified a need to upgrade the 911-dispatch facility. The council directed the department to entertain bids on that improvement. On August 6, 2001 the City of Kalispell received bids on the Dispatch Center Remodel. One bid was received from Davidson Construction of Whitefish Montana in the amount of $20,600.00. This amount is higher than the projected estimate on this portion of the project and was the only bid received. RECOMMENDATIONS: The council should reject the bid of $20,600.00 from Davidson Construction and direct the department to entertain quotes within the project estimates. FISCAL EFFECTS: None ALTERNATIVES: As suggested by the council. Respectfully ank Gamer C(�hris(rKuku�lski Chief of Police City Manager Frank Gamer, Chief of Police • Jim Brown, Asst. Chief of Police • KPD phone (406) 758-7780, FAX (406) 758-7799 300 1st Ave. East, Kalispell, MT59901