Loading...
4. Award Bid - Sidewalk & Curbing ConstructionCity of Kalispell Public Works Department Post Office Box 1997, Kalispell, Montana 59903-1997 - Telephone (406)758-7720, Fax (406)758-7831 REPORT TO: Mayor and City Council FROM: James C. Hansz, P.E., Director of Public Works SUBJECT: Bids for Annual Sidewalk and Curbing Construction MEETING DATE: May 6, 2002 BACKGROUND: The City obtains bids each year for the construction of sidewalk and curbing with the intent of facilitating the replacement of these items by residents and businesses. For the current year bids were received from Bucholtz & Soteros and Sandon Construction. Bids are submitted on a unit price basis for specific items of work. Attached is an analysis of the bids. The bid from Sandon is the low bid. Based on discussions at earlier work sessions, Staff recommends that this bid be used for new installations and replacements with a 50-50 cost share with residents. This would effectively double the amount of sidewalk installed or replaced each year. RECOMMENDATION: Staff recommends award of the bid for Annual Sidewalk and Curbing Construction to Sandon Construction of Kalispell. ACTION REQUESTED: AT CITY COUNCIL MEETING OF MAY 6 - MOTION APPROVING AWARD OF THE ANNUAL SIDEWALK & CURBING CONSTRUCTION BID TO SANDON CONSTRUCTION OF KALISPELL FISCAL EFFECTS: Expenditures of up to $22,500.00 matched by an equal amount from residents and/or businesses. ALTERNATIVES: As suggested by the City Council �sz, P!E. Chris A. Kukulski of Public Wor s / C y Engineer City Manager Report compiled May 1, 2002 Attachment: Bid Tally May 6, 2002, Annual Sidewalk Bid MEMORANDUM Date: May 1, 2002 To: James Hansz, Directcr ftf Public Works From: Fred Zavodny, er Re: Sidewalk and Curbing rction Bid Analysis and Recommendation Bids for Sidewalk and Curbing Construction for the Year Ending June 30, 2003 were opened on April 30, 2002. This contract is intended primarily for residents and businesses wishing to take advantage of the annual sidewalk and curbing construction program. Bids were received from Sandon Construction and Buchholtz & Soteros Construction. Sandons bid contained the required Bid Bond. Buchholtz & Soteros bid did not contain the required Bid Bond. The primary components of the bid are as follows: Bid Item Unit Buchholtz Sandon Current Price 4" Sidewalk SF $ 4.00 $ 3.95 $ 3.95 6" Sidewalk SF $ 5.00 $ 4.50 $ 4.25 Curb and Gutter LF $ 16.50 $ 13.00 $ 12.80 Straight Curb LF $ 15.30 $ 12.80 $ 12.80 I am recommending that the bid for Sidewalk and Curbing Construction for the Year Ending June 30, 2003 be awarded to Sandon Construction.