2. Award Bid - Streetscape 2002 - 2nd Ave West Redevelopment Project4P City of Kalispell
Post Office Box 1997 - Kalispell. Montana 59903-1997 - Telephone (406)758-7700 Fax(406)758-7758
TO: Mayor Pamela B. Kennedy and Kalispell City Council
FROM: Susan Moyer, Community Development Director
Chris A. Kukulski, City Manager
SUBJECT: Second Avenue West Redevelopment and Senior Housing Project
MEETING DATE: June 17.2002
BACKGROUND:
The City began seeking grant funding in FY 2000 to make this 40-unit senior housing project a
reality. Though unsuccessful in 2001, the City received a $500,000 Community Development
Block Grant and a $428,000 H.O.M.E. grant in the 2002 competition cycle. A key component in
the grant ranking was the City's willingness to undertake a "neighborhood revitalization" effort
in a three -block area that begins at Center Street and runs down to Third Street West. Second
Avenue West is part of the official "seniors walkway" established by Dr. Lauren Block before
his retirement. Second Avenue West currently lacks any amenities that exist on Main Street or
will be created on the First Avenues as a result of the Streetscape Project.
Staff estimated a cost of $96,000 to revitalize the three -block area in 2000. That amount was
pledged as "city contribution" TIF match on the grant applications, and it is listed in the FY 2002
TIF Budget. That cost estimate did not include all the upgrades to make the project conform to
the First Avenues Streetscape amenities (minus the bulb outs) because the First Avenues
Streetscape project had not yet been designed. However, in an effort to obtain the best price for
the project, as well as tie into the theme developed in the First Avenues Streetscape, both
Projects were put to bid at the same time.
The low bid for the Second Avenue West project came in at $265,741. The difference between
the original cost estimate of $96,000 and the low bid is $169,741. It is estimated that this
difference can be covered through any remaining TIF funding after the Streetscape 2002 is
awarded as well as the use of the Program Income contained Community Development
Revolving Loan and Redevelopment Fund FY 2002 Budget for redevelopment activities..
RECOMMENDATION:
Staff is recommending that City Council approve Schedule I in the bid packet for the Second
Avenue West Project and the total construction cost be covered from the above referenced
budgets. Please refer to the attached letter from Sitescape Associates regarding the extensive
experience of the low bidder and the fact the work will compliment the construction of the new
City parking lot on the old Keno Inn site as well as the First Avenues Streetscape 2002 Project.
FISCAL EFFECTS:
The Second Avenue West Senior Housing Project is projected to generate $47,000 annually in
taxes. Additionally, the funding from the two grants is loaned on a deferred basis to the
developer and will be paid back to the city with interest. The City will receive approximately
$1,725,000 in principal and interest from the developer over the life of the loans.
ALTERNATIVES:
As suggested by council.
Susan Moyer,
Community Development Dir ctor
Memo Prepared: June 12, 20
Ch s A. Kukulski,
City Manager
1
Sit-err,ape \�
vvwnesgay,.June 1L, CWUL EMdI: sitexape@cenhuylel.nef
Based on the attached results of the bid opening last Thursday for the 2"d
Avenue West Streetscape Project, we recommend that'the Kalispell City
Council award the Schedule One Contract Bid of $265,791.21 to:Sandon
Construction. As you know, Sandon Construction has extensive. experience
with the kind of site improvement work proposed for the block faces on 2'
Avenue West from Center Street to 3"i Street West.
The work will compliment the construction of the new City parking lot on the
corner,of 2"d Avenue West and 2"d Street West and the new Senior Housing
project. between 10 Street West and 2nd Street West. In addition, the `
project will bring the 2nd Avenue`streetscape into conformance with the
Streetscape 2002 Project.
Thank you for your. attention. Please call if you have anv Questions.
Mwnbw of the American socleb of Landscape'ArahRec ure
BID PROPOSAL
ITEM
Sandon
settle
LHc
Estimated
NO.
DESCRIPTION
QUANTITY
I UNITS
unit Price
I Total Price
unit Price
Total Price
unit Price
Total Price
unit Price
Total Price
SCHEDULE 1 - 2nd Avenue West Streetsca
- East and West
Side of Avenue
all Items
101
Mobilization Bondina and Submittals
_ 1
LS
$ 7800.00
$ 7800.00
$ 30000.00
$ 30000.00
$ 21210.25
$ 21210.25
$10000.00
$10000.00
102
Traffic Control
1
LS
$ 5000.00
$ so00.00
S 14000.00
$ 140W.00
$60600.00
$ 60600.00
$a 000.00
$8000.00
103
Construction Surveys
1
LS
$ 46W.00
$, 4600.00
$ 15000.00
$ 15000.00
$ 12W8.00
$ 12528.00
$2000,00
$2000.00
Remove and Replace Conc. Driveway,
106
6"
1,702
SO FT
$ 5,78
$ 9,837.56
$ 5.70
$ 9 701.40
$ 5.17
$ 8,799.34
$4.00
$6 808.00
Subexcavation and Stabilization
108
Gravel
100
CU YID
$ 8.00
$ 800,00
$ 11.25
$ 1,125.00
$ 16.17
S 1,617.00
S15.00
$1 500.00
Concrete Curb & Gutter - Standard,
109
includln apron/approaches
1.727
LN FT
$ 27.33
$ 47,198.91
$ 23.90
S 41275.30
$ 26.52
$
$18.00
$31 086.00
_ _45800.04
Remove and Replace existing
sidewalk wl Color Conc. - 4" thick,
111
willow green
9588
SO FT
$ 5,27
S 50,52876
$ 6.90
$ 66157.20
$ 5.66
$ 54268.08
$5.00
$47940.00
Remove and Replace existing corner
with Color Conc. - 4" thick, Brick, Red
113
Corner/Ramp
959
SO FT
$ 5.56
$ 5332.04
$ 6.90
$ 6817.10
$ 5.23
$ 5015.57
$5.50
$5274.50
4" Asphalt Concrete, removelreplace
for installation of electrical conduit and
116
seeming_
160
SQ YD
$___38.oD
$ 60811.00
$ 21.00
$ 3360.00
$ 21.34
$ 3414.40
$10.00
$1,11M.00
120
Adjust Catch Basin to Grade
1
EACH
S 85000
$ 850.00
$ 150.00
$ 150.00
$ 303.30
$ 303.30
$500.00
$500.00
Striping - White for Intersection
122
Crosswalks both ways
1
_ LS
$ 1,371.00
$ 1.371.00
15000.00
$ 13000.00
$ 2120.40
$ 2120.40
$3,000.00
$3000.00
_
Banner Arms for Street Light Poles -
Break -away wl 112" threaded ends -
124
Black
22
Pairs_
$_ 110.00
$ 2.420.00
$ 305.00
$ 6710.00
$ 250.80
$ 517.80
$100.00
$2200.00
125
6'Bench- Furnish and Install _
5
EACH
$ 1207.00
S__6035.00
$ 900.00
$ 4500.00
$ 501.77
$ 2508.85
$800.00
$4000.60
Ornamental Sign Posts wl 2 Brackets
_
and 1 TopFinial per Post - Furnish and
129
Install
10
EACH
$ 526,00
$ 5260.00
$ 750.00
$_._ 7500.00
$ 730.80
S 7308.00
$400.00
$4,000.00
A:/MPW00300.DOC
5/0a/00
BID PROPOSAL
ITEM
SarMon
Settle
LNc
Estlrnated
NO.
DESCRIPTION
QUANTITY
UNITS
Unit Prke
Total Price
I unitPrice
Total Price
Unit Price
Total Wive
unit Price
Total Price
Ornamental Sign Blades - Furnish and
130
Install
_ 4
EACH
s 270,00
$ 1,080,00
$ 350.00
$ _._ 1,400.00
$ 344.40
$ 1 377.E
$300.00
$1 200.00
Ornamental Sign Bracket for Traffic
Control Signs on Light Posts - Furnish
131
and Install _
12
EACH
$ 77,00
$ 924.00
$ 115.00
$ 1380.00
$ 123.60
$ 1483.20
$200.00
$2400.00
Decorative Street Lights - including
light assembly, concrete poles,
concrete bases and base conduit,
anchor bolts, base plates and 1W
threaded inserts for banner arms -
134
Furnish and Install
22
EACH
$ 3213.00
$ 70686.00
$ 3900.00
$ 656W.00
$ 3 440.00
$ 84480.00
$2,e0o.o0
$57200.00
Street Tree Planter Assemblies -
135
Furnish and Install
17
EACH
$ 522.00
$ 8,674,00
$ 500.00
$ e500.00
$ 980.55
$ 16669.35
$600.00
$10200.00
Street Tree Planter Grate and Tree
136
Guard Onl - Furnish and Install
17
EACH
$ 79400
S 13,447.00
$ 690.00
$ 11 730.00 1
$ 651,61
$ it,olrTV
$750.00
$12 750.00
137
Trash Receptacle -Furnish and Install
3
EACH
$ 7�.00
$ 2,280,00
$ 550.00
E 1,650.00
$ 527.15
$ 1 5e1.45
$500.00
$1 500,00
Drip Irrigation System Including
connection to parking lot meter and
139
automatic controller
1
LS
EJ_63400
$ 4634A0
$ 3500.00
$ 3500.00
$ 12000,00
$ 12 000.00
$12000.00
$12000.00
Supply Conduit, Cable and electrical
service connection for ornamental
140
lighting
1
LS
$ 10 750.00
E 10 750.00
ib .00
14 250.00
$ 19 500.00
$ 19 500.00
$5 000.00
$5 000.00
SUB -TOTAL SCHEDULE 1 (Numbers) $230,168.60
E 265,788.27 $ 349,306.00 $ 379,179.80
SUB -TOTAL SCHEDULE 1 (Words)
265 79127 Actual Bid
Dollars
A:/MPW00300.DOC
5/08100
BID PROPOSAL
ITEM
SaMon
SetOe
LXe
Eatlmated
NO.
DESCRIPTION
QUANTITY
UNITS
unit Price
Total Price
unit Price
Total Price
Unit Price
Total Prim
unit Price
Total Price
SCHEDULE 2 - Reduced Scope A 2nd Avenue West Streetsca - East and West Side exclude irri . & select site furnishin s
201
Mobilization Bondin and Submittals
1
LS
$ 7900.00
$ 7800.00
$ 26000.00
$ 60000.OD
$ 20768.65
$ 20766.65
$1000D.00
$100W.00
202
Traffic Control _
1
LS
$ 5000.00
$ 5000.00
$ 14000.00
$ 14000.00
$ 6o609.OD
$ 6o600.ao
$6000.00
$6000.00
203
ConstrUCtion Surve
_ 1
LS
$ 4600.00
$ 4600.00
$ 15000.00
$ 15000.00
$ 12528.00
$ 12 pM.00
$2,0D0.
$2,000.00
Remove and Replace Cone, Driveway,
206
61,
1702
SQ FT
$ 5.78
$ 9837.56
$ 5.70
$ 9__,701.40
$ 5.17
$ 8799.34
$4.00
E6608.00
Subexcavation and Stabilization
208
Gravel
100
CU YD
$ 8.00
$ aoom
$ 11.25
S 1125.00
$ 16.17
$ 1617.00
$15.00
$1150D.00
Concrete Curb & Gutter - Standard,
209 _
includin a ton/a roaches
_ 1 727
LN FT
$ 27.33
S 47,198.91
$ 23.90
$ 41275.30
$ 26.52
$ 45800.04
$16.OD
$31086.0.0
Remove and Replace existing
sidewalk w/ Color Cone. - 4" thick,
211
willow Oreen
9,588
_ SQ FT
$ 5.27
$ 50528.76
$ _6.90
$ 66157.20
$ 5.66
$ 54268.08
$5.00
$47940.00
Remove and Replace existing corner
_
with Color Cone. - V thick, Brick Red
213
Corner/Ram
959
SOFT
s _ 5.56
$ 5,332,04
$ 6.90
$ 6617.10
5.23
$ 5015.57
$&
$5274.50
4" Asphalt Concrete, remove/replace
_$_,
for installation of electrical conduit and
216
sleevin
160
SQ YD
S 38.00
$_ 6080.00
S 21.00
S 3360.00
21.34
$ 3414.40
$10.00
$1600.00
220
Adjust Catch Basin to Grade
1
EACH
s s5o.00
s 850.00
$ 150.00
$ 150.00
$ 303.30
$ 303.30
$500.00
$500.00
Striping - White for Intersection
222
Crosswalks both ways
1
LS
S 1371.00
$ 137100
$ 15000.00
$ 15000_OD
2120.40
$ 212OA0
$3000.00
$3000.00
225
6'Bench- Furnish and Install
5
EACH
$ 1207.00_
$ 6035.00
$ 900.00
$ 4500.00
,$_
$ 501.77
E.__2508.85
$800.00
$4000.00
Ornamental Sign Posts w/ 2 Brackets
and 1 TopFinial per Post - Furnish and
229
Install
10
EACH
$ 526,00
$ 5260,00
E._ 750.00
$ 7500.00
$ 130.80
$ 7308.00
$400.00
$4 OOD.00
Ornamental Sign Blades - Furnish and
230
Install _._
4
EACH
$ 270.00
$ 1,080,00
5 350,00
$ 1 000.00
$ 344.40
$ 1,377.60
$300.00
$1 200.00
A/MPW00300.DOC
sma/o0
BID PROPOSAL
ITEM
Bandon
settle
LHC
Estimated
NO.
DESCRIPTION
QUANTITY
UNITS
Unit Prim
Tow] Price
Unit Price
Total Price
unit Prim
Total Price
Unit Price
Total Price
Ornamental Sign Bracket for Traffic
Control Signs on Light Posts - Furnish
231
and Install
12
EACH
$ 77.00
5 924.00
$ 115.00
$ 1380.00
$ 123.60
$ 148320
$200.00
$2400.00
Decorative Street Lights - including
light assembly, concrete poles,
concrete bases and base conduit,
anchor bolts, base plates and %"
threaded inserts for banner arms -
234
Furnish and Install
,__ 22
EACH
$ 3,21300
$ 70888.00
$ 3900.00
$ 85800.00
$ 3840.00
$ 84480.00
$2600.00
$57200.00
Street Tree Planter Assemblies -
235
Furnish and Install
17
EACH
$ 965oo
$ 18405.00
$ 500.00
$ __ 8500.00
$ 980.55
$ 18669.35
$600.00
$10200.0D
Street Tree Planter Grate and Tree
236
Guard On - Furnish and Install
17
EACH
$ 652.00
$ 11 084.00
$ 690.00
$ 11 730.00
$ 051.61
11 077.37
$750.00
$12 750.00
Supply Conduit, Cable and electrical
_$_
service connection for ornamental
239
li htin
1
LS
a 10750.00
$ 10750.00
0
$ 14250.0
$ 14250.00
$ 18500.00
19500.00
$S OOD.OD
$5000.00
SUB -TOTAL SCHEDULE 1 (Numbers) $214,468.50
5 261.62727 - 333,446.00 $ 359.639.15
SUB -TOTAL SCHEDULE 1 (Words)
261 625.27 Actual Bid
Dolla
A:/MPW0030D,DCC
5/oaw 00300-5
BID PROPOSAL
ITEM
Sa"don
Settle
L11C
Estimated
NO.
DESCRIPTION
QUANTITY
UNITS
unit Price
Total Price
I
Unit Prim
Total Price
Untt Prke
Total Price
unit Price
Total Price
SCHEDULE 3 -Reduced Scope B - 2nd Avenue
West Streetsca
- exclude
all items
West Side
301
Mobilization Bondlnp and Submittals
1
LS
$ 400000
$ 4000.00
$ 1 0000.00
$ 18000.00
S 14210.65
$ 14210.85
$10,0W.00
$1000o.00
302
Traffic Control
_ 1
LS
$ 30DD.00
$ 3000.00
14,000.00
$ 14000.00
$ 80600.00
$ 60600.00
$8000.00
$8000.00
303
ConStrUCtl0n Surveys
___1
LS
a 2300.00
$ 2,30D.00
$ 15 Oo0.o0
$ 15000.00
$_125800
$$ 12528.00
$2,000.00
$2000.00
Remove and Replace Conc. Driveway,
306
6"__
1081
SOFT
$ s.78
$ 6248.18
$ 5.70
$ 8161.70
$ 5.17
$ 5588.77
$4.00
$4324.01)
Subexcavation and Stabilization
308
Gravel _
50
CU YD
S _8.00
$ 400.00
$ 11.25
$ 562.50
S 16.17
$ 806.50
$1500
$750.00
Concrete Curb & Gutter - Standard,
309
including aQrpn/approaches
776
LN FT
$ 27,33
$ 21,208.06
S 23.90
$ 18548.40
_$ 26.52
$ 2057S52
$18.00
$13968.00
Remove and Replace existing
sidewalk w/ Color Conc. - 4" thick,
311
willow green
3997
SOFT
$ 5,27
S 21061,19
$ 6.90
$ 27579.30
$ 5AS
$ 22823.02
$5.00
$15985,OD
Remove and Replace existing corner
with Color Conc. - 4" thick, Brick Red
313
Corner/Ramp
505
SO FT
$ _ 5.56
$ 2,807.80
$ 8.90_
$ 3484.50
$ 5.23
S 2 s41.15
$5,5p
$2 7_77.50
4" Asphalt Concrete, remove/replace
for installation of electrical conduit and
316
sleevin _.
- 75
SO YD
S 38.00
$ 2,850.DO
$ 21.00
$ 1575.00
$ 21.34
$ 1600.50
$10.00
$750.00
_320
Adult Catch Basin to Grade
1
EACH
$ 650.00
$ 650.00
$ 150.00
$ 150.00
$ 303.30
$ 303.30
$500.D0
$500.00
Striping - White for Intersection
322_
Crosswalks both ways
1
LS
$ 695.0o
s 686.00
$ 15.000.00
$ 15000.00
$ 2120.40
$ 2"120.40
$3000.00
$3000.00
Banner Arms for Street Light Poles -
Breakaway w/ 1Y2' threaded ends -
Black
11
Pairs
S 110.00
$ 1,210.00
$ 305.O0
$ ___3 �.00
$ 250.80
$ 275&80
$100.00
$1100.00
r�25324
6' Bench -Furnish and Install
3
_ EACH
s 1 207.00
$ 3.621.00
$ 900.00
$ 2 700.W
$ 501.77
$ 1,505.31
5800.00
$2 4c0.00
Ornamental Sign Posts wt 2 Brackets
and 1 TopFinial per Post - Furnish and
329_
Install
5
EACH
$ 526.00
$ 2630.00
$ _,_,750.00
$ 3750.00
$ 730.80
$ 3654.00
$400.00
$2000.00
A:/MPW00300.DOC
5/0&W
BID PROPOSAL
ITEM
Sannon
setae
LHC
Eatimaten
NO.
DESCRIPTION
QUANTITY
UNITS
Unit Price
Total Price
unit Price
Total Price
Unit Price
TOW Rice
Unit Prim
Total Prim
Ornamental Sign Blades - Furnish and
330
Install
4
EACH
$ 270.00
$ 1,060.00
$ 350.00
$ 1400.00
$ 344.40
$ 1377.e0
$300.00
$1200.00
Ornamental Sign Bracket for Traffic
_
Control Signs on Light Posts - Furnish
331
and Install
_ 6
EACH
s 77.00
$ 462.00
$ 115.00
$ 690.00
$ 123.60
$ 741.60F$200.00
$1 200.00
Decorative Street Lights - including
light assembly, concrete poles,
concrete bases and base conduit,
anchor bolts, base plates and Y2threaded
inserts for banner arms -
334
Fumish and Install
11
EACH
$ 3213.00
$35343A0
$ 3900.00
$ 429W.00
3840.00
$ 42 40.00
$26600.00
Street Tree Planter Assemblies -
335
Furnish and Install
9
EACH
$ 965.00
$ e6woo
$ 500:00
$ 4500.00
$ 960.55
$ 8824.95
$60D.00
$5400.00
Street Tree Planter Grate and Tree
., 336
Guard On - Furnish and Install
9
EACH
s 652.00
s 5,868.00
$ 690.00
$ 6210.00
651.61
$ 5864.49
$750.00
$6750.00
337
Trash Receptacle -Furnish and Install _
_ 2
EACH
$ 760.W
$-,-- 1,520.00
$ 550.00
s 1,100.00
$ 527.15,
$ 1,054.30
$500.00
$1,000.00
Drip Irrigation System Including
connection to parking lot meter and
339
automatic Controller
1
LS
$ 2317.00
$ 2317.W
$ 35W.00
$ 3500.00
$ 120W.00
$ 12000.00
$8000.00
Supply Conduit, Cable and electrical
_ __$6,000.00
service connection for ornamental
340
fi htin
1
LS
5375.00
$ 5375.00
$ e300.00
8300MO
$ 17400.W
s 17400.00
$3,000.W
$3000.00
SUB -TOTAL SCHEDULE 1 (Numbers) $128,704.50
$ 133,525.25 $ 198.464.40 $ 235,024.66
SUB -TOTAL SCHEDULE 1 (Words)
Mani
AJMPWOD300.DOC
5/08/00 00300-5