Loading...
5. Contract Amendment - Aquatic Facility Constructionr City Post Office Pox 1997 - Kalispell, Montana 59903-1997 -Telephone (406)758-7700 Fax (406)758-7758 REPORT TO: Mayor Pamela B Kennedy and City Council FROM: Mike Baker Parks and Recreation Director SUBJECT: Contract Adjustment - Aquatic Facility Construction MEETING DATE: May 19, 2003 BACKGROUND: Suspected ground water problems in connection with the aquatic facility have not materialized to extent expected and the footings for the bathhouse are almost complete with excavation taking place on the skate park, lazy river and parking area. A scheduled budget review indicated there is funding available for the concession stand and bathrooms that were previously withdrawn from the initial bid. Based on the enclosed construction administration project accounting spreadsheet, the City has approximately $98,500 in savings that could be applied to construct the bathrooms and concession stand. The savings are an accumulative amount resulting from the modified excavation, savings from owner provided products and the change in the water and sewer connections. The contractor has indicated that $98,500 could construct the concession stand and bathrooms in a "roughed in" condition. I anticipate the potential for further savings within the owner provided items as they have not been purchase to date. The construction completion is scheduled for October and the City would have the remaining fall and winter to complete the plumbing, electrical and carpentry inside the concession and bathrooms. RECOMMENDATION: Council increase the construction contract awarded to Swank Enterprises by $98,500 to complete the originally proposed concession stand and bathrooms. FISCAL EFFECTS: As stated. ALTERNATIVES: As suggested by Council. Respectively submitted, Mike aker Parks and Recreation Director Chris A. Kukulski City Manager I CITY OF KALISPELL LEISURE AQUATIC FACILITY KALISPELL • MONTANA ARCHITECTS DESIGN GROUP PC ADG: 01-131 5/6/2003 CONSTRUCTION ADMINISTRATION PROJECT ACCOUNTING BUDGET LINE ITEMS BOND CURRENT AMOUNT COST 1. BASE BID $2,693,000 2. OWNER PROVIDED PRODUCTS $416,993 3. CHANGE ORDERS $3,840 4. CONSTRUCTION CONTINGENCY $146,160 5. A/E BASIC SERVICE FEES $188,005 6. A/E DESIGNATED SERVICE FEES $124,160 7. A/E REIMBURSABLE EXPENSES $51,446 8. QUALITY CONTROL TESTING $11,100 9. MISCELLANEOUS $25,000 TOTAL $3,675,000 $3,659,704 DIFFERENCE = BOND -CURRENT COST $15,296 ITEM DATE BUDGET REVISIONS AGREEMENT SUB -TOTAL 1. BASE BID Swank Enterprises Base Bid 2/6/03 $3,106,580 $0 $2,693,000 $2,693,000 Construction Review of Project Cost 1 ITEM DATE BUDGET REVISIONS AGREEMENT SUB -TOTAL 2. OWNER PROVIDED PRODUCTS A. Water Tower and Slides 5/2/03 Bid $163,720 B. Water Attractions Zero Entry Pool 5/2/03 Bid $42,860 C. Diving Boards [2] $3,500 D. Handicapped Ramp $4,720 E. Landscaping $7,500 F. Irrigation $7,500 G. Tables and Trash Recepticles $4,890 H. Site Funiture $2,500 I. Canopies, [2] Unbrella $8,700 J. Lockers, Plastic Type $14,000 K. Concession Equipment $5,(10(1 L. Lazy River Attractions $21,625 M.Water and Sewer Connection Fees -Meters $29,736 N. Colored CMU Addition Funded by Parks $2,242 O. Concession Building -Revised Funded by Parks $98,500 3. CHANGE ORDERS A. Contractor Initiated No. 5 Dewatering and V.E. Gravel B. Architect Initiated No, 3 Electrical Power to Hand Dryers No. 4 Fire Extinguisher Cabinet No. 7 Upgrade Mirrors No. 8 V.E. Exterior Sign Credit No. 9 Exit Door from Pool Pump Room C. Owner Initiated No. I Colored CMU Added No. 2 Concession As Bid No. 6 Concessions Building -Revised 4. CONSTRUCTION CONTINGENCY A. Construction Contingency B. Equipment Contingency C. Sub -Total B. Contingency Reductions [Change Orders] C. Current Contingency Total Estimate Estimate Funded Under Item 2-N. Above Not Accepted Funded Under Item 2-0. Aboim $135,000 $15,0()0 $ I50,000 $0 $2,213 $467 $660 ($1,500) $2,000 $0 $0 $0 $416,993 $3,940 $3,940.00 $146,160.00 $146,160 Constructions Rw4cmz ofl'roject Cost 946,160 ITEM DATE 5. AIE BASIC SERVICE FEES A. A/E Basic Senrice Fees BUDGET REVISIONS AGREEMENT SUB -TOTAL Pool $183,035 Skate Park $2,970 B. Less Current Due -Paid 7131/02 $0 C. Sub -Total $188,005 $lups $188,005 6. A/E DESIGNATED SERVICE FEES A. A/E Designated Services Fees Pre -Funding $35,620 Pool $63,120 Skate Park- $25,420 B. Less Current Due -Paid 7/31/02 $0 C. Sub -Total $124,160 $124,160 $124,160 7. A/E REIMBURSABLE EXPENSES A. A/E Reimbursable Expenses Pool $46,646 Skate Park $4,800 B. Less Current Due -Paid 7/31/02 ($14,228) C. Sub -Total $37,218 $51,446 $51,446 Construction Review of Project Cost ITEM DATE BUDGET REVISIONS AGREEMENT SUB --TOTAL 8. QUALITY CONTROL TESTING A. Gcotechnical Survey $6,300 B. Special Quality Control Services $4,800 D. Less Current Due -Paid E. Sub -Total 9. MISCELLANEOUS C. Finance Bonds MOTES $25,000 $0 $11,100 $11,100 $11,100 $0 $25,00ti $25,000 Construction Review of Project Cost 4