Loading...
2. Award Bid - Sewer/Street Maintenance Building ConstructionCity of Kalispell Public Works Department u Post Office Box 1997, Kalispell, Montana 59903-1997 -Telephone (406)758-7720, Fax (406)758-7831 REPORT TO: Mayor and City Council FROM: James C. Hansz, P.E., Director of Public Works / City Engineer SUBJECT: Bids for Sewer/Street Maintenance Building MEETING DATE: May 19, 2003 BACKGROUND: The City has obtained bids for construction of a new vehicle and equipment storage building to replace a decrepit existing structure at the City maintenance yard. The new building will provide additional storage capacity over existing structures and combines needs of the Sewer Division and Street Maintenance Divisions into a more cost effective single structure. A total of four bids were received with the apparent low bid submitted by Synergy Builders, Inc. of Elliston, MT. Attached is an analysis of the bids. The bid was structured with two alternates to provide flexibility. Staff recommends award of the base bid and additive alternate #2 in order to provide maximum storage capacity while remaining within the budgeted funds available. RECOMMENDATION: Staff recommends award of the Sewer/Street Maintenance Building bid to Synergy Builders, Inc. of Elliston, MT based on their low bid of $136,468.00 for the base bid and additive alternate #2. ACTION REQUESTED: AT CITY COUNCIL MEETING OF JUNE 2 - MOTION TO AWARD OF THE SEWER/STREET MAINTENANCE BUILDING BID TO SYNERGY BUILDERS, INC. FISCAL EFFECTS: Expenditures of up to $136,468.00 of Street Maintenance, Sewer and Storm Drainage funds. ALTERNATIVES: As suggested by the City Council Respectfully submitted, Ja es . Hansz, P.E. Director of Public Works 4 Engineer Attachment: Bid Tally June 2, 2003, Sewer Street Building Biddoc Chris A. Kukulski City Manager Report compiled May 28, 2003 City of Kalispell Public Works Department Post Office Box 1997, Kalispell, Montana 599031-1997 - Telephone (406)758-7720, Fax (406)758-783 1 ia�ffll Memo to: Jim Hansz, P.E. Public Works Director, City Engineer Attached is the bid tabulation of bids received and opened on May 27, 2003 at 2:30 p.m. for the referenced project. Each bidder listed their contractor's license number and each bid contained a legal bid bond. The low bidder for the Sewer/Street Maintenance Building was Synergy Builders, Inc., P.O. Box 129, Elliston, Montana, who submitted a low base bid of $111,235. Staff recommends that Synergy Builders, Inc., be awarded the contract for the referenced project. There are adequate monies in the Special Street Maintenance Fund ($52,000), Sewer Operating Fund ($72,000), and Storm Sewer Fund ($18,000) to finance the referenced project, including Additive Alternate No. 2, within the recommended low bid received. The total amount budgeted for this project is $142,000.00. Synergy's Base Bid combined with Additive Alternate No. 2 totals $136,468.00. Frank Castles Civil Engineer BID TABULATION -AV CONTRACTOR: Davidson Construction, Inc. BID: $159,000.00 glml iti ii� ITEM NO. 3 ADDITIVE ALTERNATE NO. 2 EM;24,600.00 CONTRACTOR: Intermountain Industrial, Inc. ITEM NO 1. SEWER/STREET MAINTENANCE BUILDING: ITEM NO. 2. ADDITIVE ALTERNATE NO. 1 ITEM NO. 3 ADDITIVE ALTERNATE NO. 2 BID: $21,438.00 BID TABULATIOR *Mrflmn#MTA�� 1101001N)WAM 10110111MM-110• BID: $22,000.00 1114MILSIMM, 111111110:911" BID: $18,000-00 CONTRACTOR: 5yneW Builders, Inc. BID: $111,235-00 BID: $35,535.00 •