Loading...
3. Postpone Contract Award - El Dorita Lift StationCity of K."-al *1 spell Public Works Department Post Office Bo-, 1997, Kalispell, oRt a %9}{}3-1997 .'Teiep o e (406)7M-7720, Fax (6) 7 58®7831. REPORT TO: Mayor and City Council FROM: James C. Hansz, P.E., Director of Public Works SUBJECT: Delay of Bid Award — Sewage Lift Station #4, Liberty Street (El Dorita) MEETING DATE: January 20, 2004 BACKGROUND: The fiscal year 2003/2004 Sewer Operating budget includes an appropriation of $105,000.00 for replacement of sewage lift Station 94, Liberty Street (El Dorita). Mows into this lift station are approaching its capacity and there is no emergency power supply for the pumps. A design was developed and 3 bids were received on 6 January. Sandon Construction is the apparent low bidder for the project. LHC Construction is second low bid, $1,473 higher than Sandon. A bid tab is attached. The replacement of this sewage lift station is not a simple task. Lift station #4 is a heavily used facility and as such the ability to move raw sewage into the main sewer must be maintained throughout construction. In order to make a reasonable bid award recommendation, Staff has requested detailed statements of experience from both Sandon and LHC for reconstructing similar sewage pumping facilities. This information wi11 assist in determining the firm best able to perform the work without creating an adverse impact to the public because of a failure to maintain the flow of raw sewage. A bid award is expected to be made at the February 2, 2004 meeting based on the lowest cost that is consistent with maintaining the highest possible standards for protecting public health RECOMMENDATION: Delay bid award. ACTION REQUESTED: AT CITY COUNCIL MEETING OFJANUAPrY20, 2003 —MOTION TO DEL4YBID AWARD FOR REPLACEMENT OF LS #4. FISCAL EFFECTS: Expenditure of sewer operating replacement funds in an amount to be determined. ALTERNATIVES: As suggested by the City Council Respectfully Jl es ansz, P.E. Director of Public Works / 6dy Engineer Attachment: Bid Tabulation January 20, 2004, Delay Sid Award LS #4Aoc Chris A. Kukulski City Manager Report compiled January 12, 2004 W City of Kalispell Public Works Department Post Office Box 19977 Kalispell, .tvl:on=a 59 3-1997 - Telephone (06)755-7720, Fax (406)758- 7 3 MEMORANDUM 7 January 2004 To: Jaynes C. Hansz, P.E., Director of Public Works/City Engineer From: Frank Castles, P.E., Assistant City Engineer X Subject: El Dorita Lift Station Improvements Attached is the tabulation of bids received for the subject project. Staff recommends that the project not be awarded until adequate research is done to ensure that the contractor awarded the project is capable of successfully completing the work within the constraints of the contract documents. BID TABULATION EL DORITA LIFT STATION IMPROVEMENTS BIDS OPENED JANUARY 6, 2004 2:30 PM LHC, INCORPORATED SANDON CONSTRUCTION COMPANY SETTLE SERVICES BID ITEM QUANTITY UNIT UNIT BID PRICE EXTENSION UNIT BID PRICE EXTENSION UNIT BID PRICE EXTENSION FURNISH & INSTALL MANHOLE 1 EA. $2,300.00 $2,300,00 $2,029.00 $2,029.00 $2 100.00 $2,100.00 LIFT STATION DEMOLITION LUMPSUM L.S. $7,890.00 $7,890.00 $10,149.00 $10,149,00 $10,334.80 $10,334.80 DUPLEX SEWAGE LIFT STATION LUMPSUM L.S. $66,860,00 $66,860.00 $60,465.00 $60,465.00 $107,552.50 $107,552.50 EMERGENCY GENERATOR LUMPSUM L.S. $34,350.00 $34,350.00 $37,834.00 $37,834.00 $34,710,90 $34,710.90 EXPLORATORY EXCAVATION 5 HRS. $210.00 $ 1,050.00 $100,00 $500.00 1 $95.00 1 $475,00 TOTAL BID SI12,450.00 $110,977.00 $155,173.20