Loading...
4. Award Bid - Sewage Lift Station #4 - El DoritaCity of Kalispell Public corks Department e,a 011-i:c Box l ?9 . ahspjl. �bic� Lt��� ��k)0-"'-1`99 i - � sic: �l��i�e i.�i)r�;;;�e, 7?�;. 4 ax (40 )?�'j-' � 1 REPORT TO: Mayor and City Council FROM: ,Tarries C. Hansz, P.E., Director- of Public. Works SUBJECT: Rid Award Y- Sewage Lift Station 04, Liberty Street (El Dorita) MEETING DATE: February 2, 20il4 BACKGROUND: The fiscal year 2003/2004 Sewer Operating budget includes an appropriation of $1051000.00 for replaccnirmt of sewage lift Station. 44, Liberty Street (El Dorita). Flows into this lift station are approaching its capaQ4 and here is no crrrergency power supply for the pumps. A design was developed and. 3 bids were received on 6 Januany, Sandon Construction is tht: apparent low bidder for the projc>,ct, LHC Construction is second low bid, $1,473 higher than Sandon, A. bid tab is attached. The replacement of this sewage lift station is not a simple task, gift station 44 is a heavily used facility and as such the ability to more raw sewage into the main sewer must be maintained throughout construction. In order to make a reasonable bid award recommendation, Staff re'quested detailed statements of experience from both Sandon and IaHC for reconstructing similar sewage; puraping facilities. 'Me information provided shows that the low bidder, Sandon Construction, meets the City's minirnurn cxpericncc requirements for performing the work 3n an acceptable manner. RECOMMENDATION: Award bid to Sandon Construction, ACTION REQUESTED: AT CITY COUNCIL MEETING OF F, BRUARY2, 2011.E — MOTION TO AWARD BID FOR RisPIACCEtYIENT 0F1,.V #4 TO,5ZANDONCON,S'TRUC'T.ION. FJSCAL EF ECTS: Expenditure of sewer operating teplacernunt funds of $110,997.00. This amount exceeds the budget estimate by $5,997.00 but no budget arneadment is expected to be needed because of anticipated off -setting savings in other fund line items. ALTERNATIVES: As suggested by the City Council z.'P. � Chris A. Krrkulski of Public Works Xtij Engineer City Manager Report compiled January 23, 2004 A.ttachmcnt: Bid Febrtiaty 2, 2004. Bid Award IS #4.doc City of &alispell Public Works 'Department Post Office, Box 19 la Kalispell. Montana 59903-1997 - Telephone (406) f 1 3-7720Fax (406 )7 5 -M b ".Frr January 21, 2004 To: Jim Hansz, P.E. Public Forks Director/City Engineer From: Frank Castles, P.E., Assistant City Engineer 6a- (;.+0, Re: El Dorita Lift Station Improvements The Project Manager and I requested information from the two low bidders regarding their qualifications for constructing the referenced project. The requested information was received in a timely manner. Based on the information provided and telephone calls to prior clients/engineers we recommend that the El Dorita Lift Station Improvements project be awarded to Sandon Construction Company, Inc., for a low bid of $110.977.00. BID TABULATION EL DORITA LIFT STATION IMPROVEMENTS BIDS OPENED ANUARY 6, 2004 2:30 PM LHC, INCORPORATED SANDON CONSTRUCTION COMPANY SETTLE SERVICES BID ITEM QUANTITY UNIT UNIT BID PRICE EXTENSION UNIT BID PRICE EXTENSION UNfT BID PRICE EXTENSION FURNISH & INSTALL MANHOLE I EA. SZ,300.00 52,300,00 $2,029.00 $2 029.00 $2,100.00 $2,100.00 LIFT STATION DEMOLITION LUMPSUM I.S. $7,890,00 57,390.00 $TO.149,00 S10,149.00 510.3.34.80 $10,334.80 DUPLEX SEWAGE LIFT STATION IUN1P SUM L.S. $66,860.00 366,860,00 560,465.00 560,465.00 $107,552.50 S 107.55Z.50 EMERGENCY GENERATOR LUMPSUM L.S. $34,350.00 $34,350.00 $37,834.00 537,834.00 534,710.90 534,710.90 EXPLORATORY EXCAVATION 5 HRS. 3210.00 S 1,050,00 $100,00 $500,00 595,00 5475.00 TOTAL BID S'112,450,00 5110,977.00 51 55,173,20