06/24/99 Hagood/Rosauers Supermarket, Kalispell, MontanaJune 24, 1999 Mr. Glen Neier City Attorney City of Kalispell P. O. Box 1997 Kalispell, MT 59903-1997 RE: ROSAUERS SUPERMARKET, KALISPELL, MONTANA Dear Glen: The purpose of this letter is to provide you with an estimate of the cost to complete the sewer line extension and the private road in accordance with agreements between RSI, L.L.C. and the City of Kalispell, both referenced in my May24 letter to you. I am providing you with two copies of TDH's pre -construction contract numbers, should you wish to share a set with other City personnel. If you have any questions on those calculations, feel free to call Ian Bailey directly at TDH. Glen, given that this work will be done within approximately one more month and I am trying to set my budget for the entire project costs, I would appreciate knowing from the City of Kalispell that, subject to actual costs not changing, the sums calculated herein are acceptable to the City and that payment will be forthcoming when final costs are certified by TDH. Thanks for all of your assistance over the past year and a half to get this project to this point. Kalispell Investment Group, L.L.C., of which I am the managing member, is extremely pleased that we are nearing the point of starting the building construction and that we will have a new Rosauers Supermarket in place in the south end of Kalispell sometime in May, 2000. Sincerely, KIEMLE & HAGOOD COMPANY Development Agent for KALISPELL INVESTMENT GROUP, L.L.C. Q Coo, Ge d L. ood President cc: Ian J. Bailey Kit Querna Professional Real Estate Services Washington Mutual Financial Center, 601 West Main Avenue, Suite 400, Spokane, Washington 99201-0674 (509) 838-6541 FAX (509) 458-4014 Thomas, Dean & Hosidns, Inc. Engineering Consultants I June 10, 1999 Gerald L. Hagood, President Kiemle & Hagood Company Washington Mutual Finance Center 601 West Main Avenue, Suite 400 Spokane, WA 99201-0674 Re: Rosauers Site Improvements Kalispell, Montana Dear Jerry: We have reviewed the Development Agreement between RSI, L.L.C. and the City of Kalispell with regard to cost allocation for the pending sewer and street improvements. Following is our recommendation for an equitable cost sharing basis between RSI and the City for each of the improvements. Detailed calculations and construction bid prices are attached. Sewer Total cost of the sewer main installation including design, mobilization, construction and inspection is estimated to be $18,230.79. Costs related to the RSI sewer service installation have been deducted. Apportionment of sewer costs is by square footage between Lots 1, 2 and 3 of Daley Field Subdivision. This method of apportionment is taken from Section 3.2(e.) of the Developers Agreement and was presented there as a method of reimbursement to the City by the Developer. Sewer costs are as follows: LOT Lot 1, (19.04% of area) Lot 2, (33.59% of area) Lot 3, (47.37% of area) Sewer Cost Split: COST OWNER $3,471.14 City $6,123.72 RSI $8,635.93 City City of Kalispell - $12,107.07 RSI, L.L.C. - $ 6,123.72 690 North Meridian. Suite 101 • Kalispell, MT 59901 • (106) 752-5246 • F-1X (406) 752-5230 Gerald L. Hagood 6/10/99 Page 2 Street Total cost of the street installation including design, mobilization, construction and inspection is $58,513.71. Costs related to the sidewalk on the south side of the street have been deducted from this total. Apportionment of the street cost is by an even split between Lots 1 & 2, not including sidewalk. Street costs are as follows: LOT COST OWNER Lot 1 $29,256.86 City Lot 2 $29,256.86 City Total project cost sharing is summarized below. City of Kalispell RSI, L.L.C. Sewer - $12,107.07 $6,123.72 Street - $29,256.86 $29,256.86 Total - $41,363.93 $35,380.58 Other utilities including; water, storm drainage, electrical, natural gas and communications are the Developer's responsibility and costs will be borne by RSI, L.L.C. Please review and comment on the preceding apportionment structure. We can provide further documentation or revise the formula according to your preferences. Sincerely, THOMAS, DEAN & HOSKINS, INC. Ian ]. Bailey, P.E. IJB:jt K98-73-006 D: docs\rsi\jun 10hag.Itr Encl. CC: Ferman Pasold Richard Salsbury RSI/CITY APPORTIONMENT CALCULATIONS Sewer Costs: Engineering/Design/Approvals Construction from City MH to Lot 3 P.L. Construction from Lot 3 to Limit of Gravel Surface % of Mobilization of Projected Inspection Sewer Construction: RSI Lot 3/Sta.17+84 to 20+00 <Less Services> City Mt to Lot 3 Sta. 9+82 to Sta. 17+84 Sub Total Sewer Const. $ Lump Sum Contract Amount $ Bid Amount $ Bid Amount $ Sewer Cost X (Mobilization) Total Contract $ Cost Sewer X (Insp. Contract Amount) Total Const. Cost $ 3,876.30 <1,136.30> $ 2,740.00 $ 12,038.00 $ 14,778.00 Mobilization Portion: Total Sewer Cost X (Mob. Cost) = 14,778 (7,995) _ $572.57 Total Const. 206,350 Sewer Design Cost: $2,250.00 Sewer Inspection Cost: (Sewer Cost)(Insp. Cost) = 14,478 (8,800) _ $360.22 (Total Proj.) 206,350 Total Sewer Costs = $18,230.79 RSI Apportionment Calc's 6/10/99 Page 2 Street Costs: Street Bid Street Design = $60,030.05 =$1,400.00 <Less Sidewalk Bid> - $7,215.00 Sub Total $54,215.05 + Mobilization (St. — Sdwk) (Mob.) = 52,815.05 X (7,995) _ $2,046.31 Total Bid - 206,350 + Inspection (St. — Sdwk) (Insp.) = 52,815.05 (8,800) _ $2,252.35 Total Bid 206,350 Total Street = $58,513.71 Apportionment Sewer — By Square Footage of lots 1, 2 & 3 Total Subdivision = 15.651 ac. Lot 1 portion - 2.98 (100%) = 19.04% 15.651 Lot 2 portion - 5.257 (100%) = 33.59% 15.651 Lot 3 portion — 7.414 (100%) = 47.37% 15.651 Total = 100% D : docs\rsi\a p por. cal cs BID PROPOSAL FOR WATER, SEWER, STREET, STORM DRAINAGE and SITE GRADING IMPROVEMENTS RSI, LLC KALISPELL, MONTANA Date May 3, 1999 RSI, LLC P.O. BOX 9000 SPOKANE, WA. 99209 Gentlemen: The undersigned, having become familiar with the local conditions affecting the cost of work and the Contract Documents, including Advertisement for Bids, General Conditions of the Contract, Form of Proposal, Form of Contract, Form of Bonds, etc., Drawings, Specifications, and Addenda and Exhibits issued and attached to the Contract Documents on file in the office of the City Clerk, City of Kalispell, Montana, hereby proposes to furnish all of the labor, materials, necessary tools, expendable equipment, and all utility and transportation services necessary to complete in a workmanlike manner all of the work required to complete the items described in the Bidding Schedule in connection with Construction of Water and Storm Drainage Improvements for the City of Kalispell, Montana, in accordance with the drawings and specifications, including Addenda Nos. 1 , , and , issued thereto for the sum set forth in the following bidding schedule: SCHEDULE OF QUANTITIES Detailed descriptions of various bid items may be found under Section 01010 of the Construction Specifications contained herein. ITEM NO. DESCRIPTION EST. UNIT QUANTITY UNIT PRICE AMOUNT SCHEDULE I: MOBILIZATION, WATER, SEWER & STORM DRAIN IMPROVEMENTS 1. Mobilization LUMP SUM $7 , 995.00 $7 , 995.00 2. Type H Pipe Bedding Material, in Place 50 CY 18.15 907,50 3. Imported Back ill for Pipe Trenches under Paved Areas, in Place 850 CZ, 7.75 6�587.50 WATER 4. Water Mains, in Place 8" PVC DR 18 800 LF 11.46 9 ,,1688 ., 90 6" PVC DR 18 40 LF 14.30 572.00 -1- ITEM NO. DESCRIPTION EST. QUANTITY UNIT UNIT PRICE AMOUNT 5. 8" Gate Valve & Valve Box, in Place 2 EA $ 611.60 $1,223.20 6. Tapping Saddle and Valve, in Place 12"x 6" 2 EA 1,408.00 2,816.00 12"x8" 1 EA 1,635.00 1,635.00 7. Fire Hydrants with Auxiliary Gate. Valves and Box, in Place 4 EA 1,672.00 6,688.00. 8. Pressure and Leakage Test, Completed &Accepted - LUMP SUM 373.00 373.00 9. Cleaning, Disinfection and Bacteriological Testing of Water Mains - LUMP SUM 908.00 90,8.00r 10. Cast Iron Fittings, in Place 300 LBS 6.56 1,268,00 11. 3" Water Service, In -Place 1 EA 788.00 788.00 SANITARY SEWER, STA. 17+84 TO STA. 20+00 12. Sanitary Sewer Main, in Place 8" PVC SDR 35 220 LF 8_70 1,914.00 13. Sanitary Sewer Manhole, in Place 1 EA 743.00 743.00 14. Sanitary Sewer Service, in Place, 6" PVC, SDR 35 110 LF 10.33 1,136.30 15. Testing Complete and Accepted LUMP SUM 83:00 83.00 STORM DRAINAGE 16. Storm Drain Pipe, In Place 12" PVC, SDR 35 470 LF 10.68 5,019.60 10" PVC, SDR 35 320 LF 8.70 2,784.00 8" PVC, SDR 35 165 LF 8.16 1,346.40 17. Storm Drain Manhole, in Place 2 EA 727.00 1,454.00 18. Extra Depth of Manhole, in Place 3 VF 28.25 84.75 19. 30" Catch Basin, in Place with: Curb & Gutter Type Inlet, Frame & Concrete Apron 2 738.00 1,476.00 Round Slotted Cover, Frame & Concrete Apron 3 EA 495.00 1,485.00 -2- ITEM EST. UNIT UNIT NO. DESCRIPTION QUANTITY PRICE AMOUNT 20. Temporary Retention Pond, in Place LUMP SUM $2,168.00 $2,168.00 21. Drainage Swale, in Place 440 LF 1.48 651.20 TOTAL BID, SCHEDULE I — MOBILIZATION, WATER, SEWER & STORM DRAINAGE IMPROVEMENTS $ 61,974.45 Sixty One Thousand Nine Hundred Seventy Four Dollars and 45/100 DOLLARS SCHEDULE II: PARKING LOT & SITE GRADING IMPROVEMENTS 22. Subbase Course Material, In Place (2" minus crushed gravel) Truck Route Section (12"thick) 3700 SY $ 5.07 $18,759.00 Parking Lot Section (6" thick) 12,200 SY 2 12 25,864.00 23. Base Course Material, in Place (3/4" minus crushed gravel) 300 SY 24. Asphalt Pavement, in Place (4" thick, placed in two lifts) 300 7.06 2,118.00 25. Separation/Stabilization Fabric, in Place. 15,900 SY 26. Bituminous Tack Coat, in Place. 20 GAL 27. Concrete Curb and Gutter, in Place 100 LF 9.60 960.00 TOTAL BID, SCHEDULE II — PARKING LOT, & SITE GRADING IMPROVEMENTS Sixty Nine Thousand Eighty Four Dollars and 20/100 SCHEDULE III: STREET IMPROVEMENTS 28. Subbase Course Material, In Place (2" minus crushed gravel) Street Section (12" thick) 29. Base Course Material, in Place (3/4" minus crushed gravel) 2300 SY 2200 SY -3- 1.69 507.00 1.31 20,829.00 2.36 47.20 $ 5.45 $69,084.20 ForeTHEMR1 fii, gv5_nn 1.36 2,992.0.0 ITEM EST. UNIT UNIT NO. DESCRIPTION QUANTITY PRICE AMOUNT 30. Asphalt Pavement, in Place (4" thick, placed in two lifts) 32. Separation/Stabilization Fabric, in Place. 33. Bituminous Tacit Coat, in Place. 34. Concrete Curb and Gutter, in Place 35. Concrete Valley Gutter, in Place 36. Concrete Sidewalk, in Place TEMPORARY APPROACH TO HWY. 93 37. Asphalt Pavement, in Place (4" thick, placed in two lifts) 38. Subbase Course Material, In Place (2" minus crushed gravel) Street Section (12" thick) 39. Base Course Material, in Place (3/4" minus crushed gravel) 40. 18" Culvert, in Place 41. Separation/Stabilization Fabric, in Place. 42. Imported Backfill, in Place (Road Foundation Material) Wy 2300 230 850 500 1850 kwall 360 320 60 360 185 SY $ 7.06 $15,532.00 SY 1.30. 2,990.00 GAL 2.36 542.80 LF 9.60 8,160.00 SF 5.67 2,835.00 SF 3.90 7,215.00 TOTAL BID, SCHEDULE III - STREET IMPROVEMENTS SY 7.06 2,259.20 SY 4.31 1,551.60 SY 1.36 435.20 LF 15.90 954.00 SY 1.60 576.00 CY 7.85 1,452.25 Sixty Thousand Thirty Dollars and 05/100 SCHEDULE IV: SANITARY SEWER STA. 9+82 TO STA. 17+84 43. Sanitary Sewer Main, in Place 8" PVC SDR 35 12" PVC SDR 35 44. Sanitary Sewer Manhole, in Place $60,030.05 710 LF $ 10.25 $7,277.50 100 LF 11.69 1,169.00 4 EA 141.50 2;966.00 M! 45. Extra Depth of Manhole, in Place 46. Sanitary Sewer Service, in Place, 6" PVC, SDR 35 47. Testing Complete and Accepted 48. Connection to Existing Sewer 5 VF $ 41.10 $ 205.50 110 LF LUMP SUM 1 EA id.33 1,136.30 612.50 612.50 549.00 TOTAL BID, SCHEDULE IV — SANITARY SEWER STA. 9+82 TO 17+84 Thirteen Thousand Nine Hundred Fifteen Dollars.+and 80%100 549.00 13,915.80 TOTAL BID, SCHEDULES I, II, III & IV $ 205,004.50 Two Hundred Five Thousand and Four Dollars and 501100 DOLLARS The above unit prices shall include all labor, materials, equipment, shoring, removal, overhead, profit, insurance, etc., to cover the finished work of the several kinds called for. The Bidder shall refer to Section 01010, Measurement and Payment, for specific details regarding the required workmanship, labor and materials included in each of the above bid proposal items. Bidder understands that the Owner reserves the right to reject any or all bids. Award of the contract shall be based on the lowest base bid. There will be one contract awarded for this project for Schedules I & H. The bidder agrees that this bid shall be good and may not be withdrawn for a period of sixty (60) calendar days after the schedules dosing time for receiving bids. It is an express condition of this Contract that the performance of the Owner hereunder is contingent upon funds being available by the Owner in sufficient amounts to pay for the improvements covered hereby and that if such funds are not so available, the Owner shall be under no obligation to perform under this Contract. And, the undersigned further certifies that he is not presently working beyond the contract time, including authorized time extensions on any previously awarded public contract project. Upon receipt of written notice of the acceptance of this bid, bidder will execute the formal contract attached within ten (10) days and deliver a Surety Bond or Bonds as required by Paragraph 29 of the General Conditions. The bid security attached in the amount of ten (10%) percent of the bid is to become the property of the Owner in the event the contract and bond are not executed within the time above set forth, as liquidated damages for the delay and additional -5- expense to the Chimer caused thereby. Resp i Submitted: Date May 3 , 1999 By Doug Crockett Excavating & Trucking, Inc. 5228 N. Foothills Drive Polson, Montana 59860 (SEAL - if Bid is by a Corporation) Contractor #11151 Contractor's Montana Registration No./Employer I.D. No. *17f ;l f Ltlf f i` ADDrME SCHEDULE A'-- UNRIMORDUND Ui2 ITY MNNDUIT 4" PVC Schedule 40, w/ ptdl pope and sweep bmi& 230 L= $ 5.85 $1,345.50 TOTAL BID, ADDITIVE SCHEDULE A — UNDERGROUND U`MjTY COMM $ 1,;345.50 One Thousand Three Hundred Forty Five Dollars and 50/100 DCU ARS-