10/24/96 Site Review SummarySITE DEVELOPMENT REVIEW COMMITTEE SUMMARY Thursday, October 24, 1996 10:00 a.m. - PECDD Conference Room ATTENDING: Clarence Krepps, City Manager Bob Babb, Public Works Director Mike Baker, Parks Director Ad Clark, Police Chief Diana Harrison, Zoning Administrator vCraig Kerzman, Building Official Ross Plambeck, Chairman John Levien, Plans Reviewer Ted Waggener, Fire Chief John Wilson, Assistant City Engineer Narda Wilson, FRDO Debbie Woodham, PECDD Secretary The committee reviewed, discussed, and recommended the following: 1. First Avenue West - 139 First Avenue West. The owner of the First Avenue West Restaurant would like to put an addition on the side of the building where the outdoor courtyard is currently located. A similar proposal previously submitted by the owner is on file in the Bldg Dept. For next week's meeting: • John Levien will check the Bldg Dept files for the terms of the. easement for the City property adjacent to the outdoor courtyard seating area. • Diana will check the files for the parking requirements for the inside seating area as well as the outdoor courtyard seating area. • Bob will visit the site to see if the unpatched parking area on the alley side of the building has been repaired. • The Fire Marshall will look at the building. The proposed addition would cut off one entrance to the basement which may require the area to be sprinkled. 2. Super Stop - 1319 Hwy 93 S. Following review of preliminary site plans for an additional canopy at the Super Stop at 1319 Hwy 93S, Diana sent a letter to the developer requesting additional information and an accurate site plan. Once this information is received, it will again be reviewed by the SDRC. - 3. Loren's Auto Repair - 1309 Hwy 2 West. The Bldg Dept is ready to issue a building permit for Loren's Auto Repair at 1309 Hwy 2 West which has previously been reviewed at SDRC meetings. SDRC members were asked if there were any items that needed to be completed before issuing the building permit. It appears all issues have been resolved and the building permit can be issued. 4. Christian Center - 225 Summit Ridge Drive. The Christian Center has submitted very preliminary plans for a two-story addition off the NW corner of their building. This area is zoned R3. A detailed site plan is needed which shows property lines and all easements. Parking and access will need to be reviewed. The plans will need to go to the Planning Board for approval of a CUP. The Christian Center representatives will need to meet with Narda at FRDO before starting the CUP process. Site Development Review Committee October 24, 1996 5. Town Pump - 445 West Idaho Street. Diana has received a letter from the State regarding a beer and wine license request for the Town Pump located at 445 W. Idaho Street. The State wanted to know if the City has any outstanding issues regarding the Town Pump. SDRC members said everything looks okay on our part. 6. Hampton Inn - Hwy 2 West. Issues previously discussed by SDRC members and sent to Mr. Pack continue to be resolved. Mr. Lee Kaufman, Mr. Pack's legal representative, called doss and set up an appointment for November 13th at 1:30 p.m. to discuss any unresolved issues. An as -built Certificate of Survey should arrive within the next couple of days. Ted met with Mr. Pack regarding fire access issues. Mr. Pack stated that the City should only consider the plans submitted for the Hampton Inn and not the proposed plans submitted for the Hampton Inn with a Village Inn Restaurant. If the restaurant is not a part of the plans, fire access to the Hampton Inn looks adequate. Mr. Pack is aware of what the sprinkling requirements are. The Hampton Inn developers are meeting with the MT DOT today regarding the approach permits and the requirement for the access road to Appleway. 7. Haven Field - Hwy 93S. The offering document for Haven Field has been completed and is available for distribution. In order to have information available to developers asking questions about the property, Larry asked several questions regarding the property. • What are the plans for 3rd Ave East and 18th Street East? Bob stated that at this time there are no plans to rebuild 3rd Ave East or 18th Street East. • Storm Drainage on the site. The MT DOT knows that there is a drainage problem at the corner of Hwy 93S and 18th Street East. Currently it is functioning o.k. but when Haven Field is developed the plans for drainage will need to tie in with the Hwy 93S reconstruction drainage system. Since a date for reconstruction of Hwy 93S is uncertain at this time, a temporary drainage plan can be arranged. • The traffic signal at Hwy 93S and 3rd Ave East. Currently there is $ 100,000 budgeted for a traffic signal. However, the MT DOT does not give a specific time for installing the traffic signal. Traffic numbers will have to be met before it will be installed. If the City wants to put the traffic signal in before the State decides the time is right for it, the City will have to pay for it. 8. Administrative Issue - Revised Plats/Review & Approval Process. A question was raised regarding boundary line adjustments and revised plats and how the City is kept aware of any that are filed. Narda stated that Eric or another representative from FRDO attends a 509 Process Meeting every Friday in the Plat Room. At that time all revised. plats are reviewed. All City items are pulled for review. 2