REPORT TO: Mayor and City Council
FROM: James C. Hansz, P.E., Director of Public Works
SUBJECT: Award Bid — Replace Programmable Logic Controller at WWTP
MEETING DATE: November 20, 2006
BACKGROUND: The current Wastewater Treatment Plant budget includes an appropriation of $200,000.00 for
replacement of the programmable logic control system at the WWTP. The Project included two schedules to allow
greater bid flexibility: Schedule A includes furnishing the PLC enclosure, racks and associated hardware;
furnishing and installing the software as described in the specifications; and also includes all programming
necessary for a complete project. Schedule B includes installing the PLC enclosure and furnishing and installing all
electrical components listed above and on the drawings. Contractors were not required to bid on both schedules.
One bid was received for Schedule A. and one bid for Schedule B. Both bids Were in order with no
exceptions taken by the bidders.
Schedule A: Northwest Automation, Inc. $1061910.00
Schedule B: Kalispell Electric, Inc. $67,200.00
The total of the bids for all work on this project is $174,110.00. This is $25,890.00 less than budgeted. Staff
recommends award of Schedule A to Northwest Automation. Staff recommends award of Schedule B to Kalispell
Electric.
ACTION REQUESTED: AT CITY COUNCIL MEETING OF NOVEMBER 20, MOTION TO AWARD
SCHEDULE A OF THE PLC REPLACEMENT PROJECT TO NORTHWEST AUTOMATION AND
SCHEDULE B OF THE PLC REPLACEMENT PROJECT TO KALISPELL ELECTRIC.
FISCAL EFFECTS: Expenditure of budgeted funds totaling $174,110.00.
ALTERNATIVES: As suggested by the City Council
Respectfully subd, �
Jan—'�Tansz, P.E.
Director of Public Works /City ngi er
Attachment: Bid Recommendation
4 ti
C
y �
James H. Patrick
City Manager
November 20, 2006 Award Bid WWTP PLC Replacement Project.doc
MEMORANDUM
DATE: November 13, 2006
TO: Jim Hansz, Public works Director
FROM: Joni Emrick, Water Resource Manager
RE: Wastewater Treatment Plant Control System PLC Replacement Bid Results
Two parties bid the PLC Replacement project. The bid sheet was divided into two
Schedules, A & B, designed so a single party could bid either one or both schedules of
work. Northwest Automation Inc. bid Schedule A for $106,910.00; Kalispell Electric,
Inc. bid Schedule B for $671,200.00. The total for both Schedule A & B is $174,11 0.0 ;
$200,000.00 was included in the FY07 WWTP Replacement Fund for this project.
Both parties meet the verifiable experience and work restriction requirements. I therefore
recommend that we accept both bids. Theresa asked if you would word a single motion
to include accepting both Schedules A & B.
Please let me know if you need any further information.