5. Approve Task Orders for Upper Zone Water Supply and Storage Project.,k % "a T'Lff F,,.11 _rlubl Works Dp-martment Post Office Box. 1997, Kalispell, Montana - p n -7 , REPORT TO: Mayor and. City Connell FROM: James C. Hansz, P#E., Director of Public Works SUBJECT: Approve Task orders - Upper Zone Water Supply and Storage Project MEETING DATE.: February 21., 2006 BACKGROUND: In 2005 the City entered into a contract with Robert Peccia Associates for project engineering services to develop public water supply fac.111ties .for production and storage in the City's upper pressure zone. Implementation of this contract is via a series of task orders for specific work. Each task order is to be separately negotiated for cost and scope of work based on the result of preceding task orders. Task Order #I initiated the site selection effort. A site has been identified and the City is in negotiations with the landowner to secure the site. A location for a new production well was identified and approval of the drilling contract for this new well is a separate agenda item. Task. orders 2, , # , and #6 are to continue the engineering required to finalize procurement of the site, prepare easements,, conduct geotee ..Leal investigations and complete the engineering tasks .necessary to produce contract documents for completion of the well. The total of these Task orders i $1. 1,22o.00. Copies of the Task orders are attached for your information. Additional Task orders for the remaining work to finalize the storage tank design and the connecting pipelines will be negotiated for scope and cost at a later date when the site acquisition process is complete. RECOMMENDATION: Approve Task order 2, , # , and . ACTION REQUESTED: A T CITY COUNCIL MEETING FEBRUAR Y 219, A MOTION TO A PPR 0 VE TA SK ORDER ## 1 #31 #4, A ND # 6 TO R OBERT PECCIA & A SSO CIA TES TO CONTINUE THE ENGINEERING OF PUBLIC WA TER SUPPL Y IMPRO VEMENTS IN THE UPPER PRESSURE ZONE# Fcb ru arry 21, 2006 Upper Zo n e W ater Storage Task order , ,', , . doc FISCAL EFFECT'S: expenditure of funds totaling $159,220.00 from the water fund. ALTERNATIVES: As suggested by the City Council Respectfully sub fitted s C. Hansa., P.E. am s . rick Director o Public c or City Engineer City Manager Attachment: Task Order.2� , #6 Feb ruary 21- 2 006 Upper Zone W ater Storage Task Oder 2,3, , .do TASK ORDER NUMBER Two AGREEMENT TO FURNISH ENGINEERING SERVICES to THE CITY of KALIS LL MON ANA for SITE SURVEYING AND GEOTECHNICAL INVESTIGATIONS FOR THE TANK SITE .AND TRANSMISSION PIPING ALIGNMENT for UPPER PRESSURE ZONE WATER SYSTEM IMPROVEMENTS This Task Order provides for professional engineering services to be performed by ROBERT ECCI & ASSOCIATES, INC, (.hereinafter the Engineer), `or the City o fKalls el I (hereinafter the Owner), in accordance with Article I of the Agreement to Famish Engineefing Services to The City o f Kali s ell for water System Improvements, dated A ri 15, 2 (hereinafter the Agreement). This Task Order represents an authorization to proceed with the scope of services, schedule, and compensation described herein. This Task order, when executed by both parties, shall become a supplement to and part of the basic Agreement. ARTICLE 1. SCOPE OF SERVICES The Engineer agrees to furnish the following professional engineenng services In connection with the site surveying., base mapping, and geoteehnical investigations for the new water storage tank site and transmission on piping aliment., hereinafter referred to as the Project. Changes in the indicated scope of services shall be subject to renegotiation and implementation through a subsequent Task Order. A. SITE SURVEYING, BASE MAPPING AND GEOTECINICAL IW S IGA IONS FOR THE TANK SITE AND TRANSMISSION PIPING ALIGNMENT Courthouse Research: Researcb all available inforrnation at the Flathead County Courthouse relevant to subject properties, including existing deeds, eerti e .t s-o s Bey, and any as - built information. . Review Existing Survey Control: Review existing survey control in area of tank site and transmission maim aliment. Integrate any existing relevant control into new eo troI for this Project. 3. Control Survey with GIBS: I tilize GIBS (Global Po sitioning System) equipment to comp fete a ground control survey for the subject properties. . Topographic Surveys: Complete topographic surveys of 2-acre tank site and transmission main route. All survey data will be downloaded and computed to ensure accuracy and eon. onnan.ee with design of new facilities. . 1 . Create Project Base Mapping: Using field surveys, record drawings, and utility locates, develop base maps for Project site. Base maps will be used in design plans. 6. Geotechnical Investigations and Report: It is anticipated that the Engineer will employ a qualified geotechnic al consultant fordriIling and testing soils, and evaluating and develop . design parameters for soilconditions', structures, and pipelines for the Project. The Engineer will coordinate s services, and provide background 'n orrr�atior�, Project liaison, and review findings of the geotechnical consultant. The goto oh ical report will be included i the contract documents for the Project. Compensation of the geoteehni al consultant for professional services will be the responsibility of the Engineer. NO ARTICLE 2. SCHEDULE It is anticipated that those services listed above under Article 1, Scope of Services, are to be completedduring the time period from. February 1, 2006 to May 15, 2006. ARTICLE 3. COMPENSATION A. BUDGE' The budget for those services described above under Article 1, Scope of Services shall be a lump sum. of $321.,1 3 . based on the attached Estimate of Engineen'ngCosts. DATED this day of CITY OF KALISPELL y: Title: (Seal) , 20W ROBEROBERT PECCIA & ASSOCIATES, INC. By Pr s' t r ES WATE OF ENG3 VEERING COST 6 ROBERT PECCIA & ASSOCiATES CITY OF KALISPELL UPPER PRESSURE ZONE WATER PRODUCTION & STORAGE EACIUTIES TASK ORDER #2 TANK SITE SURVEYING AND GEOTECH 10-Jars-ob . ..... 5. i. >.. .. s , is .. < .. ,. . i r .. ,.I �, ,d 5 x t. {.,: :.` ..,.�:r: ]:•A.a 3.r, .). ':s�.i [ F� rr y:;: } :, � . � , .. F„ ..,. .. .5< .[ ... xn2 ..,[ ,... .. rL << .. " 5 i„ s�, .. s .. ..: ,r'1.... :•.l <, �r< t: L.< "fit.. �Y�:�, <T.r' .F cF:'<.•:....,.. <C:�.:..[•a. ! .... ,� !i. ].x i .5� s.. 3 n ,T Y r E { E. r , t. F .. 4 •..]t �y " r <,.. ,.,,......i. .. .. f.} .... ., t ..> �: ,3 .. ,. .[� .f., 3� .� 6..., .. ,.. .t, 3 >F ��:> r .�. [. ';'���� •Y f 'r7 �: �:�-< ,7, ,t,. .. # ... R .. ... .., aar... x1 < .R z r ,. 3 r [ r� .. r a. [•• z ., .�r }., ....E' ..F, ., h,:.��:.......s,>3`:'.. F f ... x f .,, i f Lx 1.. , ,,... 3" < �,. t •,. .A><>L.r a r r3 F <az ..>�_:.. r. .L %f c.•,. .i, •'.. Wit'.•: r. xs <... fz. r. #. S> ... E .. d � 2 rt 7. ] , . s > > t r<,.. £1�. .. ? r .. t< ... 5[. . ,S> ..._ .... , . 3.e F •[��. i.. ':S. ,.<i.,.3 ,i ..x�:..v :..:.. ,'3.•.:� `i=�^,`�:%:� i• •. •s., r .. ,. ,., x .,., - 4 s t .� , "„ n�a... s ... cs .. . 5, 3r .. , . k n . , ..., � . . ]. , < , r. .:. •: f .. � F�'%�. s z.t:: , •F: 3 .. ..r.r, ,. .. €.. .. ... ,a a. �� � >.� .n a ..>...,�> .,, .... .. ,.. 'k .. +� .?..: ,,� ., ..t:r �� �...,t �I? g� .��,,yy�� �'`�i '. ].€��' ��'� ..��4(Q€'y4F.�}� { ^;�,�:��'��•�`�..... :'5�6���3J,i.�.i�..... ..., ., .... .� r > E .. .. ,S � 5, .. ... .. n. .., a , F .t � f r ` ., ., ,'f, <: ..•`2 '.,.. . t... r... , .... .. ., r. 5,r f� ..] ., r. ... ,, ... ,.. F, ...,� ... .., i k ,. 7. .4w F.. .F< ]#•s ,. a.. ". .... .. ., s .. ..5l.. a. r ,.. r .. ...., .r.. . ] r ,.: a } .t.a• .r�".. ..i. ,.:1� s�>.> :ty x%':r':, ;'y�,, is S. >... a. ..t <Z ... .r > .a... 3#<. a, ., .. ...L.F s..i. ... <. 5 ,,, r<. ... i <,,. i:F" }°� �y 1 •.1: g��.yp �r eg [:,��:��;, ....,:.,.. , ] ,s ,,. ,x.. ", s � >•" a., <:]s-•'.. r, s.,..3 .,.•„ 'S�.e�?�r3, �� 1+'ix ,x�:> IF+%:kii;f.'�.€`.•, �::<. r, .... ., ".<r:,.,,:.. .. ...::,: s.", ...<,;i..:r,.. :"., t>>•r:I,':sFF«4l:.�:?3., 3�S'i'•"!:,.::: ,,.:.,,SR, €:F i:'4 t' .,�.' , ... s..,. .,<.,<,..,.._<, .. tx.r. 3's!#.��.n1<. ,. t ,. ,3.. <a r.. 4<.,. r.,. .. ., .,.,, E......,...., xs. ,..... ,... "A - � i. �... ..5x., ':� >:=:#:.?+:%:':. kl�i%<i?.%i�,¢:i'..`•�s�.'� r:€''"%i:<�t:,:'-.:•:. lank Site Surveying and Geotech Subcvnsultant Coor0ination 2 2 4 Courthouse Posearchi0eedsICOS's1As-huilts 8 8 Review Existinq Survey Control 2 4 6 Central Survey with GPS 8 8 Topographic Survey of 2 Acre Site 4 4 8 Topographic Survey of Transmission Main Route 16 16 32 f3ovsnloaiJ and Cor pule Survey Data 6 6 Create Survey Ease Maps 4 6 10 Total IlQurs 6 0 2 0 22 52 0 0 6 82 Total Cost $0.00 $O.00 $58,46 $0.00 $470.58 $1,476.24 $0.00 $0.00 $139.62 $2,143.90 Total Labor Costs Labor $ 2,143.1gQ Overhead (Multiplier 1,6942) " 3,632.20 Total $ 5,77610 Indirect Costs Mileage S 40,00 Computers $ 144-00 Surrey Equipment $ 676,00 Per Diem $ PhonelFax[Misc Expendables $ 35-00 Reproductlon $ 20-OG Geatecbnmai & Report $ 21,25tl,oci Total $ 22,164,00 Prof€t $ 4,189_90 Total Cost $ 32,130.00 TASK ORDER NUMBER THREE AGREEMENT TO FURNISH ENGINEERING SERVICES t THE CITY of KASPE L MON AN for SITE SURVEYING FOR THE WES V EW SUBDIVISION WELL SITE for UPPER PRESSURE ZONE WATER SYSTEM IMPROVEMENTS This Task Order provides for professional engineering services to be performed by ROBERT PECCI.A & ASS OCIATES, INC. (hereinafter the Engineer), for the City o f Kali sp eI (hereinafter the Owner), in accordance with article I of the Agreement to Fumish Engineering Services to The City o fKa isp ell for Water System Improvements, dated Ap l 5, 2 e ei nafter the Agreement). ` 'hi Task order represents are authorization to proceed with the scope of services, schedule, and compensation described herein.. This Task order, when executed by both parties, shall become a supplement to and part ofthe basic Agreement. ARTICLE .. SCOPE OF SERVICES The Engineer agrees to fumlsh the following professional engi eenng services in connection with the site surveying and base mapping for the new well site in the Westview Subdivision, hereinafter referred to as the Pro ect, Changes in the indicated scope of�servIces shall e subject to renegotiation and implementation through a subsequent Task Order. A. SITE SURVEYING AND BASE MAPPING FOR THE WESTVIEW SUBDIVISION WELL SITE Topographic Survey: Completc topographic surveys of well site in Westvi w Subdivision. All survey data will be downloaded and computed to c .s re accuracy and conformance with design of new facilities. 2. Create Project Base Mapp'ng: Ids*ng field surveys, record draw' t'fity locates, develop base maps for Project site. Base maps will he used in design plans. 1 ARTICLE 2. SCHEDULE It is anticipated that those services listed above under Article 1, Scope of Services,, are to be completed c og the time peodfrom January 15, 2006 to February 15, 2006. ARTICLE 3. COMPENSATION A. BUDGE The budget for those services descn'bed above under Article 1, Scope of Services shall be a lump sum of S1,290.00 based on the attache. Estimate of Engincefing Costs. DATED this day o � 2006. CITY OF KALISPELL Title: (Seal) ROBERT PECCIA & ASSOCIATES, INC. B -csict F ESTIMATE OF ENGINEERING COSTS ROBERT PECCIA & ASSOCIATES 07Y OF XAUSPELL UPPER PRESSURE ZONE WATER PRODUCTION & STORAGE FACILITIES -TASK ORDER #3 WELL SITE SURVEYING 14-Jan-06 TASK ORDER NUMBER FOUR AGREEMENT TO FURNISH ENGINEERING SERVICES to THE CITY Y of KLISPE L , MONTANA for TANS. SITE LAND ,AND EASEMENT ACQUISITION for UPPER PRESSURE ZONE WATER SYSTEM IMPROVEMENTS This Task Order provides for professional e gi een g services to be performed by ROBERT I CC .A & ASSOCIATES, INC. (hereinafter the Engineer), for the City of Kalispell (hereinafter the Owner), . n accordance with Article I oft e Agreement to Punish Engineefing Services to The City ofKali spelI for Water System Improvements, dated April 5, 2005 hereinafter the Agreement). This Task Order represents an authorization to proceed with the scope of services, schedule, and compensation described herein. This Task Order, when executed by both parties, shall become a. supplement to and part of the basic .Agreement. ICE 1, SCOPE of SERVICES The Engineer agrees to f mi h the following professional engineering services in connection with providing assistance to the Owner with. land acquisition for the tark site currently owned by the Stephen Becker Living Frost, and easement acquisition for the transmission piping alignment along the existing BPA power line easement, hereinafter referred to as the Project. Changes in the indicated scope of services shall he subject to renegotiation and implementation through a subsequent Task Order. A. ASSISTANCE WITH TANK SITE LAND ACQUISITION AND TRANSMISSION PIPING EASEMENT Landowner Correspondence: Prepare and respond to correspondence from the owner of the proposed tank site, Mr. Stephen Becker as necessary. Any necessary legal doc.rentation (including preparation of Buy -Sell) and filings, including all associated costs, will be the ner"s responsibility �. Appraiser Correspondence.- ce. Contact several appraisers to generate a ffsh.ort-list" of apprai secs o are capable of performing the work in a timely fashion. Submit the shorn -list to the Owner for selection of appraiser. Prepare a letter to selected appraiser providing legal descrlptio . of land to be appraised for the new tank site and transmission line alignment. Respond to any questions the selected appraiser may have. 3. Negotiations and Meetings with City: Provide legal description. of the Becker property to Owner to include in. Owner -prepared Buy -Sell agreement for tank site. Assist City with negotiation meetings with landowner, if necessary. 1 . Certificate of Survey for Tank Site: Complete a Ce i cats of Survey for new tank site to meet Flathead County requirements. 5. Correspondence with Bonneville Power Administration (BPA): Correspond with and provide ocumentation to BPA to meet their requirements for installing the new water transmission. piping vitro the existing BA easement from the new tank site to Springcreek Roach. . BPS. Easement application and Meetings: Prepare and submit BPA Easement ent Application. Schedule and attend meetings with BPA personnel as necessary to facilitate easement acquisition. Application fees and legal reviews and filings will be the Owner's responsibility. . Easement for Transmission Piping: Complete survey and assist owner with preparation o easement with landowners vner and BPA for transmission piping alignment. Set property Pins for Tank Site: Property pins for the 2-acre tank site will be surveyed and set in the field at all property corners prior to beginning construction. 2 ARTICLE 2. SCHEDULE It is anticipated that those services listed above under Article , Scope of Services, are to be completed during the time period from January 1, 2006 to July 1, 2006, ARTICLE 3. COMPENSATION A. BUDGET The budget for those services descr' ed above under A-rele 1, Scope of Services shad be a lump sum of $ 1 o,130. 0 based on the attached Estimate of Engineering Costs. DATED this day o , 2006. CITY OF KAISPEL y: Title: (Seal) ROBERT PECCIA & ASSOCIATES, INC. y. .__. / President F '\WA.TE k al_Tank_WeILCoil act\Ta�k#4.w-pd 3 f: S T iTM T E OF ENGINEERNG COSTS ROBERT PEGCIA & ASSMATES CITY OF KALISPELL UPPER PRESSURE ZONE WATER PRODUCTION & STORAGE FACILITIES TASK ORDER #4 TA4NX SITE LAND AND EAS MI NT ACQUISITION 10-Jan-06 TASK ORDER NUMBER SIX AGREEMENT TO FURNISH ENGINEERING SERVICES to THE CITY of K ., S ELL , M N ANA. for DESIGN OF NEW PRODUCTION WELL, WELL BUILDING, CONNECTING PIPING, AND RELATED E APPURTENANCES for UPPED. PRESSURE ZONE WATER SYSTEM IMPROVEMENTS This Task order provides for professional engineer'ng services to be performed by ROBERT ECC1A & ASSOCIATES, INC. (hereinafter the Engineer),, for the City ofKali spell (hereinafter the Owner), in accordance with Article I of the Agreement to Furnish Engineering Services to The City of Kalispell for water System .Improvements, dated __ hereinafter the Agreement). This Task order represents an authorization to proceed with the scope of services, schedule, and compensation descr'bed herein. This Task order, when executed by both parties, shall become a supplement to and part of the basic Agreement. ARTICLE 1. SCOPE of SERVICES The Engineer agrees to furnish the following professional engin.eern.g services in connection with the planning and design of a new municipal production well, well building, connecting piping, and related appurtenances, hereinafter referred to as the Project. Changes in the indicated scope of services shall be subject to renegotiation and implementation through a subsequent Task order. A. WELL DESIGN AND DRILLING OVERSIGHT (APPLIED WATER CONSULTING) Prepare Well Design Plans and Bid Documents: Review and revise the bid specifications and support documents for the old School Station Well that were prepared by Morrison-Maierle to include specifications for the new Vest ver 'Well that will be dlled in the West View Estates Subdivision. 2, Well Design Reporting: Meeting with DQ representatives to review the combined bid package for the "Vest. View Well and the old School Station Well. . Bid Letting and Contract Administration for Well Drlling: Includes attending a pre -bid conference torespond to questions posed by prospective contractors, issuing addenda to the bid specifications if needed, attending the bid opening, and reviewing bid submittals for completeness. Aquifer Test Specifications: Includes specifying the pumping rate,, duration of stela- drawdown test, identification of observation wells,, and general details of the pumping test. The information will be provided in a brief technical memorandum. 1 5. Prepare Water RightApplication: A water right application will be prepared to extend the water nghts for the new West vier Well into the City's distribution system. . The application will address legal and physical water availability, adverse effects, ects, and update the place of use. . Pro eet Completion Report: All information collected relative to well drilling, completion, testing, and water quality sanlin will e assimilated and compiled into a project completion report that will serve as a single reference document. 7. Grandview Well Assessment Report Preparation: Evaluate the water quality test results, video inspections, and well completion data relative to the Grandview No.2 well and the test well that was collected in Phase I of tis project. This in ormat-lon will be summarized in a technical report that will eon.tain recommendations for future alternatives relative to these two wells. B. SWDAR PREPAR-ATION AND AQUIFER TESTING (PBS&J) 1. Prepare Source Water Delineation Assessment Report (SWDAR): Preparation of SWD.AR in accordance with DEQ Circular PWS-6 for the new West View Well. Goal of this task is to identify source water to the new well and to identify potential sources of contamination and hazards to the new proposed water supply well. This report must be reviewed and approved by DEQ prior to DEQ approval of the well site. 2. Aquifer Testing and Analysis: Includes a -hour step test and a 2-hour constant rate pumping test for the West view Well conducted as specified by Applied Water Consulting. 'ask deliverable will be a technical memorandum summarizing the pumping test methods and results, data analysis and evaluation, and reeornmenda ions regarding appropriate pumping rates for the well. 3, Pumping Simulation Modeling: Prepare a technical memorandum summarizing results o rel.l pumping simulations. . .Review of Grandview Well Assessment Report: Independent review of Grandview well assessment report by Applied Water Consulting. Prepare a technical memorandum summanzing any suggested changes to the report. C; DESIGN of WELL COMPLETION, WELL BUILDING, CONNECTING PIPING AN RELATED APPURTENANCES Ors -site Meeting with. Developer and Engineer: Hold a pre -design meeting with the Developer and Engineer for the Westview Subdivision. This conference will be -used t identify the recommended locations for the new well and well building architectural requirements, and locations of existing infrastructure in the vicinity. I �. Record Drawing Review: Review available Owner records and drawings to determine tentative water facilities locations and configuration. Supplement review with field reconnaissance. Develop existing utility information for use in design decisions and incorporation into plans. Preliminary Well Site Design: Develop a site design for the improvements acceptable to the Owner, and conforming to the technical requirements of the Project. Includes development of preliminary design criteria and schematic design of the new well building. Well project completion report (see above) will be used as the basis for preliminary design of te well site Facilities. . Final Hydraulic Calculations and Modeling: Perform final hydraulic calculations For the pumps and piping system to promote conformance of the new improvements with the requirements of the existing water system. 5. Materials Comparison and Selection: Research alternative equipment and materials From the standpoints oFtechnical Feasibility, availability, and cost. Develop recommendations to the Owner for recommended pumps, controls, piping, valves, and appurtenance H ester "als For the Project. . Design Criteria and Review: Prepare documented design criteria for the Project, s mman in.g parameters For design and construction. Disffibute and review design criteria to the Owner and MDEQ for review. Provide supplemental conceptual illustrations of the Pro ft ect, such as an architectural rendering, deemed necessary by the Engineer. . Preliminary Design of Connecting Wiping: Select water main installation locations and tie-m points. .assess connection and fit -up requirements For pipeline connections and appurtenances, and locate new hydrants, services, valves, and Fittings. Prepare preliminary design layouts For new water mains. S. Pumping Equipment and Well Building Design: Review pump station and existing system interface requirements. Research equipment options and review preferences with the owner. Select prospective equipment. Design new equipment, including sizing, fit -up , location, and accessory systems required. . Telemetry Equipment and Electrical Design: Review existing water system controls and new control needs, in -eluding field inspection of equipment with the owner. Review equipment upgrade options and preferences Frith the owner, including integrating telemetry etry controls with the owner's water treatment and pumping plants. DetennIne telemetry and control equipment requirements, and select prospective equipment and suppliers. Design D.eW telemetry and controls For well and well building, including communications protocol, input/output capability, location and accessory systems required. Design supporting electrical heat, light, and power systems for new well building. It is recognized that the services of subcontracted professional electrical engineering subconsu ta.nt maybe used for power system design.. 3 o. :preliminary Design Documents 0%): Conduct en i ee inn calculations and design layouts to prepare 50% complete Design n oc me .ts. This stage ofdocuments will inc lude drawing sheets showing key system features, arrancrement, and sizing. Preliminary specifications will also be prepared, with separate technical sections for each system, material, and trade of construction work involved. . Cost Estimates Based on 0% Resign: Prepare a detailed Project cost estimate for the design as presented in the 50% Design Documents. The cost estimate will be circulated to the owner for review. 12. In -House QA/QC Reviews: Preliminary (50%) Design Documents vvi11 he submitted to internal QA/QC review by the Division Manager and the Operations Manager in charge of QA/QC for the Engineer. 3. Produce and Distribute Review Documents: Preliminary 50%Design Documents will be reproduced and delivered to the Owner and appropriate agencies for review. It is anticipated that 10 sets of documents will be provided for this purpose. 14. 0 Plan ReviewMeeting: Conduct a workshop with the Owner to review the 0% Preliminary Design Documents. Discuss, respond to, and/or incorporate any changes to the design documents requested by the over. . Prepare Construction Drawings 95 %: Prepare Construction Drawings showing final design configuration for the Project, including intended detail for construction. purposes. Drawings will be prepared to a 95 complete stage, showing all views, dimensions', and detail proposed for biddable documents. . Prepare Project Specifications (95%): Prepare bid documents and specifications for the work under the Project to a 5% complete status. Specifications will include material and installation requirements for mate ais and systems to be incorporated into the Project construction. 17. Update Construction. Cost .estimate : Update the Project construction cost estimate based on 5% Construction Drawings and Specifications. . Produce and ist to Review Documents: r ents: Construction Drawings, Specifications, and bid documents at a 95% completion stage will he reproduced and delivered to the owner and appropriate agencies for review. It is anticipated that 20 sets of documents will he provided for this purpose. 19. 5 % Plan Review Meeting: Conduct a workshop with the owner to review the 5 % Const fiction Drawings, Specifications,, and bid documents. Discuss respond to, and/or incorporate any changes to the design documents requested by the owner. 20. In -House QA/QC Reviews: (95%) Design Documents will be submitted to internal QA/QC review by the Division Manager and the Operations Manager in charge of QA/QC for the 0 Engineer. 21. Submit and Review Plans with MDEQ and Funding Agencies: Submit 95% Design Documents to MDEQ and any finding agencies requiring same for their review and approval if so directed by the Owner. 22. Respond to MDEQ and Agency Review Comments: Respond to %rmaI review comments by MDEQ and funding agencies. Hold discussions with the agencies to determine were changes to the Design Documents may be required. 23. Prepare 'Final" Construction Drawings o° : Revise 95% Construction Drawings to final I00 , incorporating any changes requested by the Owner, agencies, or resulting from internal QA/QC review. . prepare "Final" Project Specifications .off : Revise 95% bid documents and specifications for the work to 1 0% complete status, incorporating any changes requested by the Owner, agencies, or resulting fromintemal QAJQC review. 25. "Final" Construction Cost Estimate i o n : Update the Project construction cost estimate based on final 0% Construction Drawings and Specifications. 26. Production of Final Contract Documents: Construction Drawings, Specifications, and bid documents at final 0%) completion will be reproduced and delivered to the Owner, appropriate agencies, and prospective bidders for bid solicitation purposes. It is anticipated that 40 seta of documents will be provided for this purpose. 5 ARTICLE 2. SCHEDULE It is anticipated that those services listed above under Article 1, Scope of Services, are to be completed dun'dun'ng the time period from January 1, 2006 to June 1, 2006. ARTICLE 3. COMPENSATION A. BUDGET The budget for those services described above under Article 1, Scope of Services shall be a lump sum. of $115,,670.00 based on the attached Estimate of Engineering Costs. DATED this __ day of 52006. CITY OF KALISPELL By: Title: (Seal) ROBERT PECCIA& ASSOCIATES, INC. BY A;vz President F:\W TE I a ,Tan wWel ; o t ct\Taski� . TASK ORDER sae WELL SITE •• DES tGN AND WELL DRiLLINQ 90-Jan-06 EXHIBIT A TO TASK ORDER #6 ESTIMATE OF ENGINEERING COSTS WELL DESIGN AND TESTING COSTS - APPLIED WATER CONSULTING (AWC) and PBS&J CITY OF KALISPELL UPPER PRESSURE ZONE WATER PRODUCTION & S70RAGE FACILITIES 11-Jan-06 AWC & PBS&J phase 11 Tasks NEW WELL DRILLING AND COMPLETION Task 1 - Prepare Well Design Plans and Bid Documents AWC 22 6 4 32 Task 2 - DEQ Approval Subiasks 2A - Well Design Report AWC 8 3 3 14 213 - PWS-6 Source Water Assessment Report PBSJ 20 4 4 S 36 Task 3 - Bid Letting and Contract Administration AWC 8 3 11 Task 4 - Well Drilling and Construction Oversight AWC 54 54 Task 5 - Aquifer Testing & Water Quality Sampiling 5A - Test Specification AWC 4 4 5B - Testing and Analysis PBSJ 60 60 5C - Pumping Simulation Modeling PBSJ 20 3 4 20 Task 6 - Water Right Preparation - New Well Permit Appl. AWC 24 4 3 31 Task 7 - Project Completion Report: AWC 12 4 3 19 Task 8 - Grandview Well Assesment Report 8A - Regaft Preparation AWC 60 60 88 - Report Review PBSJ 4 4 Total Hours 192 24 84 27 25 352 Total Cast $6,541.44 $801.60 $2,805,60 $448,20 $603,00 $11,199.84 Total Labor Costs Labor $ 11,199.84 Overhead (Multiplier 1.6942) $ 18,974.77 Total $ 30,174,61 Indirect Costs AWC PBSJ JAquifer Testing Equipment Rental $ 1,800,00 Mileage $ 60.00 $ 50.00 Water Quality Laboratory Analyses $ 1,500,00 Reproduction $ 100.00 $ 100,00 Water right application tee $ 400.00 Total $ 550.00 $ 3,45t ,00 Profit $ 5,126.19 Total Cost $ 39,300.80