Loading...
2. Award Bid - 2007 Pavement Overlay Project:. \.. Ci*ty of Kali* spell Public Works Department .... ... . ... I ::. ^ s Post Of��C� Box � 997 Kalispell, M nt�. 9 a„ Montana 5. 903-997 Telephone 406)75$47720, Fax 406 758-753 1. r -p vim•. •fir. .,,.:. REPORT To: Mayor and City Council FROM: James C. Hansz, P.E., Director of Public Warps SUBJECT: Bid Award Recommendation -- 2007 Pavement overlay Project MEETING DATE: July 2, 2007 BACKGROUND: The current budget includes Gas Tax funds totaling $150,000.00 for pavement maintenance of City streets. This year the program anticipates a number of asphalt overlays to extend pavement life, renew the driving surface, and improve ride quality. A project was prepared based on an analysis of pavement condition data maintained in the City's pavement management system. From this analysis portions of four streets, Grandview Drive, West Wyoming, Two Mile Drive, and Third Avenue East were identified for work. These are shown on the attached tabulation and location maps. The 2007 Pavement Overlay Project bids were opened June 21 st. Two bids were received by the due date: LHC, Inc. $11 M 74.26 Schellinger Construction $1419049.90 Both bids were in order with no irregularities. The engineer's estimate for the work was $145,615.00. The low bidder is LHC, Inc. of Kalispell. RECOMMENDATION: Staff recommends award of the 2007 Pavement overlay Project to LHC, Inc. In view of the favorable bid result, staff also recommends authorization of additional work up to the maximum amount possible that does not exceed the budgeted funding of $150,000.00. Any additional work would be contingent on development of a satisfactory change order for the extra work. ACTION REQUESTED: A T CITY COUNCIL MEETING DE JUL Y 2, A MOTION TO A WARD THE BID FOR 200 7 PA VEIVIENT G VERLA Y PROJECT TO LHC, INC. OF KALI►S'PELL, MGNTANA. FISCAL EFFECTS: Expenditure of funds totaling up to $150,000.00 from the Gas Tax fund. ALTERNATIVES: As suggested by the City Council RectQ11y su JaweC. Hansz, P.E. Director of Public Works 1 City gin Attachment: Bid Recommendation July 2, 2007 Bid Award 2007 Pavement Overlay. doc ames .Patrick City Manager MEMORANDUM June 251, 2007 To: James Hansz, PE, Dire jfPubli,,c works From: Fred Zavodny, rRe: 2007 Overlay Project — id yss and Recommendation Bids were received from LHC Incorporated and Schellinger Construction Co. Inc. Both bids were in order and contained the required Bid Band. The bid analysis is as follows: CONTRACTOR TOTAL BID PRICE LHC $110,374.26 SCHELLINGER $141,049.90 The public works Department estimated the east of the project at $145,615.00. The current budget contains $150,000.00 for Overlay Operations. I recommend the bid for the 2007 Overlay Project be awarded to LHC Incorporated in the amount of $11 0,Y3 74.26. ATTACHMENT 2 2007 STREET OVERLAY PROJECT STREET OVERLAY QUANTITY SCHEDULE Description From To Length Width Thickness I Gallons I Sq. Yd. I Tons 3rd Avenue East 18th Street East Hwy 93 South 884 32 2.5" 3143 442 3rd Avenue East Milling Curb & Gutter 500 6 333 3rd Avenue East Miling Straight Curb 27 6 18 3rd Avenue East Milling Linear Roadway 757 6 505 3rd Avenue East Milling of Keyway @ 18th 34 46 181 3rd Avenue East Milling of Keyway @ South End 14 34 53 3rd Avenue East Tack Oil application @ 0.15 GL per sq. yd. 884 32 471 3143 Grandview Drive Hwy 93 North Curve 1592 24 3" 4245 716 Grandview Drive Milling Keyways 40 24 106 Grandview Drive Milling Curb & Gutter 208 6 139 Grandview Drive Milling Linear Roadway 347 6 231 Grandview Drive Tack Oil application @ 0.15 GL per sq. yd. 1592 24 636 4245 Grandview Drive Milling of Keyways east & west ends 20' x 24' x 2" daylighting out. Two Mile Drive Meridian Road Financial Drive 860 24 2.5" 2293 323 Two Mile Drive _ Milling Keyways 40 24 106 Two Mile Drive Milling Linear Roadway 222 6 148 Two Mile Drive Tack Oil application @ 0.15 GL per sq. yd. 860 24 344 2293 Two Mile Drive Milling of Keyways east & west ends 20' x 24' x 2" & daylighting out. West Wyoming Hwy 93 North 4th Avenue WN 790 30 2.5" 2633 370 West Wyoming Milling Curb & Gutter 1418 6 945 West Wyoming Milling Upright Curb 109 6 73 West Wyoming Milling Linear Roadway 92 6 61 West Wyoming Milling of Keyway at Hwy 93 20 70 156 West Wyoming Milling of Keyway @ 4th Avenue WN 20 36 80 West Wyoming Tack Oil application @ 0.15 GL per sq. yd. 7901 30 395 2633 z ui L 9 Ix ATTACHMENT 1 Page 1 F-0-UR MI VW"Y RO --T ; I R Tj , Us" .9"r HI Yj— DR ro > UJ V- 61— LA VA Lu IL Ffc Al DR �j IWO Uif 19 ATTACHMENT I Page 2 z RON