Loading...
4. Postpone Bid Award - Buffalo Hill Water Line Replacement-*Ak�ell J111lublic WC-Itprks Del,-ftartme"t City of "alis-, P k r ry > 3 w} y � � � Post o 1 , Kalispell. i ll. Montana Telephone � ��� �- � RFo T TO: Mayor and City Council FROM: Janes C. Hansz, 8. ., Director of Public works SUBJECT: Postpone Bich Award — Buffalo Hill water Line Replacement MEEETING DATE* April 21, 200 BACKGROUND: This project will install a new pipeline inside an existing abandoned waterline that connects the ity's two in -ground storage tanks. This is a very complexjob that requires highly skilled personal experienced in this type ofwork. A total of five companies bid this work. Four bids were closely grouped around the engineer's estimate for the work. A fifth hid was substantially outside and far below the estimate. In view of this and the extreme importance of the water supply facilities involved, staff requires additional time to fully review the qualifications, experience, past performance, and overall competence of the apparent low bidder and its critical sub -contractors to ascertain their ability to successfully perform the required work. A listing of bidders is attached. Staff recommends postponing a. bid award recommendation to 5 May 2008. ACTION REQUESTED: AT CITY COUNCIL MEETING OF Al RIL 21, MOTION To POSTPONE AWARD OF THE BID FOR REPLACEMENT OF THE BUFFALO HILLS WATER LINE To 5 MAY2008 COUNCIL MEETING. ING. FISCAL EFFECT'S: This project is budgeted at $155,000.00 in the FY 20 Water Fond budget. A BNATMES: As suggested by the City Connell Resp �11�f4f�4�f } 11�.411YJLJ{y � .�.i4 hector of Public Works ity n nor Attachment: Staff Memo April 1, 2 0 08 Postpone Award Buffalo H i I I Water Dine Replacement,doc ames H. a ck City Manager s'C ity 0 s-%ell 'l-lblic W-­%rks Uu,.49LAment l*j -ru n: ..;..n. Post f Box 1997, Kalispell, Montana 99- 1 97 Telephone 8-0, 07-- 1 MEMORANDUM April 15, 200 To: Janes C. Hansz, P.., Director of public Works/City Engineer From: Paul E. Bunaham, P.E., Civil Engineer Subject: Buffalo Hills Waterline Replacement Project Bids were received and opened at 2:3 o p.m. on April 11, 200 8 for the referenced project. The City received five bids on this project, as noted below. LHC,1nc. Weaver Gravel, Inc. P.O. Box 7338 1190 Elk 'ark Road Kalispell, MT 59901 Columbia Falls, MT 59912 Amount Bid: $167,420.23 Amount Bid: 1 97- 5 RE , LLC Goose Bay Equipment, Inc, P.O. Box 96 1285 Stillwater load Lakeside, MT 59922 Kalispell, MT 59901 Amount Bid: $162,529.50 Amount Bid: $92,704.40 NCC Neumann Construction Co. 136 Crestline Ave. Kalispell, MT 59901 Amount lid: $13.7,900.00 The engineer's estimate for this project was 155,700,00. The project is shown as Line Item. 934 in the current budget with an estimated cost o155,000.00. Four of the five bids are closely grouped and are in the general range of the engineer's estimate. The apparent love hid, however, falls far below this group. Due to this large inconsistency, we are in the process of reviewing units prices with the apparent low bidder. We are also reviewing the qualifications of the love bidder's sub -contractor on the most critical portion of this project. At this time 1 recommend postponing the award of this project until we can complete an evaluation of the lour bidder's qualifications as well as the sub -contractor's qualifications.