Loading...
2. Bid Award - Woodland Connector Path - Phase 2City of Kalispell Post Office Box 1997 - Kalispell, Montana 59903 Telephone: (406) 758-7701 Fax: (406) 758-7758 REPORT TO: Honorable Mayor and City Council FROM: Mike Baker, Director, Parks and Recreation Jane Howington, City Manager SUBJECT: Woodland Connector Path — Kalispell Phase II STPE 6799 (28) Control No.: 6344 MEETING DATE: September 8, 2009 BACKGROUND: The Woodland Connector pedestrian/bicycle trail connects Woodland Park to Willow Glen, approximately 1.5 miles. Phase I was completed this past year and extends from Woodland Park to Sylvan Drive. Phase II will extend along Sylvan Drive and the nature trail along Spring Creek to approximately Dry Bridge Park. Phase III will complete the connection to Willow Glen/Sam Bibler Trail, scheduled for bid in the summer of 2010. Bids were received for Phase II and Phase III (Schedule I and Schedule II respectively) on Thursday, August 27, 2009 at 2:30 p.m. in City Hall. Seven responsive bids were received and the low bid was Paveco, LLC at $79,878.20 for Phase II (Schedule I) completion. At this time it would be prudent for the city to complete Phase II (Schedule I) and delay Phase III (Schedule II) until additional local match funds are banked from developer park -in -lieu contributions. I anticipate future developer contributions and CTEP allocations would allow for the completion of Phase III in the summer of 2010. RECOMMENDATION: Upon review, approval and concurrence from Montana Department of Transportation it is recommended that Council award bid to low bidder, Paveco LLC ($79,878.20) for construction of Phase II, Schedule I. FISCAL EFFECTS: Budgeted item in current fiscal year. Project cost, Phase II is $79,878.20 at Federal contribution of 86.58% ($69,158.54) with local match of 13.42% ($10,719.66). ALTERNATIVES: As suggested by the City Council. Respectively submitted, Mike Baker, Director, Parks and Recreation Submittals: Bid Tabulation Consultant Recommendation (vane Howington City Manager September 1, 2009 Mike Baker City of Kalispell Parks & Recreation Director Subject: Recommendation of Award: Woodland Connector Path — Phase H Dear Mike: The City of Kalispell received and publicly opened bids at 2:30 p.m. on August 27, 2009, for the Woodland Connector Path — Kalispell — Phase II. Bids were received for two (2) schedules. Only Schedule One will be awarded, per your direction, which was based upon availability of matching local funds. After a careful examination of the bids received, we have determined that the apparent low bidder, for Schedule One, is Paveco, LLC. The contract for the Schedule One Base Bid totals: Seventy Nine Thousand, Eight Hundred and Seventy Eight Dollars and Twenty Cents 679,878.20). Seven (7) bids were received. Bids ranged from 11.76% lower to 29.85% higher than the Engineer's Estimate for Schedule One. The low bid (Paveco, LLC) was 11.76% lower than the Engineer's Estimate of $90,520.00 on Schedule One. Two (2) minor bid irregularities were found in the apparent low bidder's bid set for Schedule One during our review. These irregularities were reviewed by Charles Harball, the City Attorney, and he has agreed with our recommendation to award the project to Paveco, LLC. Two (2) minor bid irregularity where found on other bidder's bids for Schedule One, but none of these irregularities made those bids the low bidder. The City of Kalispell has requested MDT's concurrence in Award for this project, and is anticipating their concurrence by September 8°i, 2009. Once MDT's concurrence in award is received, we would recommend award to Paveco, LLC. Sincerely ROBERT PECCIA & ASSOCIATES G�n—;:3c Brandon Theis, PE Project Engineer K: Kal.Pmj-Data'07118.000 - Woodland Trail,E. Design Correspondeacec t. Client Corresponds e 090901m6.ltr.do HELENA KALISPELL BUTTE P.O. Box 5653 P.O. Box 5100 Thornton Building 825 Custer Avenue 102 Cc -operative Way, Suite 300 65 East 6roadway Helena, MT 59604 Kalispell, MT 59903 Butte, MT 59701 (406) 447.5000 (406) 752-5025 (406) 533-6770 FAX (406) 447-5036 FAX (406) 752-5024 FAX (406) 533-6830 SWMIMV ARY OF BIDS WOODLAND CONNECTOR PATH - PHASE 11 - STPE 699 (28), UIPN: 6344 KALISPELL, MIT Bi!dQpe,ninigDate /Tiitiiie/Location: Atigust27,2009 @ Z30 pin City Hialil, Katispen, Montana Acknowledged SCH O,NIE Apparent Low Apparent Low Bidder Addendum Bud SCHEDULE ONE SCHEDULE TWOS SCHTWO Bidder Sch One Sch: Ore+ Schi 1 wo Engineer's Estimate n/a -Bond n/a $90,520.00 $211,097.00 $301,617.00 Schellinger Const. Co. yes yes $117,537.50 $194,755.40 $312,292.90 Watson Excavating, Inc. yes yes $116,695.00 $231,353.00 $348,048.00 Paveco,LLC yes yes $79,878.20 $190,386.07 $270,264.27 x x Neumann Const. Co. yes yes $108,227.50 $226,873.08 $335,100.58 Knife River yes yes $115,595.00 $206,648.00 $322,243.00 LHC Inc. yes yes $105,645.19 $224,657.52 $330,302.71 Cutting Edge Exc. yes yes $116,460.00 $231,311.54 $347,771.54 OF BIDS WOODLANDSUMMARY . - KALISPELL, MT Robert Peccia & Associates, Inc. 825 Custer Avenue *Helena *Montana * (406) 447-5000 102 Cooperative Way, Suite 300 * Kalispell * Montana * (406) 752-5025 65 East Broadway * Butte * Montana * (406) 533-6770 Engineer's Estimate Schellin er Const. Co. (2) Watson Excavating, Inc. (3) Paveco, LLC Neumann Const. Co. Knife River LHC Inc. Cutting Ed a Exc. Item Unit Unit Price Total Price Unit Price Total Price Unit Price Total Price Unit Price Total Price Unit Price Total Price Unit Price Total Price Unit Price Total Price Unit Price Total Price No. Quantity Unit Description (Figures) (Figures) (Figures) (Figures) (Figures) (Figures) (Figures) (Figures) (Figures) (Figures) (Figures) (Figures) (Figures) (Figures) (Figures) (Figures) SCHEDULE ONE 1 1 LS Clearing, Grubbing, Excavation and Embankment $9,500.00 $9,500.00 $20,000.00 $20,000.00 $24,000.00 $24,000.00 $8,500.00 $8,500.00 $15,200.00 $15,200.00 $27,000.00 $27,000.00 $13,306.33 $13,306.33 $32,240.00 $32,240.00 2 30 LF 18" CSP Culvert $55.00 $1,650.00 $105.00 $3,150.00 $70.00 $2,100.00 $27.19 $815.70 $47.00 $1,410.00 $105.00 $3,150.00 $67.23 $2,016.90 $80.00 $2,400.00 3 525 CY Crushed Base Course-1-1/2" Minus $38.00 $19,950.00 $42.00 $22,050.00 $32.00 $16,800.00 $22.00 $11,550.00 $33.50 $17,587.50 $35.00 $18,375.00 $36.15 $18,978.75 $20.50 $10,762.50 4 260 TON Bituminous Surface Course $75.00 $19,500.00 $72.00 $18,720.00 $90.00 $23,400.00 $63.53 $16,517.80 $78.00 $20,280.00 $66.00 $17,160.00 $70.05 $18,213.00 $77.00 $20,020.00 5 14 SY 4" Concrete Bike/Ped Path $62.00 $868.00 $150.00 $2,100.00 $55.00 $770.00 $76.05 $1,064.70 $450.00 $6,300.00 $365.00 $5,110.00 $31.07 $434.98 $170.00 $2,380.00 6 5 EA Bollard $450.00 $2,250.00 $550.00 $2,750.00 $500.00 $2,500.00 $550.00 $2,750.00 $495.00 $2,475.00 $450.00 $2,250.00 $508.34 $2,541.70 $450.00 $2,250.00 7 7 EA New Sign $600.00 $4,200.00 $250.00 $1,750.00 $300.00 $2,100.00 $350.00 $2,450.00 $275.00 $1,925.00 $250.00 $1,750.00 $282.41 $1,976.87 $250.00 $1,750.00 8 200 CY Imported Topsoil $40.00 $8,000.00 $35.00 $7,000.00 $36.00 $7,200.00 $29.25 $5,850.00 $26.00 $5,200.00 $37.00 $7,400.00 $26.31 $5,262.00 $32.00 $6,400.00 9 0.60 ACRE Hydroseeding, Fertilizer & Mulch $5,000.00 $3,000.00 $2,500.00 $1,500.00 $5,000.00 $3,000.00 (4) $5,416.67 $3,250.00 $2,725.00 $1,635.00 $4,200.00 $2,520.00 $4,920.77 $2,952.46 $2,600.00 $1,560.00 10 1,750 SY Straw ECB (Erosion Control Blanket) $2.00 $3,500.00 $2.65 $4,637.50 $1.50 $2,625.00 $2.06 $3,605.00 $4.00 $7,000.00 $2.50 $4,375.00 $0.73 $1,277.50 $1.95 $3,412.50 11 2,140 LF Silt Fencing With Straw Waddles $3.00 $6,420.00 $4.50 $9,630.00 $4.50 $9,630.00 $4.00 $8,560.00 $4.20 $8,988.00 $4.50 $9,630.00 $5.25 $11,235.00 $6.75 $14,445.00 12 1 LS 12" Solid Waterbome Striping $400.00 $400.00 $500.00 $500.00 $500.00 $500.00 $325.00 $325.00 $975.00 $975.00 $1,500.00 $1,500.00 $1,213.25 $1,213.25 $500.00 $500.00 13 1 EA 6' Table/Shelter Combo -Perforated (SH105) $2,500.00 $2,500.00 $4,300.00 $4.300.00 $3,500.00 $3,500.00 $4,480.00 $4,480.00 $4,675.00 $4,675.00 $4,000.00 $4,000.00 $4,801.03 $4,801.03 $4,250.00 $4,250.00 14 1 EA DOGIPOT Aluminum Bag Dispenser $600.00 $600.00 $200.00 $200.00 $220.00 $220.00 $350.00 $350.00 $210.00 $210.00 $200.00 $200.00 $214.63 $214.63 $190.00 $190.00 15 1 EA 6' Bench In -Ground - Diamond (PP411) $900.00 $900.00 $700.00 $700.00 $750.00 $750.00 $875.00 $875.00 $742.00 $742.00 $650.00 $650.00 $762.52 $762,52 $675.00 $675.00 16 1 EA 32-Gallon Receptacle - Diamond (LR300) $800.00 $800.00 $550.00 $550.00 $600.00 $600.00 $635.00 $635.00 $550.00 $550.00 $525.00 $525.00 $593.07 $593.07 $525.00 $525.00 17 1 LS Construction Surveys & Material Testing $2,000.00 $2,000.00 $8,500.00 $8,500.00 $7,000.00 $7,000.00 $3,800.00 $3,800.00 $4,750.00 $4,750.00 $4,000.00 $4,000.00 $9,035.89 $9,035.89 $7,100.00 $7,100.00 18 1 LS Traffic Control $1,000.00 $1,000.00 $1,500.00 $1,500.00 $6,000.00 $6,000.00 $1,500.00 $1,500.00 $4,225.00 $4,225.00 $1,500.00 $1,500.00 $6,804.88 $6,804.88 $1,900.00 $1,900.00 19 1 LS Mobilization, Bonding and Submittals (4% Max) $3,482.00 $3.482.00 (1) $8,000.00 $8.000.00 $4,000.00 $4,000.00 $3,000.00 $3,000.00 $4,100.00 $4,100.00 $4,500.00 $4,500.00 JI $4,024.43 $4.024.43 $3,700.00 $3,700.00 TOTAL SCHEDULE ONE $90,520.00 $117,537.50 $116,695.00 $79,878.20 $108,227.50 $115,595.00 $105,645.19 $116,460.00 SCHEDULE TWO 1 1 LS Clearing, Grubbing, Excavation and Embankment $13,000.00 $13,000.00 $17,000.00 $17,000.00 $34,000.00 $34,000.00 $8,500.00 $8,500.00 $28,400.00 $28,400.00 $27,000.00 $27,000.00 $14,987.91 $14,987.91 $45,760.00 $45,760.00 2 420 LF Retaining Wall $95.00 $39,900.00 $118.00 $49,560.00 $108.00 $45,360.00 (5) $123.80 $51,996.00 $117.00 $49,140.00 $120.00 $50,400.00 $142.80 $59,976.00 $118.00 $49,560.00 3 850 CY Crushed Base Course - 1-1/2" Minus $38.00 $32,300.00 $40.00 $34,000.00 $32.00 $27,200.00 $22.00 $18,700.00 $33.00 $28,050.00 $35.00 $29,750.00 $36.15 $30,727.50 $20.50 $17,425.00 4 430 TON Bituminous Surface Course $75.00 $32,250.00 $72.00 $30,960.00 $90.00 $38,700.00 $63.79 $27,429.70 $78.00 $33,540.00 $66.00 $28,380.00 $72.29 $31,084.70 $77.00 $33,110.00 5 5 SY 4" Concrete Bike/Ped Path $62.00 $310.00 $185.00 $925.00 $55.00 $275.00 $84.50 $422.50 $450.00 $2,250.00 $365.00 $1,825.00 $31.07 $155.35 $170.00 $850.00 6 2 EA Bollard $450.00 $900.00 $500.00 $1,000.00 $400.00 $800.00 $550.00 $1,100.00 $495.00 $990.00 $450.00 $900.00 $508.35 $1,016.70 $450.00 $900.00 7 5 EA New Sign $600.00 $3,000.00 $250.00 $1,250.00 $300.00 $1,500.00 $350.00 $1,750.00 $275.00 $1,375.00 $250.00 $1,250.00 $282.41 $1,412.05 $250.00 $1,250.00 8 1 EA Monitoring Well Adjustment $300.00 $300.00 $1,200.00 $1,200.00 $500.00 $500.00 $250.00 $250.00 $1,500.00 $1,500.00 $650.00 $650.00 $698.61 $698.61 $400.00 $400.00 9 1 LS Guardrail Improvements $3,300.00 $3,300.00 $3,000.00 $3,000.00 $2,000.00 $2,000.00 $2,800.00 $2,800.00 $5,500.00 $5,500.00 $4,500.00 $4,500.00 $2,806.53 $2,806.53 $4,000.00 $4,000.00 10 234 LF Steel Two Rail Hand Rail $50.00 $11,700.00 $30.00 $7,020.00 $35.00 $8,190.00 $87.00 $20,358.00 $33.00 $7,722.00 $30.00 $7,020.00 $33.89 $7,930.26 $30.00 $7,020.00 11 25 CY Imported Topsoil $40.00 $1,000.00 $42.00 $1,050.00 $36.00 $900.00 $29.25 $731.25 $34.00 $850.00 $37.00 $925.00 $36.51 $912.75 $32.00 $800.00 12 0.76 ACRE Hydroseeding, Fertilizer & Mulch $5,000.00 $3,750.00 $3,000.00 $2,250.00 $5,000.00 $3,750.00 (6) $3,550.00 $2,662.50 $4,850.00 $3,637.50 $4,200.00 $3,150.00 $4,921.37 $3,691.03 $4,800.00 $3,600.00 13 250 SY Straw ECB (Erosion Control Blanket) $2.00 $500.00 $2.70 $675.00 $3.50 $875.00 $3.80 $950.00 $4.00 $1,000.00 $2.50 $625.00 $1.30 $325.00 $1.95 $487.50 14 2,820 LF Silt Fencing With Straw Waddles $3.00 $8,460.00 $4.50 $12,690.00 $4.50 $12,690.00 $4.00 $11,280.00 $4.20 $11,844.00 $4.50 $12,690.00 $4.15 $11,703.00 $6.75 $19,035.00 15 436 LF 6' Chain Link Fence $20.00 $8,720.00 $10.70 $4,665.20 $12.00 $5,232.00 (7) $11.71 $5,105.56 $11.70 $5,101.20 $11.00 $4,796.00 $12.03 $5,245.08 $10.65 $4,643.40 16 1,978 LF 4' Chain Link Fence $16.00 $31,648.00 $8.40 $16,615.20 $9.50 $18,791.00 $9.22 $18,237.16 $9.21 $18,217.38 $9.00 $17,802.00 $9.47 $18,731.66 $8.38 $16,575.64 17 1,080 LF Barbwire Fence $3.00 $3,240.00 $2.25 $2,430.00 $3.00 $3,240.00 $2.48 $2,678.40 $2.50 $2,700.00 $2.00 $2,160.00 $2.54 $2,743.20 $2.25 $2,430.00 18 1 LS Existing Cistern Improvements $2,000.00 $2,000.00 $900.00 $900.00 $1,500.00 $1,500.00 $3,500.00 $3,500.00 $4,500.00 $4,500.00 $2,700.00 $2,700.00 $3,035.96 $3,035.96 $1,200.00 $1,200.00 19 1 EA DOGIPOT Aluminum Bag Dispenser $600.00 $600.00 $190.00 $190.00 $250.00 $250.00 $350.00 $350.00 $210.00 $210.00 $200.00 $200.00 $214.63 $214.63 $190.00 $190.00 20 2 EA 6' Bench In -Ground - Diamond (PP411) $900.00 $1,800.00 $675,00 $1,350.00 $750.00 $1,500.00 $875.00 $1,750.00 $742.00 $1,484.00 $650.00 $1,300.00 $762.52 $1,525.04 $675.00 $1,350.00 21 1 EA 32-Gallon Receptacle - Diamond (LR300) $800.00 $800.00 $525.00 $525.00 $600.00 $600.00 $635.00 $635.00 $550.00 $550.00 $525.00 $525.00 $593.07 $593.07 $525.00 $525.00 22 1 LS Construction Surveys & Material Testing $2,500.00 $2,500.00 $1,000.00 $1,000.00 $9,500.00 $9,500.00 $4,200.00 $4,200.00 $4,750.00 $4,750.00 $4,000.00 $4,000.00 $13,301.42 $13,301.42 $7,600.00 $7,600.00 23 1 LS Traffic Control $1,000.00 $1,000.00 $500.00 $500.00 $8,000.00 $8,000.00 $2,000.00 $2,000.00 $4,875.00 $4,875.00 $1,500.00 $1,500.00 $8,165.83 $8,165.83 $5,000.00 $5,000.00 24 1 LS Mobilization, Bonding and Submittals (4% Max) $8,119.00 $8,119.00 $4,000.00 $4,000.00 $6,000.00 $6,000.00 $3,000.00 $3,000.00 $8,687.00 $8,687.00 $2,600.00 $2,600.00 $3,674.24 $3,674.24 $7,600.00 $7,600.00 TOTAL SCHEDULE TWO $211,097.00 $194,755.40 $231,353.00 $190,386.07 $226,873.08 $206,648.00 $224,657.52 $231,311.54 TOTAL SCHEDULE ONE + SCHEDULE TWO $301,617.00 1 $3192.90 $348,048.00 $270,264.27 $335,100.58 $322,243.00 $330,302.71 $347,771.54 2,2 TRUE TABULATION OF BIDS RECEIVED Robert Peccia & Associates Today's Date: August 27, 2009 Notes 1) Bid Irregularity: Bid price exceed 4% of the total base bid for Schedule One. 2) Bid Irregularity: Bidder hand wrote the "Amount Bid" instead of the "Unit Bid Price" on each bid item on the entire Proposal. 3) Bid Irregularity: Bidder hand wrote the "Amount Bid" instead of the "Unit Bid Price" on each bid item on the entire Proposal. 4) Bid Irregularity: Bidder failed to fill in the "Unit Price" space on the Proposal. Value shown on this tabulation was back solved from the given "Amount Bid" value shown on the Proposal. 5) Bid Irregularity: Bidder math does not check out The riumeric "Unit Bid Price" was used to calculate the "Total Price" shown on this tabulation. The "Total Price" on this tabulation does not match the "Amount Bid" shown on the Proposal. 6) Bid Irregularity: Bidder math does not check out. The numeric "Unit Bid Price" was used to calculate the "Total Price" shown on this tabulation. The "Total Price" on this tabulation does not match the "Amount Bid" shown on the Proposal. 7) Bid Irregularity: Bidder math does not check out. The numeric "Unit Bid Price" was used to calculate the "Total Price" shown on this tabulation. The "Total Price" on this tabulation does not match the "Amount Bid" shown on the Proposal.