Loading...
2. Award Bid - Glenwood Drive Drainage Improvements201 1'Avenue East, P.O. Box 1997, Kalispell, MT 59903 Phone (406)758-7720— Fax (406)758-7831 www.kalispelt com REPORT TO: Mayor and City Council FROM: James C. Hansz, P.E., Director of Public Works SUBJECT: Award Bid —Glenwood Drive Drainage Improvements MEETING DATE: May 18, 2009 BACKGROUND: Six bids were received for the Glenwood Drive Drainage Improvements project. The bids ranged from a high of $123,471.59 to the low bid of $74,096.00 submitted by Sandry Construction. The project will install culverts, re -grade and realign ditch lines, erosion control and landscape restoration on the east side of Glenwood Drive between Two Mile Drive and Liberty street. The project is indentified in the Storm Drainage Facility Plan, and is budgeted in the current fiscal year at $135,000. Engineer's estimate for the project was $106,000. All bids were in order and the recommendation is to award the bid to Sandry Construction. ACTION REQUESTED: AT CITY COUNCIL MEETING OF MAY 18', MOTION TO AWARD OF THE BID FOR THE GLENWOOD DRIVE DRAINAGE IMPROVEMENT PROJECT TO SANDRY CONSTRUCTION OF KALISPELL. FISCAL EFFECTS: Total expenditure of $74,096.00, from the 2008/2009 Storm Drainage budget. ALTERNATIVES: As suggested by the City Council Respectfully / Awe� C. Hansz, M 6ebb/// Director of Public Wor s / ity Engineer Interim City Manager Attachment: Staff Memo MEMORANDUM May 7, 2009 To: James Hansz, PE, Director of Public Works, City Engineer From: Fred Zavodny, P rKi� Re: Glenwood Drive Drainage I ments Project — Bid Analysis and Recommendation Bids for the Glenwood Drive Drainage Improvements Project were opened on Wednesday, May 6, 2009. The project tasks include culvert replacement, storm drainage ditch grading and realignment, erosion control, and restoration landscaping on the east side of Glenwood Drive between Two Mile Drive and Liberty Street. Bids were received from Sandry Construction, Knife River, Settle Contracting, Schellinger Construction, Rehbein Enterprises, and LHC Incorporated. All bids were in order and contained the required Bid Bond. The bid analysis is as follows: CONTRACTOR SANDRY CONSTRUCTION - BIGFORK KNIFE RIVER - KALISPELL SETTLE CONTRACTING - KALISPELL SCHELLINGER — COLUMBIA FALLS REHBEIN ENTERPRISES - POLSON LHC INCORPORATED - KALISPELL TOTAL BID PRICE $ 74,096.00 $ 82,510.00 $ 82,714.00 $ 88,101.00 $ 98,587.98 $123,471.59 A total of $135,000.00 has been appropriated by the City Council for the Glenwood Drive Drainage Improvements Project. The Engineers construction estimate for the project amounted to $106,000.00. I recommend the bid for the Glenwood Drive Drainage Improvements Project be awarded to Sandry Construction in the amount of $74,096.00.