5. Ordinance 1655 - Zone Change with PUD Overlay - Cornerstone Church - 1st ReadingREPORT TO: Kalispell Mayor and City Council FROM: Sean Conrad, Senior Planner Myrt Webb, Interim City Manager SUBJECT: Cornerstone Community Church Access onto Highway 93 MEETING DATE: March 23, 2009 During the council's March 2nd meeting to consider the Cornerstone Community Church's zone change and PUD request, the council had several concerns about a proposed right-in/right-out access onto Highway 93. The council's concerns included: Conflicts the approaches may have with the existing bike path Adequate deceleration lane for southbound traffic to slow down as it enters the site • Traffic back up at the intersection of Highway 93 and Northridge Drive may cause traffic to back up in the right -out lane. This in turn could leave vehicles stopped on the bike path. The council tabled the proposed project to its March 23rd meeting and directed staff to discuss the above issues with the Montana Department of Transportation (MDT). The purpose of the discussion was to insure MDT was aware of the council's concerns and modify the approach, if necessary. Planning staff met representatives from the Kalispell MDT office on Thursday, March 5th, to discuss the issues brought up by the council. The MDT approved this new right-in/right-out approach because it met all of MDT's requirements including: • Proper location in relation to other accesses along Highway 93 • Adequate site distance for both pedestrian and vehicles • The right-in/right-out turn movements eliminate conflicting turning movements on and off of Highway 93 • The right-in/right-out approach eliminates the existing full movement approach onto Highway 93 just north of the church A letter from James Freyholtz, Kalispell Area Traffic Engineer for MDT, dated March 9, 2009 reiterates the above reasons why the approach was permitted and is acceptable to MDT without any necessary design changes. In addition, there is already an approximately 11 foot paved shoulder along this section of Highway 93. Vehicles using this new right -in approach would use this shoulder to lower their speeds outside of the two travel lanes to safely make the right turn into the development. Planning staff also spoke with the Kalispell Parks and Recreation Department regarding the two approaches crossing the bike path. The Department did not see an issue with the crossings. The Department felt that the narrow width of each entrance and exit approach (15 feet) as well as the small island where bicyclists or pedestrians could wait safely for traffic to pass by, was not detrimental to the function or safety of the bike path. The bike path and sidewalk systems throughout the city cross many streets and driveways similar to the proposed approach. The Department did recommend if the council is still concerned with the right-in/right-out approaches crossing the bike path, the council could consider having the developer install caution signs along the bike path both north and south of the approach. RECOMMENDATION: A motion to approve the zone change and planned unit development overlay zoning with the planning board's recommended conditions would be in order. FISCAL EFFECTS: Minor positive impacts once fully developed. ALTERNATIVES: As suggested by the City Council. Respectfully submitted, Sean Conrad Myrt ebb Senior Planner Interim City Manager Report compiled: March 11, 2009 c: Theresa White, Kalispell City Clerk Attachments: Letter from James Freyholtz, Kalispell MDT Office Approved Highway 93 Access detail Planning art ent 201 V Avenue East Kalispell, MT 59901 Phone: (406) 758-7940 Fax: (406) 758-7739 www.kalispell.com/plannin PORT TO: Kalispell Mayor and City Council FROM: Tom Jentz, Director Myrt Webb, Interim City Manager SUBJECT: Cornerstone Community Church PUD ETING DATE: March 23, 2009 If the council still has concerns with the safety of the Valley Bank - Highway 93 and Northridge intersection, the council may consider sending a letter to the Montana Department of Transportation requesting the Department take into account the following additional actions at this intersection: • Install left turn signals at the intersection of Highway 93 and Northridge to allow east and west bound traffic a protected left turn movement onto Highway 93 (requires MDT approval and installation) • Require a designated deceleration/turn lane into the bank along Highway 93 shoulder using the existing parking lane on Highway 93. This lane could be signed a reduced speed. (Requires MDT approval as they are not requiring this at this time. Installation work would be completed by the Valley Bank), The council may consider taking the following actions to mitigate traffic concerns associated with the project and the intersection of Highway 93 and Northridge Drive: • Placing a stop at Northridge Drive and Parkway creating a 4-way stop to slow traffic down as it approaches the intersection of Highway 93 and Northridge Drive. (Requires city action) • Place pedestrian scale yield signs on the bike path at the "y" intersection into the bank where the access road crosses the bike path. (requires installation by Valley Bank as part of the PUD) • Install curb, gutter and boulevard along the south side of Northridge Drive along the Buffalo Hills Funeral Home. This would serve to define and restrict the access into the funeral home off of Northridge and thereby reduce the shortcut that traffic now uses to get onto Highway 93 south avoiding the Highway 93 - Northridge Drive intersection. Curb now extends up from the west along Northridge Drive and stops at the funeral home. (Requires city action and possible city expense to install). ALTERNATIVES: As suggested by the City Council. Respectfully submitted, t ow -- Tom Jentz M Web Director Interim City Manager Report compiled: March 20, 2009 c: Theresa White, Kalispell City Clerk A Montana Department of Transportation Jim Lynch. Director Brian Schweitzer. Governor Kalispell Area Office 85 Fifth Avenue East North PO Box 7308 Kalispell, MT 59904-0308 March 9, 2009 Sean Conrad - City of Kalispell Planning Department---- 201 1 "Avenue East Kalispell, MT 59901 Subject: Cornerstone Church Development Access E (D - 0 V E 0121 0 209 WISPELL PLANNING DEPARTMENT Sean, this letter is a follow up to the meeting held on Thursday, March 5th, which included the Montana Department of Transportation (MDT), representatives of the Conerstone Church development and yourself The owners had previously been issued a permit for a proposed right-in/right-out approach by the MDT. The meeting was to discuss the access to US 93 and verify there were no issues with the location and design of the approach. As we discussed during the meeting the new access meets all of the MDT's requirements including the following: proper location in relation to other accesses along US 93, the sight distance is good for both vehicles and pedestrians, turn movements restricted to right turns only thus eliminating conflict points, in addition the existing full movement access to US 93 will be eliminated. Thus the approach as was permitted by the NOT is acceptable without requiring any design changes. Thank you, for verifying with MDT that the proposed approach is acceptable. If you have any questions please feel free to contact me. Sincerely, James M. Freyholtz, P.E. Kalispell Area Traffic Engineer (406) 751-2066 copies: File Rich Sipe, Kalispell Maintenance Superintendent Richard Swan, TD&H Phone: (406) 751-2000 An Equal Opportunity Employer TrY. (800) 335-7592 Fax: 1406) 752-5767 Web Page: www-mdt.mtgov lolfxl�� NEW HIGHWAY 93 ACCESS BUILT TO ROAD TO ACCESS r,ONCRETE CURB AND GUTTER DETAIL DRAWN BY. JRR OATS AUQUST12W200d OEMUro BY: JOB NO- Nm*23 SHEET CUAUPY CK-CK: CADNO. .OWO Return to: Kalispell City Clerk PO Box 1997 Kalispell, MT 59903 KALISPELL ZONING ORDINANCE, (ORDINANCE j REAL PROPERTY MORE PARTICULARLY DESCRIBED AS LOT 1A, KALISPELL ADDITION NO. 15A LOCATED IN SECTION 1, TOWNSHIP 28 NORTH,RANGE FLATHEAD (PREVIOUSLY 1 CITY R-3 r . i r ., I t 1110 VINT1911113 ... WHEREAS, the Cornerstone Community Church, the owner of the property described above, petitioned the City of Kalispell that the zoning classification attached to the above described tract of land be zoned B-1, Neighborhood Buffer District, with a Planned Unit Development overlay on approximately 3 acres of land, and WHEREAS, the property is located on the west side of Highway 93 at the intersection of Highway 93 and Northridge Drive, and WHEREAS, the petition of the Cornerstone Community Church was the subject of a report compiled by the Kalispell Planning Department, Staff Report #KZC-09-01/KPUD- 08-03, in which the Kalispell Planning Department evaluated the petition and recommended that the property as described above be zoned B-1, Neighborhood Buffer District with a Planned Unit Development overlay, pursuant to Kalispell City Code 72.21.030(2)(b), and WHEREAS, the Kalispell City Planning Board held a Public Hearing on the matter on February 10, 2009, and recommended that the zoning be City B-1, Neighborhood Buffer District with a Planned Unit Development overlay, pursuant to Kalispell City Code 72.21.030(2)(b), and WHEREAS, after considering all the evidence submitted on the proposal to zone the property as described B-1, Neighborhood Buffer District with a Planned Unit Development overlay, the City Council finds such zoning to be consistent with the Kalispell Growth Policy 2020 and adopts, based upon the criterion set forth in Section 76-3- 608, M.C.A., and State, Etc. v. Board of County Commissioners, Etc. 590 P2d 602, the findings of fact of KPD as set forth in Staff Report No. #KZC-09-01/KPUD-08- 03. NOW THEREFORE, BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF KALISPELL, AS FOLLOWS: SECTION I. Section 27.02.010, of the Official Zoning Map of the Kalispell Zoning Ordinance, (Ordinance No. 1460) is hereby amended by designating the property described above as B-1, Neighborhood Buffer District with a Planned Unit Development overlay on approximately 3 acres of land. SECTION II. The balance of Section 27.02.010, Official Zoning Map, City of Kalispell Zoning Ordinance not amended hereby shall remain in full force and effect. SECTION III. This Ordinance shall take effect from and after 30 days of its passage by the City Council. PASSED AND APPROVED BY THE CITY COUNCIL AND SIGNED BY THE MAYOR OF THE CITY OF KALISPELL, MONTANA, THIS 2ND DAY OF MARCH, 2009. ATTEST: Theresa White City Clerk Pamela B. Kennedy Mayor KALISPELL CITY PLANNING BOARD & ZONING COMNIISSION MINUTES OF REGULAR MEETING FEBRUARY 10, 2009 CALL TO ORDER AND ROLL The regular meeting of the Kalispell City Planning Board CALL and Zoning Commission was called to order at 7:00 p.m. Board members present were: Bryan Schutt, Rick Hull, C.M. (Butch) Clark, John Hinchey, Jim Williamson and Troy Mendius. Richard Griffin was absent. Tom Jentz and Sean Conrad represented the Kalispell Planning Department. There were approximately 15 people in the audience. APPROVAL OF MINUTES Hinchey moved and Hull seco`dd., a motion to approve the minutes of the January 13,,'and January 27th meetings of the Kalispell City Plannuag td and Zoning Commission. ROLL CALL The motion passed uxlantxnously !' roll call vote. PUBLIC COMMENT No one wished to speak..., CORNERSTONE A request by the G er Lori .-Church to-' zone a portion of COMMUNITY CHURCH ZONE their 3.9 acre propertocated at the northwest corner of CHANGE & PLANNED UNIT the intersection of Northdge Drive and Highway 93. The DEVELOPOMENT zone change includes chafing the zoning on approximately 3 acres frorrr 3 (Urban Strangle Family Residential) to B-1 (Neighborhood F3utr District) to accommodate the location of a new back.:. �II'he rtV4 0.9 acre of land owned by e church winway g ParkDrive will remain R-3. The church is als;,requesting a planned unit development (PUD) oV rlay zoning d trict on the proposed B-1 portion of the pxo�erty. STAFF REPORT` T�Pil;=fl$ 03an Conrad representing the Kalispell Planning Department & KZC-09-011 ' re eyed staff report KPUD-08-03 & KZC-09-01 for the board Conrad stated the Cornerstone Community Church zone change & PUD is 3.9 acres in size and is located on the northwest corner of US Highway 93 North and Northridge Drive. He reviewed the current zoning and land use designations on the property. The owners of this property are requesting a zone change on the eastern portion of the property from R-3 (Urban Single - Family Residential) to a B-1 (Neighborhood Buffer) district and plan to retain the R-3 zoning district along Parkway Drive on the western portion of their site. Both the R-3 and B-1 districts are consistent with the growth policy. Conrad continued in addition to the zone change the PUD zoning is proposed over the B-1 portion of the property. The purpose of the PUD district is to ensure compatible Kalispell City Planning Board Minutes of the meeting of February 10, 2009 Page 1 of 10 development with the neighboring R-3 residential properties and to maintain the neighborhood integrity of the Northridge Subdivision located immediately west of the proposed B-1 site. As part of the PUD the owner is requesting 3 deviations which includes a zero side yard setback to accommodate an overhang for the proposed 4 drive -through lanes with the associated bank; a reduced rear yard setback from 20 to 10 feet to take into account the existing church building; and to allow a bank with 4 drive -through lanes, a 6,000 square foot footprint, with an ultimate size of between 8,000 & 9,000 square feet. Conrad said with the PUL landscaping along Highway,, boundary to screen bQ" necessary parking that.;; req would also ensure tl�e neighl what is happening in their r assured that qj# signifcant would have too 'Mack thrual `ahe; developer is proposing and along the east property 4e existing church and the dy for this project. The PUD grit=;;residential properties of ighUgdiood and they can be change e Qn this project site the city council for approval. The planning board='1d a work session on this project 2 weeks=.ago and nothing`ftp changed since that work session. Conrad,-,'., dlcated some ", e planning board members had concerns a i t,_ needing acl&A onal landscaping to help screen the long ;stretch of;; parking next to the highway. Conrad said thy,.. cieveaper's consultant will address this issue during.tle public Baring. mmOids that the Kalispell City Planning Board and �mmion adopt Staff Report #KPUD-08-03 8s KZC- fdigs of fact and recommend to the Kalispell City the zoning for approximately 3 acres of the be changed to B-1, Neighborhood Buffer District PUD for Cornerstone Community Church be subject to the 10 conditions listed in the staff report. APPLICANT/CONSDoug Kauffman, Thomas, Dean 8s Hoskins stated he is representing the Cornerstone Community Church. Kauffman said they did go back and revisit the entire parking area along Highway 93. They tried to reduce the parking along Highway 93 by using the large open space which is directly west of the church. He said there are some fairly severe slope constraints that run directly along the western edge and in trying to layout a viable parking scenario with access, there may be a gain of 6 spaces. However, he added, there would be a reduction of 2 existing spaces and therefore the net gain would only be 4 parking spaces. He said considering the construction constraints with the severe slope they looked at excavating 2-3 feet but then there were issues with existing utilities. There is a service line that comes in from the west and also a vault that would have to be reconstructed and Kalispell City Planning Board Minutes of the meeting of February 10, 2009 Page 2 of 10 reburied. Kauffman continued the second scenario was removing approximately 4 spaces from the northern area of the parking lot and relocating those directly in front of the church in what is now the open area. Kauffman said while that could have been functional the client prefers to leave that area open for church services and functions and an additional issue was emergency vehicle access. Fire trucks coming in off of Highway 93 encroached half -way into those spaces. Consequently, Kauffman with the current configu: re -measured the actual property boundary, wh the roadway to the edge 12 feet of berme"' gree approximately 5 "feet wl other side of the=l iL-hway. ey decided to go forward tdr. He °also pointed out that he §t hce from the roadway to the is a ' Iut 40 feet from the edge of F the RN _ and with an additional belt th6ieN vould be a total of ;h is equivalent to what is on the Kauffman said they=htacted MDT regarding adding some green °: axea to the port ,hop entrance and MDT indicated they w}d approve the addition as long as it is irrigated and there is "A'," matenance agre6� in place. Kauffmanoncuded by;tating they are amenable to all of the conditios'=as currently written. Clark expressed° his disappointment that the parking along the highway was not reconsidered. He said along the right hand a-e font of the proposed bank building, it appears that the berm will be much higher than the one in front of t;;aeastern parking area. Kauffman said yes that is currently the`'ay it is configured. They are proposing a 2-1/2 foot berr'` °along the eastern parking area in the 52 foot buffer area and the berm along the bank is approximately 3-1/2 to 4 feet. Clark suggested increasing the berm to 3-1/2 to 4 feet all along the highway. Hinchey said he has the same concerns. He added with a narrower greenbelt in front of the parking area along the highway they are concerned about the visual affect. Hinchey suggested getting an agreement with the state to encroach onto the R/W to increase the berm. Hinchey said they are trying to achieve a visual pattern on the west side similar to the one on the east side of the highway. Kauffman said they could look into that but they are also partially constrained by the existence of the pedestrian bike path that is directly on the property boundary and he added with increasing the slopes you start getting into erosion issues. Clark restaed the height of the berm should be the same all Kalispell City Planning Board Minutes of the meeting of February 10, 2009 Page 3 of 10 the way along the parking on the east side of the property so it doesn't look like a parking lot. Hinchey added there was discussion regarding parking to the north of the church and asked if they looked at that. Kauffman said yes but in that situation they felt parking there would not be functional for the bank and the client has requested that they try to keep the area north of the church open for other purposes. Schutt noted west of the church is not really an option due to slopes and utilities and north of the church also has slope issues and Kauffman said yes. Schutt asked about east of the bank and Kauffman said there may be some parking availability there but that would =have to be discussed with the bank's representative. PUBLIC HEARING Joel Hausen, 536 ParkWay Dnve stated he wasn't able to attend the work session but he zs, cflncerned with the added traffic coming to the bank and he suggested that aleft-hand turn signal be, ;added to the signal at ,the. intersection of Northridge Driv brad Highway 93. Pastor Luke Knoll=°'odierstone Community Church, stated he is representing the=>urch. He said they inherited this buildin d now it needs a lot of repairs so they thought why not sell':a piece of this property and then they could improve riot only tliea.. buildxrg but their parking lot, curb appeal, etc .The bike p "really limits them a great deal for ixxiprovements" the e' Most of the parking in this area is dly used by,',, -,',.,.,the church on Sunday, Wednesday evenings and possibly Saturday evenings in the future. If they change tk ,parking and die congregation has to park at the back of tl`e chtreh they will lose all of the spots on the east in order o- make ` ```w de enough to access that area. In addition it will Whit the church's future plans to build a gymnasium or con Ututy center and would cause problems for elderly peopte who are dropped off in front of the church for services. Pastor Knoll said with the added improvements to the building, paving and the additional landscaping it will be nice and hopefully that will be enough. He added in looking at the parking across the highway the vehicles are not shielded very well and all he is asking is to be treated the same. Mendius asked if the bike path and berm is an impediment to having adequate space for parking and Knoll said adding the berm moved the parking even closer to the building so with the bike path the only way to extend the landscaping is if the path is taken out. Mendius asked Knoll if he was satisfied with the parking plan as proposed and Knoll said he is satisfied with the proposed plan vs. moving the parking north or trying to put parking on the steep grade to the west. Knoll added he doesn't want to spend the church's money to move the bike path either when they need their funds to Kalispell City Planning Board Minutes of the meeting of February 10, 2009 Page 4 of 10 remodel the inside of the church. Hinchey said he still doesn't like the parking design and suggested ways he thought would improve the layout. Clark asked for clarification on the shared parking with the bank and although Knoll didn't feel the bank parking would overflow to the east parking area Clark felt the bank employees would park in that area. Clark said the berm solution was the best way to remedy the visibility of the parking area. David Mitchell, representin road on the east side of the the drive -through and talk ;. design. To the south of .t�aT" greenbelt so what they hied heavy landscaped qXa sigh bank and then taper"tlzb 1 After the bank.,,,the highway really can't see too :much ;of Mitchell said a restll%tio ,m retaining wall, sofikR = ush dropping off into a beiti so to hide �o. parking area w:h more atfracte, e. Mitchell sat bank is 3;0 spac:and he . spaces it alone; the one else g Valley Bank said they had a bad a..one point to get access to r,g�.p'to planning they changed the a;site the funeral home has no to"?with this design is create a t on tide corner in front of the area. to speak and the public hearing was MOTION _Hull moved � and Williamson seconded a motion to adopt staff. reports KZC-09-01 & KPUD-08-03 as findings of fact andeommend to the Kalispell City Council that the zoning for approximately 3 acres of the property be changed to B-1, Neighborhood Buffer district and that the PUD for Cornerstone Community Church be approved subject to the 10 conditions listed in the staff report. BOARD DISCUSSION Hinchey said the issue is the discrepancy between the appearance of the parking areas on the west side of the highway and what is currently on the east. Hinchey said it seems to him he doesn't notice the parking to the east and asked if it has a bigger greenbelt? Jentz said they spent a lot of time working with the church, since last spring on this project. What you see right now on the west side is an open area with a building, and what you don't see is the trees and landscaping. It looks exactly like the east side did before it was developed. The berm on the east side is high enough to block the headlights and bumpers but not totally sight obscuring. Kalispell City Planning Board Minutes of the meeting of February 10, 2009 Page 5 of 10 Jentz said in the discussions about this development staff pushed them as hard as they could to find places for the landscaping and parking. There is an existing church which limits what they can do so staff couldn't ask for a duplication of the east side because there wasn't the room. However, Jentz added when the board sees it when it is all completed it will pull together really well. Having a higher berm in front of the bank is a priority because keeping those headlights away from Highway 93 is important. MOTION - ADD CONDITION Clark moved and Hinchey seconded a motion to add # 11 condition # 11 that would prohibit bank parking in the easterly parking area, along:? 'ghway 93. In addition signage is required that reads'"Church Parking Only". BOARD DISCUSSION There was discussion the``parking requirements for the church and the ban.=onrad sy,the church is meeting their minimum wfh tine 71 parks e{; paces and the bank needs a bit less; than 1/2 of that aria unt.:. The bank has parking to the south of the bank and plying south of the church between fie chuxc:. and the link, which will be plenty. Jentz s:td.;he thinks this.s a, good compromise and the bank's rtxpres�xative said they can live with that condition. ROLL CALL - ADD The motion passed tax roll call vote of 4 in favor and 2 CONDITION # 11 10, apposed BOARD DISCUSSION ' WJJliamson said,, he is in the position of designing parking 1,0A and he is poi frustrated with the applicant because he eeon difficult design challenges, mostly because of the misting building and he thinks they have done what they 8a ; eto carry the trend across the highway. To try and relocate some of the parking the board has heard from the developer's representative why they can't do that and in Williamson's experience what they are saying makes sense. This is a good layout for the property and for that reason Williamson can support it as is. Clark said under the circumstances this is a good layout and with the amendment he will support the project. Hull said they are not allowed the sign logo along the highway yet other businesses have signs facing the highway. Jentz noted those other businesses were part of the hospital PUD. Conrad said he wanted to address the comment made by Mr. Hausen regarding the need for a left -turn signal at the intersection of Northridge Drive and Highway 93 North. MDT is already planning to install left -turn signals at that Kalispell City Planning Board Minutes of the meeting of February 10, 2009 Page 6 of 10 intersection by this summer. ROLL CALL - ORIGINAL The motion passed, as amended, on a roll call vote of 5 in MOTION I favor and 1 opposed. KALISPELL WEST GROWTH A request by the city of Kalispell to amend the Kalispell POLICY AMENDMENT Growth Policy 2020 by generally expanding the boundaries of the Growth Policy map west using Church Drive as the northern boundary, Two Mile Drive as the southern boundary, Farm to Market Road as the western boundary and using the existing city limit,boundary and the Stillwater River as the eastern boundary;::::__ The Growth Policy amendlnenti es intended to give broad policy direction to grow in th''area should property owners wish to anneao the city 'ire policy anticipates the extension of urban=services including sewer and water into this area over tune and is designed to give guidance to this associatedrowthw,.. STAFF REPORT KGPA-09-01 I Tom Jentz, representing the Kalispell Planning Department reviewed ,staff report k ftk09-01 for the board. Jentz revievrred he history o this amendment and public meetings includf ,,1h plar i ng board work sessions, West Valley Con munYty 40exi%`House meetings, and meetings th the WWt Valley,;:,"and Riverdale Land Use Advisory Committees, 'the West Valley School Board, large property otters in the area and the gravel industry. Jentz said this planning process has been generally well- eceived. T Vie`` pointed out this plan has no affect on property 6ft, ers who may want to develop their land and choose not to arex into the city. Those owners would then work with Flathead County. If however they choose to annex into Kalispell this would be the guiding document. Jentz continued during the meetings and work sessions, staff received 3 comments: What happens around gravel pits? Jentz said the gravel industry will for all practical purposes not come into the city and cannot be forcibly annexed into the city. There would however be a buffer around the gravel pits which is described in the growth policy amendment. Secondly, an issue came up that we missed some of the gravel pits on our map which will be added into our inventory. And finally, the board received copies of a petition that indicates that if Rose Crossing is extended in the future it should not connect with Rhodes Draw through their subdivision. Jentz said therefore 2 amendments should be considered Kalispell City Planning Board Minutes of the meeting of February 10, 2009 Page 7 of 10 the board; to modify the Growth Policy Map by adding the known gravel pits and secondly to show the extension of Rose Crossing westerly to West Valley Drive as a solid line with an arrow pointing westerly to Farm to Market Road denoting the extension of Rose Crossing but not specifying a speck alignment. Staff recommends that the Kalispell City Planning Board and Zoning Commission take public comment, make any changes they feel appropriate and should, by resolution resolve to recommend the Kalispell West Growth Policy Amendment to the City Council for final action and adoption. BOARD DISCUSSION None. APPLICANT/CONSULTANT None. PUBLIC HEARING Harry Brown 589 Church Drive said- according to the description of the;amenL�ent it states that Church Drive will be the northers boux clary of the growth policy. However the boundary does`';ct follow Church Drive and in fact deviates, and goes right ::through his house and bisects the County? s Harvest View ` Subdivision. Jentz explained the location for the board and said it would be appropriate for the board'. to arncid the northern boundary to follow the exact route.of Church Iv`e. MOTION moved ..,and Hinchey seconded a motion to adopt Resolution KGPA ,09-01 and recommend that the Kalispell est.,,Growth Plicy Amendment be forward to the City Council: fox fugal action and adoption. BOARD DISCUSSION lixe. MOTION - GRAVEL PITS 8s ` Williamson moved and Hinchey seconded a motion to ROSE CROSSING:;;::. =::_' amend the Kalispell West Growth Policy Amendment Map to EXTENSION include all known gravel pits as of this date; and to change ' the future extension of Rose Crossing to shown as a solid line westerly to West Valley Drive and adding an arrow pointing west that indicates the actual alignment for extension beyond West Valley Drive is yet to be determined until development in the area occurs. ROLL CALL - GRAVEL PITS The motion passed unanimously on a roll call vote. MOTION - CHURCH DRIVE Hull moved and Hinchey seconded a motion to amend the BOUNDARY Kalispell West Growth Policy Amendment Map to follow the exact location of Church Drive for the northern boundary. BOARD DISCUSSION Schutt noted part of the reason they chose that boundary between West Valley Drive and Farm to Market Road is they Kalispell City Planning Board Minutes of the meeting of February 10, 2009 Page 8 of 10 were trying to avoid some of the issues they have had in the past where a road is built to County standards on one side of the road and to City standards including the road, curb, gutter, sidewalks, etc. when development occurs on the opposite side of the road. He added that is also the reason the west boundary was selected. Schutt asked the other board members if we are setting ourselves up for that same issue in the future. Jentz said this plan would not preclude the County side of a road from being developed as a City street. The growth policy map will not impact the..level the road is built to if development occurs along the,.od Jentz added the second reason why the boundary;;;:<<vvas chosen is it is also the boundary for the Kalispell Txaansportation Plan which was also the recommendatid by ti ;County Commissioners. In addition it is also the,.,boundary foeKalispell's Public Works Facilities Plan and the» Parks 8s Recreation Master Plan. However, Jentz felt this. amendment -*,"was appropriate and would clearly.,defihe the boundary. Hinchey felt the arrmdment was appropriate and Clark concurred. ROLL CALL - CHURCH The moixon passed on a roll :;mall vote of 5 in favor and 1 DRIVE BOUNDARY opposed. ROLL CALL - ORIGINAL The original �z�.btion, a*amended, passed unanimously on a MOTION ral call vote. , OLD BUSINESS: None NEW BUSINESS::: Gpnrad and.. Jentz reviewed the projects for the next planning board meeting for the board. Hull-'-,""' suggested that the pre-release center hearing be ._: scheduled first on the agenda and the other projects be scheduled to start at 8:00 p.m. Jentz agreed the center should be first on the agenda but added there is a community meeting regarding the center on February 26tn, at 7:00 p.m., located at 2282 US Highway 93 South (the proposed location of the facility). In addition, the business/property owners in this area have been contacted by the company to inform them of the facility and answer any questions, which has been very well -received. Jentz thought since the information on the center will have had a good deal of exposure before the public hearing it may not be necessary to schedule the other agenda items at 8:00 p.m. ADJOURNMENT The meeting adjourned at approximately 8:30 p.m. Kalispell City Planning Board Minutes of the meeting of February 10, 2009 Page 9 of 10 BNSF (CORE) Immediately following the regular meeting a work session REDEVELOPMENT PLAN was held on the following item: 1. BNSF (Core) Revitalization Plan NEXT MEETING A work session of the Kalispell City Planning Board and Zoning Commission is scheduled for February 24, 2009, at 7:00 p.m. in the Kalispell City Council Chambers located at 201 lst Avenue East in Kalispell. The tentative agenda will include: 1. An update on the status of the proposed Pre -Release Center. 2. Hockaday Museum of Arf","P p 3. Kalispell City Zoning.,otdinance Update. The next regular meeting o=)he Kalispell City Planning Board and Zoning4xririssions scheduled for Tuesday, March 10, 2009='`'at`` the Kalispell City Council Cham res located at 201`"t Avenue East in Kalispell. Bryan H. Schutt 1Ychelle:;Anderson President Rectldng Secretary APPROVED as submi / ;; / 09 Kalispell City Planning Board Minutes of the meeting of February 10, 2009 Page 10 of 10 rage i or i Michelle Anderson From: Joneva McCann Doneva@centurytel.net] Sent: Saturday, January 24, 2009 8:38 AM To: Planning Department Subject: Cornerstone Church Zone Change Gentlemen: We would be supportive of the proposed change to B-1 if it were to encompass the entire block. As the proposal now stands, the homes in the 500 block of Parkway Drive, East Side, will be the ONLY personal residences along a very long stretch of Highway 93. Prior development, including Hutton Ranch Plaza, north of this block has already made them undesirable as homes due to a very heavy (and loud) traffic load on Highway 93. My husband and I believe that either the entire block should be rezoned to B-1 or that none of it be rezoned. Commercial zoning of just a portion makes it very little sense and will make the remainder even less compatible with existing commercial development on the East side of Highway 93. Very truly yours, Joneva McCann 573 Parkway Drive 2/3/2009 Cornerstone Community Church REQUEST FOR ZONE CHANGE FROM R-3 TO B-1 STAFF REPORT #KZC-09-1 REQUEST FOR A PLANNED UNIT DEVELOPMENT STAFF REPORT #KPUD-08-3 KALISPELL PLANNING DEPARTMENT FEBRUARY 3, 2009 A report to the Kalispell City Planning Board and the Kalispell City Council regarding the request for a zone change and Planned Unit Development (PUD) on a property located on the west side of Highway 93 at the intersection of Highway 93 and Northridge Drive. A public hearing has been scheduled before the planning board for February 10, 2009, beginning at 7:00 PM in the Kalispell City Council Chambers. The planning board will forward a recommendation to the Kalispell City Council for final action. A. Petitioner and Owners: Cornerstone Community Church 1970 Highway 93 North Kalispell, MT 59901 (406) 752-4088 Technical Assistance: Thomas, Dean & Hoskins, Inc. 35 Three Mile Drive, Suite 101 Kalispell, MT 59901 (406) 751-5246 B. Nature of the Request: The Cornerstone Community Church has requested a zone change from R-3 (Urban Single Family Residential) to B-1 (Neighborhood Buffer District) on the eastern two-thirds of their property to accommodate a future bank. The request also includes a Planned Unit Development (PUD) overlay zoning district for the approximate 3 acre portion of the property requested to be rezoned to B-L The primary purpose of the PUD is to insure compatible development with the neighboring R-3 zoning to maintain neighborhood integrity. The property owner has requested several deviations as part of the PUD from the proposed B-1 zoning district. These deviations include reducing the side setback from 5 feet to zero, reducing the rear setback from 20 feet to 10 feet and permitting a bank which exceeds the maximum square footage and drive -through lanes under the B-1 zoning district. Currently, the B-1 zoning district permits drive -through facilities with no more than two driving lanes and no larger than 2000 square feet. The 2000 square feet refers to the size of the building typically associated with drive -through banking. The church is requesting a bank be permitted on an approximately one acre site located at the intersection of Highway 93 and Northridge Drive. The bank would have no more than four drive -through lanes instead of two and have an associated bank building with a footprint not to exceed 6000 square feet. The building itself will be two stories between 8,000 and 9,000 square feet. The planning board and council should also be aware that the planning department issued a waiver of preliminary plat letter to the church in July of 2008. The waiver letter provided the church preliminary approval to create a one acre lot at the intersection of Highway 93 and Northridge Drive to accommodate the bank and associated drive -through facility. The waiver of preliminary plat approval is subject to 12 conditions and city council's final approval. The waiver of preliminary plat does not have any bearing on the zone change and PUD request but is part of the larger development proposal of the project site. Location and Legal Description of Property: The property is located at the northwest corner of the intersection of Highway 93 and Northridge Drive and can be legally described as Lot 1A, Kalispell Addition No. 15A in Section 1, Township 28 North, Range 22 West, P.M.M., Flathead County, Montana. The property is approximately 3.94 acres in size. C. Existing Land Use and Zoning: The property is within the city limits, is zoned R-3, and has an existing church, Cornerstone Community Church, located on the northern portion of the property. The R-3, Urban Single Family Residential, zoning district is a residential district to provide lot areas for urban development. The minimum lot size in the R-3 zoning district is 7,000 square feet and all development in the district must be served by public utilities. D. Proposed Zoning: The B-1 zoning district allows certain commercial and professional office uses where such uses are compatible with the adjacent residential areas. The minimum lot size for the district is 7,000 square feet and the minimum lot width is 60 feet. Setbacks in the front are 20 feet; in the rear 20 feet; and on the sides 5 feet. The PUD zoning overlay district functions in concert with one or more of the underlying zones to provide a comprehensive, integrated development plan which w'iil se. Je to mod'uy +he underlying zone. Along witch the opt -on to modify the underlying zoning district the PUD is intended to preserve and enhance the integrity of the area. E. Adjacent Land Uses and Zoning: North: Single-family residential; R-3 zoning East: Commercial office and retail; Buffalo Commons PUD zoning South: Single-family residential and commercial; R-4 zoning West: Single-family residential; R-3 zoning F. General Land Use Character: The 3.9 acre project site is situated between Highway 93 on its eastern boundary and the Northridge Subdivision on its north and west boundary. This section of Highway 93 is predominately commercial businesses including restaurants, car wash, mortuary, a hotel and professional offices. Just north of the project site are six residential lots which back up Highway 93. The residential development ends before the intersection of Highway 93 and Four Mile Drive, 2 G. Utilities and Public Services: Sewer: City of Kalispell/On-site septic system Water: City of Kalispell Refuse: City of Kalispell Electricity: Flathead Electric Cooperative Gas: NorthWestern Energy Telephone: CenturyTel Schools: School District #5 Fire: Kalispell Fire Department Police: City of Kalispell EVALUATION BASED ON STATUTORY CRITERIA FOR INITIAL ZONING AND PROPOSED PUD OVERLAY The statutory basis for reviewing a change in zoning is set forth by 76-2-303, M.C.A. Findings of fact for the zone change request are discussed relative to the itemized criteria described by 76-2-304, M.C.A. and Section 27.30.020, Kalispell Zoning Ordinance. 1. Does the requested zone comply with the Kalispell Growth Policy? The eastern portion of the property is designated by the Kalispell Growth Policy 2020 as "Urban Mixed Use Area" which encourages the development of compact, centrally located services and employment areas that provide easy connections between existing commercial and residential neighborhoods. Section 7.d of chapter 4 of the growth policy also recommends creating a gradual transition into the residential neighborhoods by encouraging ml*-fuyotheriva«l,ooffices, aid compatible uses as a transition tool with sensitivity to compatible design. The Kalispell Zoning Ordinance, section 27.13.010, states the intent of the B-1 zoning district is to provide certain commercial and professional office uses where such uses are compatible with the adjacent residential areas. The B-1 district is intended to serve as a buffer between residential areas and other commercial districts. The B-1 zoning district is not intended for those businesses that require the outdoor display, sale and/or storage of merchandise, outdoor services or operations to accommodate large-scale commercial operations. The planned unit development (PUD) overlay zoning district is proposed to insure impacts to the neighboring residential development will be minimized. The PUD also provides assurance to the neighborhood that if major modifications are made to the land under the PUD zoning, additional city council approval is required. The following goal and policy in the Kalispell Growth Policy provide for the protection of the existing residential neighborhood that the PUD is intended to do: 3 Chapter 4, Goal 7 Maintain the integrity of well -established residential areas by avoiding the encroachment of incompatible uses. Chapter 4, Policy 7.e Avoid encroachment into established, intact residential areas. Based on the policies regarding Urban Mixed Use Areas in the Kalispell Growth Policy and the purpose of the B-1 zoning district and PUD overlay zoning, the B- 1 / PUD district is consistent with the growth policy and the current land use designation. The western portion of the project site is designated as Urban Residential. The current R-3 zoning for the property is consistent with this land use designation and is proposed to remain on the western portion of the property. 2. Is the requested zone designed to lessen congestion in the streets? The uses allowed under the proposed B-1 may potentially generate more traffic than those allowed under the existing R-3 zoning. However, with direct access onto Highway 93 and Highway 93 via Northridge Drive impacts to local streets to the west of the project site should be minimal. 3. Will the requested zone secure safety from fire, panic, and other dangers? Adequate access and public facilities are available to the site in the case of an emergency. There are no features related to the property which would compromise the safety of the public. New construction will be required to be in compliance with the building safety codes of the City which relate to fire and building safety. All municipal services including police and fire protection, water and sewer service is available to the property and will be utilized at the time another building is constructed on the project site. A. WU u` ie requested zone promote t ie health and general welfare? The requested zoning classification will promote the health and general welfare by restricting land uses to those which would be compatible with the adjoining properties. The B-1 zoning also provides a place for additional commercial uses in relatively close proximity to existing residential development in the community. 5. Will the requested zone provide for adequate light and air? Setback, height, and coverage standards for development occurring on this site are established in the Kalispell Zoning Ordinance to insure adequate light and air is provided. 6. Will the requested zone prevent the overcrowding of land? As previously noted, this area has been anticipated for mixed use development and since public water and sewer are available, the B-1 zoning designation is appropriate. The anticipated uses within the Urban Mixed Use designation in the E growth policy fall within those permitted and conditionally permitted in the proposed B-1 zoning designation. The PUD overlay zoning district requires site specific review of the project with major changes that would potentially increase the density of people on the property needing additional review by the planning department and city council. All public services and facilities will be available to serve this property. An overcrowding of land would occur if infrastructure were inadequate to accommodate the development in the area. This is not the case. 7. Will the requested zone avoid undue concentration of people? Minimum lot standards and use standards will avoid the undue concentration of people at the time the property is developed. 8. Will the requested zone facilitate the adequate provision of transportation, water, sewerage, schools, parks, and other public requirements? All public services and facilities are currently available or can be provided to the property. The Kalispell Growth Policy encourages new development in areas where these services are available especially water and sewer services. 9. Does the requested zone give consideration to the particular suitability of the property for particular uses? The land is fairly level and no creeks, water bodies, wetlands or steep slopes are located on the property. This surrounding area is developed with urban scale residential and commercial development. The proposed B-1 zoning district and uses planned under the PUD zoning are consistent with the existing and anticipated land uses in the area. The proposed B-1 zoning district is proposed on the eastern portion of the property with the existing R-3 zoning to be maintained between the proposed B-1 and existing residential development further west. The proposed B-1 zoning would serve as a buffer between the highway noise, typically seen as an incompatible use when it is immediately adjacent to residential development, and the established residential development to be west. 10. Does the requested zone give reasonable consideration to the character of the district? The general character of the area to the east and south is urban sized lots with commercial and professional office development. North and west of the project site are urban sized residential lots. The proposed zone change takes into account the commercial nature along Highway 93 with the B-1 zoning district. The property owners have recognized the residential development to the west of the site and have therefore maintained the R-3 zoning district along the project site's western boundary. 11. Will the proposed zone conserve the value of buildings? Value of the buildings in the .area will be conserved because the B-1 zoning will promote compatible and like uses on this property as are found on other properties in the area. 5 12. Will the requested zone encourage the most appropriate use of the land throughout the municipality? Urban scale commercial development should be encouraged in areas where services and facilities are available. The proposed zoning is consistent with the master plan and surrounding zoning in the area and will promote commercial development compatible with existing residential development in the area. EVALUATION OF THE PLANNED UNIT DEVELOPMENT PROPOSAL: Project Narrative: The project site is 3.9 acres in size and is currently developed with a church. The church requested to subdivide their property in July of 2008 and create an approximately one acre lot located at the corner of Northridge Drive and Highway 93. The intent of the subdivision was to create a future lot to build a bank or some other type of professional office. To construct a bank or professional office the church was informed that a zone change was needed from the current R-3 zoning of the property to a business zoning district. In July of 2008 the planning department waived the preliminary plat requirements for the subdivision on the church property. The preliminary plat waiver was subject to 12 conditions with final plat approval still needed from the city council. Knowing the church's intent of the subdivision the planning department included the following on the preliminary plat waiver letter: Based on an earlier conversation with you it is my understanding that the intent of the subdivision is to accommodate a future bank or other professional office on the one acre site at the intersection of Highway 93 and Northridge Drive. The current zoning on the property is R-3, Urban Single Family Residential, which does not permit banks or other professional offices. A future bank or prr fession al office may only obtain a building permit on the one acre site if a zone change is approved by the city council to a zoning district which permits or conditionally permits such uses. It is the planning department's recommendation that the church utilize an appropriate zoning district in concert with a planned unit development overlay to best insure compatible development to maintain neighborhood integrity. Although the bank is requesting several deviations from the requested B-1 zoning district the main purpose of the PUD request is to insure future development is compatible with the existing residential development and to maintain neighborhood integrity. In order to allow the future bank, as proposed, on the site the owners are requesting two deviations or relaxations from the Kalispell Zoning Ordinance. The relaxations are as follows: 1. Kalispell Zoning Ordinance, Section 27.13.040 (3) (Minimum side yard setback in the 13-1 zoning district) to allow a zero side yard setback. 2 2. Kalispell Zoning Ordinance, Section 27.13.020(7) (Permitted uses within the B-1 zoning district) to allow four drive -through lanes with an associated bank. The bank building footprint would be up to 6000 square feet with the total bank size between 8,000 and 9,000 square feet. The church is also requesting a deviation from the rear setback requirement in the B-1 zoning district to reduce the setback from 20 feet down to 10 feet. This is intended to bring the existing church structure into compliance as it is located within 20 feet of the property's rear setback. Review of Application Based Upon PUD Evaluation Criteria: The zoning regulations provide that the planning board and city council shall review the PUD application and plan based on the following criteria: 1. The compliance of the proposed PUD with the Kalispell Growth Policy The PUD site plan provides assurance to the neighborhood of the design and type of uses that would be built at the intersection of Highway 93 and Northridge Drive. If major modifications are made to the land under the PUD zoning, additional city council approval is required. The following goal and policy in the Kalispell Growth Policy provide for the protection of the existing residential neighborhood that the PUD is intended to do: Chapter 4, Goal 7 Maintain the integrity of well -established residential areas by avoiding the encroachment of incompatible uses. Chapter 4, Policy 7.e Avoid encroachment into established, intact residential areas. The PUD site plan includes a path connection from the existing church to the bike path along Highway 93. The proposed bank also provides a sidewalk connection to a future sidewalk to be constructed in conjunction with the bank along Northridge Drive. In addition, the proposed bank has been located to provide a significant landscape area between the bank and Highway 93. Landscaping and berming is also proposed along Highway 93 to shield parking associated with the church. The landscaping will complement existing landscaping across Highway 93 in the Buffalo Commons PUD. These proposed design elements in the PUD site plan comply with the following goal and policy: Chapter 8, Goal 2 Encourage design that is consistent with and contributes to the character of the area and that promotes safe and accessible pedestrian access and movement. Chapter 8, Policy 7 Encourage the design of new development to relate to significant features of the surrounding area and development of off street parking. 0 2. The extent to which the plan departs from the underlying zoning and the reasons why such departures are or are not deemed to be in the public interest and the mitigating conditions that the PUD provides to address the deviations As stated above the owners are requesting 3 relaxations in the zoning ordinance. Below are the 3 relaxations requested with planning staffs comments in italics. 1. Kalispell Zoning Ordinance, Section 27.13.040 (3) (Minimum side yard setback in the B-1 zoning district) to allow a zero side yard setback. The application states that the zero side yard setback is proposed to improve the drive -through aisle and provide adequate access to the drive -through along the north side of the bank structure. The setback is between the two proposed lots within the development and will have no detrimental effect on any adjoining properties. The application also notes that the zero setback also provides a more economic use of space and mass. The planning department agrees that a zero setback from an interior lot line within the development will not have any detrimental effect on adjoining properties. This deviation allows flexibility on the developers with regards to bank location. 2. Kalispell Zoning Ordinance, Section 27.13.020(7) (Permitted uses within the B- 1 zoning district) to allow four drive -through lanes with an associated bank. The bank building footprint would be up to 6000 square feet with the total bank size between 8,000 and 9,000 square feet. The application states that this departure is predicated on the existing adjacent PUD (Buffalo Commons) across the highway from this site. The application further points out that by developing the property as a PUD it guarantees neighboring residents of the area a clean two building layout plan will be constructed. Major changes to the plan are not permitted except with city council approval. During the planning board's January 27th work session on this project the owner's representative stated that although the PUD request would allow a larger bank building, development standards in the B-1 would allow multiple lots at 60 feet in width on the project site. On each of these lots a building, an office or retail building up to 3,000 square feet, could be constructed creating a small strip mall in excess of 9,000 square feet which can be found across the highway. The PUD, by permitting one 6,000 square foot building, will enhance the intersection because of an integrated design and landscaping plan and avoid an additional strip mall on the west side of the highway. The planning department would agree that by permitting this deviation to allow a larger bank and two additional drive -through facilities it will provide a single building at this prominent intersection. However, to be consistent with sign restrictions on surrounding PUD developments in the immediate area and along the Highway 93 North corridor the planning department recommends the following sign restrictions for the bank: RI • Freestanding signs for the bank are prohibited. • Bank signage shall be limited to wall signs on the north, south and west facing walls of the bank building. 3. Kalispell Zoning Ordinance, Section 27.13.040(3) (Rear yard setback of 20 feet) to allow a reduced rear yard setback from 20 feet to 10 feet. The church has requested this deviation to bring the existing church building on the property into compliance with its existing setback, at approximately 15 feet from the rear property boundary. The planning department is currently reviewing and updating the zoning ordinance for the entire city and intends to begin in-depth discussions on this update with the planning board in the coming months. One of the department's recommendations will be to reduce the rear yard setback for the B-1 zoning district from 20 feet down to 10 feet. The church had applied for a 15 foot setback and, if granted, may have limited the church's ability to expand or renovate the church in the future if the B-1 zoning district setback is reduced to 10 feet. Therefore, the church amended their application to request the 10 foot setback. The requested deviations are considered to be in the public's interest because it will provide additional infill commercial development which will not be detrimental to neighboring properties. Through the PUD process the residential neighborhood can be assured of what will be built at this prominent intersection. 3. The overall internal integrity of the PUD including the appropriate use of internal design elements, the use of buffers between different land uses, the use of transitions between uses of greater and lesser intensity, the use of enhanced design features to provide connectedness for both vehicle and pedestrian traffic throughout the PUD and the use of innovative and traditional design to foster more livable neighborhoods The proposed PUD provides abuild-out proposal for the eastern t7.7- thirds of *u e 3.9 acre project site which incorporates the existing Cornerstone Community Church. The PUD plan proposes landscaping and open space varying between 12 feet to over 60 feet along Highway 93. The plan also shows a green belt along the western boundary between the B-1 and R-3 zoning districts. The green belt varies between 8 feet and 15 feet and is proposed to be planted with evergreen trees. This greenbelt is required under Section 27.22.050 of the Kalispell Zoning Ordinance when a business or "B" zoning district has a common boundary with a residential or "R" district as is the case with the bank property. The greenbelt along the western boundary also serves to shield car headlights from the bank drive -through and parking lot which would otherwise shine west into the windows of neighboring homes. The PUD is self contained in that it does not connect to neighboring properties internally. This was encouraged because the planning department did not want additional business traffic using Parkway Drive as a means to access the future bank on the site. Vehicular traffic is now directed onto and off of Highway 93 and 9 Northridge Drive. The PUD plan provides for pedestrian connectivity to the adjacent bike/pedestrian path along Highway 93 by way of sidewalks and striping through the parking lot. A sidewalk is also proposed to the south and west of the bank. This sidewalk would serve the bank users and would connect to a future sidewalk along Northridge Drive to be constructed as part of a subdivision on the project site. The combination of increased landscaping along the highway and construction of sidewalks within and adjacent to the PUD project would add to the walkabilty of the eastern edge of the Northridge neighborhood. The future bank would provide a service for the immediate neighborhood as well as the larger community within a building that is not out of scale with similar commercial buildings in the immediate area. 4. The nature and extent of the public parks and common open space in the PUD, the reliability of the proposal for maintenance and conservation of these areas and the adequacy or inadequacy of the amount and function of the parks and open space in terms of the land use, densities and dwelling types proposed in the PUD As discussed above the PUD plan includes open space along Highway 93 and the western boundary of the proposed B-1 and existing R-3 zoning districts. Exhibit E provides cross sections of the parking lots with the associated landscaping. The open space along Highway 93 will include a combination of 3 to 4 foot high landscaped earth berm with trees planted approximately 30 feet on center. The zoning district boundary between the proposed B-1 and R-3 zoning districts includes a vegetative screen of evergreen trees of the arborvitae variety. The trees will be planted in a grid pattern within the open space. This vegetative screen will provide a visual buffer for residential homes to the west of the site and help to shield car headlights. For consistency with the existing landscape buffer across the highway from the project site the planning department is recommending the following additions be included in the final landscape plan: • Trees planted along Highway 93 shall be 30 feet on center and extend along buffer areas along the parking lot serving the church and the bank building. Tree placements would still need to meet site distance requirements. • The land between the right-in/right-out driveways along Highway 93 shall include grass sod with ultimate approval provided by the Montana Department of Transportation. • All maintenance of landscaping along Highway 93 and Northridge Drive shall include landscaping on the property and within the adjacent right-of- ways to the back of curb or edge of pavement. The maintenance provision in the proposed CC&R's includes maintaining landscaping out to the back of the curb. Planning staff is still recommending this maintenance provision be part of the PUD approval to insure future property 10 owners are aware of and comply with the landscaping maintenance in the adjacent right-of-way. The planning department also recommends the garbage enclosure along the western PUD site boundary include a fence or wall on three sides (north, south, and west) and the proposed evergreen trees planted to screen the west facing fence or wall. Section 27.26.030(6) of the Kalispell Zoning Ordinance requires a minimum of 5% of the total interior parking lot area be landscaped. The PUD site plan, Exhibit D, provides a breakdown of the square footage of paved surface and the square footage of landscaping. Exhibit D shows lot 1, the location of the existing church, will include a paved area of 29,895 square feet and 4,600 square feet of landscaping comprising 15% of the total paved area on the lot. Lot 2, the future bank location, will include 20,586 square feet of paved area with 4,200 square feet of landscaping comprising just over 20% of the paved area on lot 2. Therefore, under the proposed PUD plan each of the lots includes a landscaping plan which far exceeds the minimum amount required under the zoning ordinance. Exhibit K, Declaration of Covenants, Conditions and Restrictions (CC&.R's), for the project includes a maintenance provision for the landscaping and buffer areas of the PUD project site. Section 10 of Article VI of the CC&,R's states the maintenance of the landscaping extends from the property boundary to the back of curb. This provides a uniform appearance from the building or parking lot to the edge of the adjoining roadway and is consistent with the landscaping maintenance businesses due east of this site. The amount of open space and landscaping is adequate given the commercial nature of the site and lack of any residential development. With the recommended conditions from the planning staff for increases in landscaping the open space and landscaping would be adequate for the proposed uses on the property. 5. The manner in which the PUD plan makes adequate provision for public services, provides adequate control over vehicular traffic and furthers the amenities of recreation and visual enjoyment A. Public Services City water and sewer lines are located within the Northridge Drive right-of-way. The existing church is currently served by city water but uses an on -site septic system. The church may continue to use this system until it needs replacing. At that time county regulations may require the church to hook up to city sewer. The new bank building will hook up to both the water and sewer main lines along Northridge Drive. There are no storm sewer lines in the area of the project. The owners have proposed retaining stormwater on -site using a series of rain gardens. The rain gardens will include local species of drought resistant foliage. Prior to issuance of a building permit the developer will need to submit an overall stormwater plan for 11 the entire development to be reviewed and approved by the Public Works Department. B. Control over vehicular traffic The existing access points for the 3.9 acre tract of land include one driveway off of Northridge Drive and one driveway off of Highway 93. The driveway off of Highway 93 is unrestricted so that traffic may enter or exit crossing either north bound or south bound lanes. The proposed PUD site plan includes eliminating the existing driveway onto Highway 93 and replacing it with a designated right- in/right-out driveway further south, closer to the intersection of Highway 93 and Northridge Drive. The church has contacted the Montana Department of Transportation (MDT) and received a permit to install the right-in/right-out driveway at the location shown on the site plan. The driveway off of Northridge Drive will be widened to accommodate two-way traffic to serve both the church and future bank. During the planning board work session concerns were raised regarding the internal traffic flow on the site with respect to the four bank drive -through lanes. The bank had proposed a one-way access on the east side of the bank off of Northridge Drive to serve the drive - through lanes. This was removed from the site plan because of safety concerns with placing an access driveway so close to the intersection of Highway 93 and Northridge Drive. There should be limited traffic problems on the site however, since the church traffic will generally take place during evening or weekends when the bank is closed. The intersection of Highway 93 and Northridge Drive will experience some increase in traffic due to the bank locating there. However, MDT is expected to install left turn signals at the intersection to allow north bound traffic a protected left turn movement onto Northridge Drive. Northridge Drive will experience an increase in traffic but this will most likely occur within the first 200 feet of the intersection of Highway 93 and Northridge Drive as users of the bank enter and exit onto Northridge Drive. Parking will be shared between the bank and church properties. A total of 71 parking spaces are needed for the church based on a requirement of one parking space per 40 square feet in the main assembly area. The PUD site plan, Exhibit D, indicates the bank will need 19 parking spaces. Due to the off -hour times each of the buildings will use the bank and church are able to have a joint use of the parking lots on each of their properties. Section 27.26.040(4)(c) of the Kalispell Zoning Ordinance requires the following for joint use of a parking lot: The applicant shall show that there is no substantial conflict in the principal operating hours of the two buildings or uses for which joint use of off-street parking facilities is proposed; and 2. The applicant shall present to the Zoning Administrator a properly drawn legal instrument to be recorded with the County Clerk and Recorder, executed by the parties concerned for joint use of off-street parking facilities and approved as to form and manner of execution by the City Attorney; such instrument to be filed with the Zoning Administrator. 12 Because one of the buildings is a church there will not be a substantial conflict in operating hours with the bank. The second condition will be required to be recorded prior to issuance of a building permit for the bank. The proposed number of parking spaces are sufficient for both the church and the bank. However, if the church or bank were to ever expand or one or the other was to change its use, the number of off-street parking spaces may be an issue. This issue may limit or prohibit certain uses normally permitted under the B-1 zoning district. C. Visual enjoyment The existing church is not planning any major renovations to the building. The paved parking lot serving the church will include landscaping consisting of a berm, trees and grass. Elevations of the new bank building included with the application packet show the bank building with a pitched roof, large windows on the north and south elevations with half the east facing wall using windows to take advantage of the views. Stone will also be used for the outside construction of the building. In addition, the bank will have a landscape berm and large landscape area between the east facing wall of the bank building and Highway 93. Currently, the property is developed with the church and a parking lot. Grass makes up the remainder of the site. With development of the site the buildings and accompanying landscaping will help bring this site into the developed urban fabric of this area finishing the last undeveloped corner at the intersection of Highway 93 and Northridge Drive. D. Recreation The proposed PUD includes a church and future bank site. No residential development is included in the PUD request and therefore no parkland is required. The exiting church does have a small playground just north of the church building and a city park, Northridge Park, is located approximately 300 feet to the west. 6. The relationship, beneficial or adverse, of the PUD plan upon the neighborhood in which it is proposed to be established in concert with the underlying zone The proposed PUD in conjunction with a zone change to B-1 would permit a bank to locate on a one acre portion of the 3.9 acre property. The northern portion of the property is already developed with a church which has been there for several decades. Further development of the eastern portion of the lot will establish an office use with standard daytime operating hours and limited weekend hours at a busy intersection. Access to the site has been restricted to Highway 93 and Northridge Drive to reduce the potential for commercial related traffic to disrupt local residential streets in the area. Therefore, no substantial impacts to neighboring residential lots are anticipated. To help screen potentially incompatible uses the zoning ordinance requires a 13 greenbelt when a business "B" zoning district has a common boundary with a residential "R" zoning district. The zoning ordinance states that if a hedge is used as a screen instead of a fence the hedge shall obtain a height of at least six feet at maturity. The PUD site plan includes a dense planting of Emerald Green arborvitae along the majority of the boundary of the proposed B-1 and R-3 zoning district. Emerald Green arborvitae have a mature height of 8-12 feet. This will help screen the drive -through aisles and associated parking lot for the bank and church from neighboring residential development in accordance with the ordinance code. The majority of residences adjacent to the church already have some type of fence and the planning department is not recommending additional screening along this zoning boundary due to the residential nature churches generally have and the fact that the church has been at this location for several decades or more. As part of the PUD zoning the property owners are also requesting approximately 3 acres of their 3.9 acre property be rezoned from R-3 (Single Family Residential) to B-1 (Neighborhood Buffer District). If a portion of the property is rezoned to B- 1 the property will have two zoning districts on it, the new B-1 and the exiting R-3 along Parkway Drive. The Kalispell Zoning Ordinance, Section 27.22.100, states that uses for lots with two zoning districts defer to the least restricted zoning district. This least restrictive zoning district is then considered to extend over the entire lot. Here the B-1 zoning district would be the least restrictive and under this section would extend west over to Parkway Drive. The intent of the proposed PUD is to maintain the neighborhood integrity by restricting the use and scale of businesses built on the property. Allowing the B-1 to extend over to Parkway Drive defeats the purpose of the PUD, and the owner's intent on maintaining the R-3 zoning district on the western portion of the property. Therefore, planning staff is recommending a condition which would restrict the B-1 uses to just that portion of the property zoned B-1 to avoid encroachment of business uses on the land shown as remaining R-3 on Exhibit B of the application. 7. In the case of a plan which proposes development over a period of years, the sufficiency of the terms and conditions proposed to protect and maintain the integrity of the PUD The PUD application states that no phasing is planned for the project and a proposed final project completion date of December 2011 is anticipated. Even though the development is anticipated to be completed in two years planning staff is recommending a time frame, to coincide with the development of the property, be added as a condition of the PUD. The purpose for placing time frames on the PUD is to insure that there continues to be a viable project on the site and prohibits developers from sitting on land for several years to decades before starting their approved project. The time frame also provides the adjacent public assurance of what is anticipated on the site. The recommended time frame would be two years from the date of approval for the PUD with a possible one year extension to be granted by the city council. 14 Part of the requirements of PUD is that the developer would enter into an agreement with the City of Kalispell to adequately insure that the overall integrity of the development, the installation of required infrastructure, architectural integrity and proposed landscaping are accomplished as proposed. A recommended condition of approval for the PUD would require this agreement be in place prior to issuing a building permit for the bank. 8. Conformity with all applicable provisions of this chapter. No other specific deviations from the Kalispell Zoning Ordinance can be identified based upon the information submitted with the application other than those addressed in the beginning of this report. Staff recommends that the Kalispell City Planning Board and Zoning Commission adopt the findings in Staff Report #KZC-09-1 and recommend to the Kalispell City Council that the zoning for approximately 3 acres of the property be changed to B-1, Neighborhood Buffer District. Staff recommends that the Kalispell City Planning Board and Zoning Commission adopt staff report KPUD-08-3 as findings of fact and recommend to the Kalispell City Council that the PUD for Cornerstone Community Church be approved subject to the conditions listed below: General Conditions: 1. The Planned Unit Development for Cornerstone Community Church allows the following deviations from the Kalispell Zoning Ordinance: A. Kalispell Zoning Ordinance, Section 27.13.040 (3) (Minimum side yard setback in the B-1 zoning district) Allow a zero side yard setback. B. Kalispell Zoning Ordinance, Section 27.13.020(7) (Permitted uses within the B-1 zoning district) Allow four drive -through lanes with an associated bank of up to 9,000 square feet with a maximum footprint of 6,000 square feet. C. Kalispell Zoning Ordinance, Section 27.13.040(3) (Rear yard setback of 20 feet) Allow a reduced rear yard setback from 20 feet to 10 feet. 2. That the development of the site shall be in substantial compliance with the following plans, materials and other specifications as well as any additional conditions associated with the PUD as approved by the city council: • Exhibit B - Zoning Diagram 15 • Exhibit D - Site Plan • Exhibit E - Cross Sections • Exhibit G - Signage and Lighting Plan Note: Freestanding signs for the bank are prohibited. Bank signage shall be limited to wall signs on the north, south and west facing walls of the bank building. • Elevations for the bank 3. Prior to issuance of a building permit for the bank the developer shall submit a detailed landscape plan for the entire PUD site, with input from the Kalispell Architectural Review Committee, to the Parks and Recreation Department for review and approval. The plan shall include the following elements: • Trees planted along Highway 93 shall be 30 feet on center and extend along the buffer areas along the parking lot serving the church and the bank building. Tree placements would still need to meet site distance requirements. • The land between the right-in/right-out driveways along Highway 93 shall include grass sod. Note: The Montana Department of Transportation must approve any landscaping within its right-of-way. • The garbage enclosure along the western PUD site boundary shall include a fence or wall on three sides and evergreen trees shall be planted to screen the west facing fence or wall. • Evergreen trees along the western zoning boundary of B-1 shall be a minimum of three feet in height at the time of planting. The approved landscaping plan shall be installed prior to issuance of a certificate of occupancy for the bank building. 4. All maintenance of landscaping along Highway 93 and Northridge Drive shall include landscaping on the property and within the adjacent right-of-ways to the back of curb or edge of pavement. 5. Prior to issuance of a building permit the developer shall submit an overall stormwater report which meets current city standards for the entire PUD development. The report shall be reviewed and approved by the Public Works Department. The approved report shall be installed prior to issuance of a certificate of occupancy for the bank. 6. Prior to any excavation or earthwork, a City Stormwater Management Permit shall be approved and issued from the Kalispell Public Works Department. In accordance with Ordinance 1600, the permit shall include a permit application, site map, narrative describing the best management practices to be used and a completed checklist. In addition to the City Stormwater Management Permit the developer shall submit a copy of the State General Construction Stormwater Discharge Permit Notice of Intent (NOI) and Stormwater Pollution Prevention Plan (SWPPP). At the time of final plat, the project engineer shall certify that the development is in compliance with the approved City Stormwater Management Permit. 16 7. Prior to issuance of a building permit the applicant shall provide the planning department with a properly drawn legal instrument to be recorded with the County Clerk and Recorder, executed by the parties concerned for joint use of off- street parking facilities and approved as to form and manner of execution by the City Attorney. 8. Permitted and conditional uses within the B-1 zoning district shall be restricted to that portion of the property zoned B-1 to avoid encroachment of business uses on the land shown as remaining R-3 on Exhibit B of the application. 9. A development agreement shall be drafted by the Kalispell City Attorney between the City of Kalispell and the developer outlining and formalizing the terms, conditions and provisions of approval. The final plan as approved, together with the conditions and restrictions imposed, shall constitute the Planned Unit Development (PUD) zoning for the site. The development agreement shall be submitted with the building permit for the bank. 10. Approval of the planned unit development (PUD) shall be valid for a period of two years from the date of approval with the possibility of a one-year extension to be granted by the city council. Within this time, the developers shall obtain the necessary permits and approvals to complete the improvements as shown on the approved PUD site plan. 17 PLANNING FOR THE FUTURE February 24, 2009 Myrt Webb, Interim City Manager City of Kalispell P.O. Box 1997 Kalispell, MT 59903 Manning Department 201 1st Avenue East Kalispell, MT 59901 Phone: (406) 758-7940 Fax: (406) 758-7739 www.kalispell.com/plannin2 Re: Cornerstone Community Church zone change and planned unit development (PUD) zoning overlay request Dear Myrt: The Kalispell City Planning Board met on February 10, 2009 and held a public hearing to consider a request by the Cornerstone Community Church to rezone a portion of their 3.9 acre property located at the northwest corner of the intersection of Northridge Drive and Highway 93. The zone change includes changing the zoning on approximately 3 acres from R-3 (Urban Single Family Residential) to B-1 (Neighborhood Buffer District) to accommodate the location of a new bank. The remaining 0.9 acre of land owned by the church along Parkway Drive will remain R-3. The church is also requesting a planned unit development (PUD) overlay zoning district on the proposed B-1 portion of the property. The PUD request would permit a zero side yard building setback to accommodate a drive - through facility for the bank. The PUD also requests a bank and drive -through facility of up to 6,000 square feet and four drive -through lanes. The B-1 zone permits drive -through facilities with no more than two lanes and an associated bank of no more than 2,000 square feet in size. The final request in the PUD application is to reduce the rear yard setback for the B-1 from 20 feet down to 10 feet. The property is approximately 3.9 acres in size and can be legally described as lot IA, Kalispell Addition No. 15A located within Section 1, Township 28 North, Range 22 West P.M.M, Flathead County, Montana. Sean Conrad of the Kalispell Planning Department presented staff reports #KZC-09-01 and KPUD-08-03 evaluating the proposed project. Staff recommended the planning board recommend approving the zone change and planned unit development overlay zoning subject to the conditions listed in the staff report. During the public hearing portion of the meeting the pastor of the Cornerstone Community Church and their engineer, Doug Kauffman, of Thomas, Dean and Hoskins spoke in favor of the project. David Mitchell, of CTA Architects Engineers, representing Valley Bank also spoke in favor of the project. One neighboring property owner, Joel Hausen, spoke about his concerns with left turns at the intersection of Highway 93 and Northridge Drive. During the public hearing portion of the project some planning board members had concerns with the number of future parking spaces shown along the east side of the project site. With a narrow greenbelt in front of the parking area along the highway some planning board members were concerned about the visual affect a line of parked cars would have. Adjacent development across the highway was cited as it has a larger berm and landscaped area to buffer the parked cars from the highway. After hearing further testimony from the applicant the public hearing was closed. Further board discussion regarding the issue of parking along the eastern side of the project site took place. Additional landscaping was difficult to achieve on this site due to the existing church on the property and the need to provide adequate on -site parking. The planning board recommended adding condition # 11 that would prohibit bank parking in the easterly parking area, along Highway 93. In addition signage is required that reads "Church Parking Only". The planning board members believe this would limit the excess parking along the highway during most of the week with the parking spaces used only during church functions and services. The recommended condition passed on a vote of 4- 2. The planning board then approved the main motion recommending approval of both the zone change and planned unit development subject to staffs conditions as amended. This motion passed on a vote of 5-1. Please schedule this matter for the March 2, 2009 regular city council meeting. You may contact this board or Sean Conrad at the Kalispell Planning Department if you have any questions regarding this matter. Sincerely, Kalispell City Planning Board Bryan H. Schutt President Attachments: Staff report #KZC-09-01 and KPUD-08-03 with application materials Draft minutes of the 2/ 10/09 planning board meeting Exhibit A - the planning board's recommended conditions of approval c w/ Att: Theresa White, Kalispell City Clerk c w/o Att: Cornerstone Community Church 1970 Highway 93 North Kalispell, MT 59901 Thomas, Dean & Hoskins, Inc. 35 Three Mile Drive, Suite 101 Kalispell, MT 59901 EXHIBIT A CONDITIONS OF APPROVAL FOR THE CORNERSTONE COMMUNITY CHURCH PUD RECOMMENDED BY THE KALISPELL PLANNING BOARD FEBRUARY 10, 2009 CONDITIONS OF APPROVAL General Conditions: The Planned Unit Development for Cornerstone Community Church allows the following deviations from the Kalispell Zoning Ordinance: A. Kalispell Zoning Ordinance, Section 27.13.040 (3) (Minimum side yard setback in the B-1 zoning district) Allow a zero side yard setback. B. Kalispell Zoning Ordinance, Section 27.13.020(7) (Permitted uses within the B-1 zoning district) Allow four drive -through lanes with an associated bank of up to 9,000 square feet with a maximum footprint of 6,000 square feet. C. Kalispell Zoning Ordinance, Section 27.13.040(3) (Rear yard setback of 20 feet) Allow a reduced rear yard setback from 20 feet to 10 feet. 2. That the development of the site shall be in substantial compliance with the following plans, materials and other specifications as well as any additional conditions associated with the PUD as approved by the city council: • Exhibit B - Zoning Diagram • Exhibit D - Site Plan • Exhibit E - Cross Sections • Exhibit G - Signage and Lighting Plan Note: Freestanding signs for the bank are prohibited. Bank signage shall be limited to wall signs on the north, south and west facing walls of the bank building. • Elevations for the bank 3. Prior to issuance of a building permit for the bank the developer shall submit a detailed landscape plan for the entire PUD site, with input from the Kalispell Architectural Review Committee, to the Parks and Recreation Department for review and approval. The plan shall include the following elements: • Trees planted along Highway 93 shall be 30 feet on center and extend along the buffer areas along the parking lot serving the church and the bank building. Tree placements would still need to meet site distance requirements. • The land between the right-in/right-out driveways along Highway 93 shall include grass sod. Note: The Montana Department of Transportation must approve any landscaping within its right-of-way. • The garbage enclosure along the western PUD site boundary shall include a fence or wall on three sides and evergreen trees shall be planted to screen the west facing fence or wall. • Evergreen trees along the western zoning boundary of B-1 shall be a minimum of three feet in height at the time of planting. The approved landscaping plan shall be installed prior to issuance of a certificate of occupancy for the bank building. 4. All maintenance of landscaping along Highway 93 and Northridge Drive shall include landscaping on the property and within the adjacent right-of-ways to the back of curb or edge of pavement. 5. Prior to issuance of a building permit the developer shall submit an overall stormwater report which meets current city standards for the entire PUD development. The report shall be reviewed and approved by the Public Works Department. The approved report shall be installed prior to issuance of a certificate of occupancy for the bank. 6. Prior to any excavation or earthwork, a City Stormwater Management Permit shall be approved and issued from the Kalispell Public Works Department. In accordance with Ordinance 1600, the permit shall include a permit application, site map, narrative describing the best management practices to be used and a completed checklist. In addition to the City Stormwater Management Permit the developer shall submit a copy of the State General Construction Stormwater Discharge Permit Notice of Intent (NOI) and Stormwater Pollution Prevention Plan (SWPPP). At the time of final plat, the project engineer shall certify that the development is in compliance with the approved City Stormwater Management Permit. 7. Prior to issuance of a building permit the applicant shall provide the planning department with a properly drawn legal instrument to be recorded with the County Clerk and Recorder, executed by the parties concerned for joint use of off-street parking facilities and approved as to form and manner of execution by the City Attorney. 8. Permitted and conditional uses within the B-1 zoning district shall be restricted to that portion of the property zoned B-1 to avoid encroachment of business uses on the land shown as remaining R-3 on Exhibit B of the application. 9. A development agreement shall be drafted by the Kalispell City Attorney between the City of Kalispell and the developer outlining and formalizing the terms, conditions and provisions of approval. The final plan as approved, together with the conditions and restrictions imposed, shall constitute the Planned Unit Development (PUD) zoning for the site. The development agreement shall be submitted with the building permit for the bank. 10. Approval of the planned unit development (PUD) shall be valid for a period of two years from the date of approval with the possibility of a one-year extension to be granted by the city council. Within this time, the developers shall obtain the necessary permits and approvals to complete the improvements as shown on the approved PUD site plan. 11. The 25 parking spaces, along Highway 93, between the highway and church shall be signed "Church Parking Only" to prohibited bank parking on these spaces. The "Church Parking Only" signs shall be installed prior to the issuance of a certificate of occupancy for the bank. The number of signs, their size and location shall be reviewed and approved by the planning department prior to installation. rage i or i Michelle Anderson From: Joneva McCann Doneva@centurytel.net] Sent: Saturday, January 24, 2009 8:38 AM To: Planning Department Subject: Cornerstone Church Zone Change Gentlemen: We would be supportive of the proposed change to B-1 if it were to encompass the entire block. As the proposal now stands, the homes in the 500 block of Parkway Drive, East Side, will be the ONLY personal residences along a very long stretch of Highway 93. Prior development, including Hutton Ranch Plaza, north of this block has already made them undesirable as homes due to a very heavy (and loud) traffic load on Highway 93. My husband and I believe that either the entire block should be rezoned to B-1 or that none of it be rezoned. Commercial zoning of just a portion makes it very little sense and will make the remainder even less compatible with existing commercial development on the East side of Highway 93. Very truly yours, Joneva McCann 573 Parkway Drive 2/3/2009 PLANNING FOR THE FUTURE OW"A Planning Department 201 1st Avenue East Kalispell, MT 59901 Phone: (406) 758-7940 Fax: (406) 758-7739 www.kalispell.com/planning APPLICATION FOR PLANNED UNIT DEVELOPMENT (PUD) PROJECT NAME Cornerstone Community Church Subdivision 1. NAME OF APPLICANT: Cornerstone Community Church 2. MAIL ADDRESS: 1970 US Hwy 93 N. 3. CITY/STATE/ZIP: Kalispell, MT 59901 PHONE: 406-752-4088 NAME AND ADDRESS OF OWNER IF DIFFERENT THAN APPLICANT: 4. NAME: 5. MAIL ADDRESS: 6. CITY/STATE/ZIP: PHONE: 7. TECHNICAL ASSISTANCE: 8. MAIL ADDRESS: 9. CITY/STATE/ZIP: PHONE: If there are others who should be notified during the review process, please list those. Thomas, Dean & Hoskins, Inc., 35 Three Mile Dr., Ste.101, Kalispell, MT 59901 Check One: x Initial PUD proposal Amendment to an existing PUD Property Address: 1970 US Hwy 93 N. Total Area of Property: 3.011 Acres Legal description including section, township & range: Lot 1A, Kalispell Addition No. 15A, SEC 1, T28N, R22W, P.M.M. D. The present zoning of the above property is: R-3 E. Please provide the following information in a narrative format with supporting drawings or other format as needed: 1 a. An overall description of the goals and objectives for the development of the project. b. In cases where the development will be executed in increments, a schedule showing the time within phase will be completed. C. The extent to which the plan departs from zoning and subdivision regulations including but not limited to density, setbacks and use, and the reasons why such departures are or are not deemed to be in the public interest; d. The nature and extent of the common open space in the project and the provisions for maintenance and conservation of the common open space; and the adequacy of the amount and function of the open space in terms of the land use, densities and dwelling types proposed in the plan; e. The manner in which services will be provided such as water, sewer, storm water management, schools, roads, traffic management, pedestrian access, recreational facilities and other applicable services and utilities. f. The relationship, beneficial or adverse, of the planned development project upon the neighborhood in which it is proposed to be established g. How the plan provides reasonable consideration to the character of the neighborhood and the peculiar suitability of the property for the proposed use. h. Where there are more intensive uses or incompatible uses planned within the project or on the project boundaries, how with the impacts of those uses be mitigated. i. How the development plan will further the goals, policies and objectives of the Kalispell Growth Policy. j. Include site plans, drawings and schematics with supporting narratives where needed that includes the following information: (1). Total acreage and present zoning classifications; (2). Zoning classification of all adjoining properties; (3). Density in dwelling units per gross acre; (4). Location, size height and number of stories for buildings and uses proposed for buildings; (5). Layout and dimensions of streets, parking areas, pedestrian walkways and surfacing; (6). Vehicle, emergency and pedestrian access, traffic circulation and control; (7). Location, size, height, color and materials of signs; (8). Location and height of fencing and/or screening; 2 (9). Location and type of landscaping; (10). Location and type of open space and common areas; (11). Proposed maintenance of common areas and open space; (12). Property boundary locations and setback lines (13). Special design standards, materials and / or colors; (14). Proposed schedule of completions and phasing of the development, if applicable; (15). Covenants, conditions and restrictions; (16). Any other information that may be deemed relevant and appropriate to allow for adequate review. If the PUD involves the division of land for the purpose of conveyance, a preliminary plat shall be prepared in accordance with the requirements of the subdivision regulations. Please note that the approved final plan, together with the conditions and restrictions imposed, shall constitute the zoning for the district. No building permit shall be issued for any structure within the district unless such structure conforms to the provisions of the approved plan. The signing of this application signifies that the aforementioned information is true and correct and grants approval for Kalispell Planning staff to be present on the property for routine monitoring and inspection during review process. (Applicant Signature) (Date) 3 APPLICATION PROCESS APPLICABLE TO ALL ZONING APPLICATIONS: A. L C. Pre -Application Meeting: A discussion with the planning director or designated member of staff must precede filing of this application. Among topics to be discussed are: Master Plan or Growth Policy compatibility with the application, compatibility of proposed zone change with surrounding zoning classifications, and the application procedure. Completed application form. Application fee per schedule, made payable to the Kalispell Planning Department. PUD / CONCEPT PUD Zoning Review Fee Residential (no subdivision) $1,000 + $125/unit Commercial (no subdivision) $1,200 + $100/acre Residential (with subdivision) $1,000 + $100/acre Commercial (with subdivision) $1,000 + $100 / acre A bona fide legal description of the subject property and a map showing the location and boundaries of the property. E. A list of the names and mailing addresses of all property owners within 150 feet of the subject property as shown on the Assessor's roll. Public streets and right of ways are not included in the 150 feet. See example below and attached notice from County Plat Room. Assessor No Sec-Twn-Rng Lot/Tract No Property Owner & Mailing Address Please consult the with staff of the Kalispell Planning Office for submittal dates and dates for the planning board meeting at which it will be heard in order that requirements of state statutes and the zoning regulations may be fulfilled. The application must be accepted as complete forty-five (45) days prior to the scheduled planning board meeting. M O� Tk7E 9T s l CLA. ,-rUU , 06-5840 May 13, 2008 Flathead County GIS 800 South Main Street Kalispell, MT 59901 Phone (406) 758-5540 To: Whom it may concern From: Mindy Cochran, GIS Program Manager Subject: Adjacent Property Ownership List To obtain a certified list of property ownership, please have the appropriate agency fill out the attached form and submit it to the Flathead County GIS Department at 800 South Main Street, located on the third floor of the old Courthouse. The search fee is $75.00 and is due at the time of request to the GIS Department. Please make checks payable to Flathead County. Your certified list will be ready one week from the date ordered. Rush orders will be accepted at the rate of $150.00 per list. For orders requested by the Flathead County Planning and Zoning Department, the completed list will be sent directly to the Planning Office. Otherwise, customers may pick up the certified list in the GIS Department. Please note that the Planning Offices also accept ownership lists searched and certified by a local title company. 5 ADJACENT OWNERSHIP LIST REQUEST FORM TO BE FILLED OUT BY THE PLANNING OFFICE, SURVEYOR OR ENGINEER SUBJECT PROPERTY OWNER SUBJECT PROPERTY ASSESSOR # SUBJECT PROPERTY LEGAL DESCRIPTION SEC -TOWNSHIP -RANGE BUFFER FOOTAGE CONTACT PERSON PHONE # BILLING ADDRESS TODAYS DATE PICKUP DATE SUBCODE * PLANNER,SURVEYOR OR ENGINEER Fields marked with an * are required. Incomplete forms will not be accepted. Allow 1 week from receipt by GIS office. Order forms can be submitted in the GIS office, or by fax or email. Fax number: 406-758-5840 Email address: gis_ownership@flathead.mt.gov Certified Ownership List - (Includes Paper Copy and Vicinity Map) $75.00 Certified Ownership List - Rush order - 24 to 48 hours $150.00 6 OMdOI NOISIM31 AON M IV380 Z Y m in ° ° 'I o S3wvaNf108 03SOdONd aNd SN b' 1136110—WrOZ08—STNJ S,LNVITISN03 9NIIN31NIION13 � Y 63KI `SNINSOH 7y KvjQ `SvI�OHl Y d 1181HX3 }W i o u o Z z . a m �j3s3a 3iv(l AS `dNd1NOW 113dSI7 iJoS3a 31d4 AS a y a m 2iOS30 31da A8 ° HoNnHa AlINnwW03 3M SNOISIAEd �W=aoW ° ° a ° -; M i NORTHRIDGE RIVE _ _ _ — W S_871-�34"WI 3 / _.�• �3� 110.0' I J, s o N82 I I , l eta m I i 22f,04 1 _----- / I. �. w It 7.�r �i / / / It L II i i l i i I• I { / / / i I I iI I i 41 I 3'hN 234.71 � � ��,; j j ► �; plll '�/ dam_ ; �6 I I III I ACCESS- & UTILCfY F-ASE II Q /C4 %00 �V j II I j I N. I III v Q j11 I i � I Ill III I/ v / I {I) � l 1► I I I I I/ / a� D lii�iil i I i o� LU iiil=� I II I I I I I (DC� I 1 • i I I i I 1 �� I � ZD ��-� � �/ / `d9 l �' I ►� ;� w -/ ,I If 1 & I I 1 11 A\ I I A 3�, / I �I IL Z Z 0Md01 NoVAOdS b' Z Y o inWdb Jb10 `� N I N� NOlJNIHSb'M 3NMIOdS A0YV ll3dSlWA-NVI43Z08-SllVJ IV380 oN'� OD SINV TISN0a 9NIHMNIMU �QZ Y 63KI `SI�I�ISOH 7y KvjQ `svwoHl Y 81181HX3 }W �J3s3a 3iv(l AS i o u o �JoS3a 31d4 Aa CO z a m `dNd1NOW 113dSI7 2iOS30 31da A8 a y a m �W oW ° HoNnHO AlINf1WW0O 3M =a SNOISIAEd o o co LL 0 04 O t , W THRIDGE DRIVE -- — W NOR Q U M N U N w , o > — ` I► LLJ .' 1 w -► I It 11 ► LO i 1 1 NI o of ', I I ml I 1 �I o~ ► I QI rn dC) I W 1. 1. w N z � F z o a I 1 11 & W o I 111U. I N W cam= U I 1 I 1 r cn c , `I II a I I I 0 cn Z I I I o` 0 0 U in / • I � z N Z 0 uo co uo Q I 1 LL 0o I w I w ► J' QI W Z� > U� Ij I w� II I co 0 0 / OMd01 NOVAOdS N010NIHSb'M 3NMIOdS Z Y insnn3ln b'M AON ll3dSlIO—WrGZ08—STWJ IV380 oN'� o SINIVITISNoa 9NIHMNIi�u3 �QZ o Y ODNI `SNINSOH 7y KvjQ `SvI�OHl Y 1181HX3 }W �j3s3a 3ivcl AS i o u o a m `dNd1NOW 113dSl7 �JoS3a 31d4 Aa Z Z a y a m 2iOS30 31da A8 ° = W HoNnH3 AlINnwW03 3N1 SNOISIAEd w O Q o o a o-; a U w I 00 w W;, G w w_ w w w w OHVOI NOISIM31 NOIONIHSVM 3NVAOdS in Z Y O N o 'o'I co NbId 311S b'N AON ll36110—WrOZ08—SINJ IV380 SILNIVITISNoa 9NIHMNIMu3 �QZ Y 63KI `SNINSOH 7y KviQ `SvI�OH,L Y a 1181HX3 }W �M�Icl 31b'4 AS i o u o Z z a m `dNd1NOW 113dSI7 �JoS3a 31d1J AS a y a m 2iOS30 31da A8 ° =ao HoNnHO AIINnwW0� 3N1 SNOISIAEd �W W o o a o-; M rn 2 0 W r) z D MIDGE DRIVE w 1 3 �I IJJ z 9 Lu 0E- U do N 5 Of F- pop W U a � �L a � Tm N ^ m moor wC, m m m T �m m �2a m T �� -• T m C 00 T m ®® 3: T o4V W) � 3 5 DES o I Z� �o V! v� 1 ' I 1 I 1 , 1 � 1 I� 1 -mop °0 t o 1 1 Q W ! Irwn I �g 1 owa NOID NOISIM31 N419NIHStlM 3Md)10dS Z Y ' " c a' N R AOf11S Ni�I1�3S SSCi�I� ' b'Ntl1NOW ll3dSlltl)I-NWV3Z08-Slltld 1`d3aJ B N Y SINVII II1SN00 DKIH33KIDN71 ��� N "JKI `SNIXSUH 7' NV3(1`s� wollZ Y 3 lIgIHX3 >W NOS30 31d0 A9 m °w r p o VNd1NOW 113dSI7 bos�a JIVa Au z z � m a 4 m ° ��s�a 31VQ Ike HomnH3 AlINnwwoo 3N1 SNOISIAD8 o 0 0 o U. O O N — RIW 2 OC 0 z M �2 A D Q Tf J J Z � Q Z a � U LU � Of N w r-, RIW C 0 0 6 (0 r 3�in ON 0 0 0 M co (') iondis I USIX3 I i I I I I > I I i I I i 5 1 I I 1 I � 1 o , wc I I I I I 0 Z M OHVO N010NIHSVM 3NVNOdS VOID NNVAOdS ¢ c c o ❑ J V J Wb�IJdla ��^ VW.LNOW ll3dSlIO-NVW3Z08-S7lVd lV380 B o Y SINNITISNOi 91,MWIDu3 *JtQ `SNIMSOH T �VAQ `SVIVOH.L u 1191HX3 >.W m = Y } °w } 0 z o m KSK 31'd4 AS VNVINOW `113dSI7 dosK 3ivG ka z t a w ° �Os3a 31d4 Alalz < < m HounHO AlINnwW03 3N1 SNOISIA36 W o 0 v o -, U. co rn Q cD 0 w Q 0 w z NORTHROGE DRNE P x W r) W CD 0 ry 2 O Z O a) 2 I OHVO N010NIHSVM 3NVNOdS VOID NNOOdS a ' o o c o Nd�d JNIlHJI� aN�d VW.LNOW ll3dS11O-NM3ZO8-S1lVd lIV380 B a�'� o SIKVI I[ISNOj 9XIMNION3 '� Q� Y *JtQ `SN1MSOH T �VAQ `SVIVOH.L Y 01181HX3 >.W dos3a 3ivo AS } o u o z z o m c `dNViNOW 113dSI7 dosK 3ivG As a w a ° 2ios3(J 31d4 A13 0 HounHO A1INnwW03 3N1 sNOISIA36 o 0 00 o ° LL w m a` w a � 1i•I m sips. H d 3 • �T� o, � W Y \ _ _ 3 o �Som N •1 111` � -- � Z 1. < 0 W Z�I r O 1 1 U W 1 1 W !� ��✓'fir .r••r � I i i i d I xv W , � I � I v ,, F':I ri::"•a i I r m m my m m '•,� m ,O / �,.�.:°..d,•'1 ••1' ! a� � = T mm m m mm m � m m / / • •. m m T m m m ', m m `• t�;.::.:.°' �/ m�=.sit ® m m m m Soo goo �m �.:..`• I I I e W m m I x O m m >; I m ®® woo I I I oil �f O W li m r` m O Zm / It It 1 1 1 1 — 'low ® ��' - � m o � � a U 0 O N NDRTHRIDGE DRNE In rn 0 0W 05 w ��W _ OZ OHV01 NOlSIM31 NOIDNIHSVM 3NVNOdS Z = o N o o N S3�AlS �`dllN3al VNVINOW ll3dSllV>i—NVW3Z08—SllV3 1V3aJ B c Y ssKVsrinMI sNoj 9NIUNION3 �� ODNI `SNINSOH 7y NvlQ `SvI�OH,L Y H 1191HX3 >.W dos3a 3ivo AS } o u o z z o m c `dNViNOW ll3dSI7 2JOSK 3ivo Ae a w a ° doS3a 31d4 As < 0 HoNnHO AIINnwW0O 3Ni SNOISIA36 0 0 00 o ° LL OHVO VOID NW>IOdS Z Y 2i041� NIb�W N�d1d 2100 NOlJNIHSVM 3N'�MOdS o o N 4 VNb1NOW ll3dSllV>i-NbW3Z08-SIIVA lb3aJ B c Y sixyslinsNoi 9NIUMINION3 r 11181 HX3 63KI `SNINSOH 7y NvlQ `SvwOHi } W dos31J 3iva AS } o u o c 2JOSK 3iva Ae z z o m `dNViNOW ll3dSI7 doS3a 31d4 A13 a w a < 0 ° HoNnHO AlINnwW03 3M SNOISIA36 o 0 00 o ° LL �n o w = J U Q 0 U N n N UJ I W 1 I IL --------------------------I Li II I g N W O a 0 I, _ I I � U LL I� j I Ji I U) W I � I _J IL--------- �_-___� I II I LL II I II I 1 0) W II ` 1 I I': I I r I I W "Im O I x O NN I I I � � � Ij < j I -H I II I I II I I 11 I IL --------------------------I I 1j I I II I I II 1 1 II I �N/ I I O v! I 1 Q I I II I II I 11 I I II I I I I II 1 I II -----------, II I--------= --------------�I IL - - - - - - - - - - - - - - - - - - - - I `----- ,, Ir------ - - - - - - I I I I I I W LL LL I I i�11 li O I I I II I I I II II I I I _1L �L------------------------ ----J1------------- L--------------------------------- ---------, r--------- I II I I I I 1 II rn o N C O C LpuBJauuaN rn 0 N C O C 0 0 L L cu LIOuBJa uuaN 0 L13uB+a uuaN