1.4 Introduction
The purpose of this report is to analyze the City of Kalispell's water distribution
system and its ability to meet future domestic and fire flow demands in the
proposed Starling development.
The Aspen Group, doing business as Stillwater Meadows, LLC is proposing to
develop approximately 640 acres in Section 35. Specifically, the project is
bounded by West Reserve Drive to the north, Four Mile Road to the south,
Spring Creek Road to the west, and Stillwater Road to the east. A vicinity map is
shown in Figure VM-1 and a water main layout is shown in Figure 1-1.
The overall development plan will consist of up to approximately 3,000 dwelling
units constructed in a minimum of 14 phases. The land uses offered will vary
from single family homes, multi -family paired homes, condominiums, townhomes,
mixed use commercial including professional office and a parcel identified for a
new elementary or junior high school. The number and types of housing units
constructed will be determined by market conditions at the time each phase
develops.
2.0 Existing Conditions
Water for domestic use and fire protection will be provided by an extension of the
City of Kalispell's water distribution system. Starling will connect to an existing
14-inch main that is located at the corner of Stillwater Road and W. Reserve
Drive. There is also a proposed development south of Starling in Section 2
called Fox Trotter. The Developer of Fox Trotter are proposing to extend the City
of Kalispell's water main to serve their project. As Starling develops into future
phases, they will have the option to eventually connect to that proposed 14-inch
main.
11
STARLING WATER DISTRIBUTION SYSTEM ANALYSIS
3.0 Estimated Domestic and Fire Flow Demands
For planning purposes, water demands from the proposed development were
based on the following assumptions:
• Residential Demand = 145 gpd/capita
• Maximum Day to Average Day Peaking Factor = 2.7
• Peak Hourly to Average Day Peaking Factor = 4.0
• Population density = 2.41 residents per unit
These figures are taken from the Kalispell Water, Sewer and Storm Drainage
Facility Plan, 2000. Starling will have up to 3000 units and that is the value used
for the water demand calculations:
• 350 gpd/unit
• Average Daily Flow = 730 gpm
• Maximum Daily Flow = 2,000 gpm
• Peak Hourly Flow = 2,900 gpm
Fire flows for the subdivision are estimated with the City of Kalispell Water,
Sewer, and Storm Drainage Facility Plan. Table 3-9 of the Facility Plan estimates
residential corridors at 1,000-gpm. The mixed use and school site will require
fire flows up to 3,000 gpm. Fire sprinkling may be necessary at these sites to
accommodate the available fire flow. This flow is also required by the
International Fire Code Appendix B.
4.0 Preliminary Water System Model
Once the proposed water system demands were established, the demands were
imported into the City of Kalispell Water Model provided by the City. This model
will be the basis for determining the adequacy of the existing system to serve
Starling as well as any water system improvements that may be required. See
Figure 1-4 and Figure 1-5 for proposed water main pipe sizes.
2
STARLING WATER DISTRIBUTION SYSTEM ANALYSIS
t
Eight different scenarios were modeled. All scenarios assumed the new upper
zone reservoir had been constructed. This reservoir has a proposed construction
date of summer 2007. The water modeling scenarios reviewed the impact of
connecting and not connecting to the proposed 14-inch water main that is being
extended north along Stillwater Road as part of the Fox Trotter Development.
The various modeling scenarios include:
• Average Daily Demand (without connection to the Fox Trotter extension)
• Maximum Daily Demand (without connection to the Fox Trotter extension)
• Peak Hourly Demand (without connection to the Fox Trotter extension)
• Maximum Daily Demand and Fire Flows (without connection to the Fox
Trotter extension)
• Average Daily Demand (with connection to the Fox Trotter extension)
• Maximum Daily Demand (with connection to the Fox Trotter extension)
• Peak Hourly Demand (with connection to the Fox Trotter extension)
• Maximum Daily Demand and Fire Flows (with connection to the Fox
Trotter extension)
The maximum daily fire flows without connection to the Fox Trotter extension
ranged from 1,350 gpm to 1,700 gpm. The maximum daily fire flows assuming a
connection to the Fox Trotter extension ranged from 1,600 gpm to 2,300 gpm.
The minimum pressure allowed for pipe main sizing is 35-psi during normal uses
and no less then 20-psi residual pressure during fire hydrant full flow condition at
any supply node. See Figure 1-2 and Figure 1-3 for a layout of the model that
was run.
5.0 Modeling Results
All of these main sizes will supply the maximum daily fire flow while maintaining a
minimum residual pressure of 20-psi at all points in the system. The model
results can be found in the appendix of this report.
Q
STARLING WATER DISTRIBUTION SYSTEM ANALYSIS
- 7 L
V.
_ I
PHASE 9
PHASE 8
"PHASE 2�~' Y
I t
AS, 1 \
RASE 3
PHASE 19
- I
Ft
&AI
`PHASE 4
P7,
HASE
• f
ASE -
i `i
r
PHASE 11
P SE 5
JV
LEGEND:
PROPOSED PHASE BOUNDARY
rr -
PROPOSED WATER MAIN
N
300 150 0 300 600
SCALE IN INCHES
13
14
P ASE 12
III `�_-,�,.�r� ��\•\ - \.. I
1
VERIFY SCALE REVISIONS
i SEPR"v MYEE NO, DESCRIPTION DATE BY DRAWN BY_ APF PROJECTNUMBER
333e.030
REct,cE❑LMSEL�CNFNHC MoR�tsaN t22BWhd..IiT geRoad CHKD.BY: GLl STARLING
ueA IGM DU'UN ory ,j M 1� Kd:sP�. slT scoot APPR- BY: GLL KALISPELL MONTANA SHEET t-UA16ER
OR1c tuL oanrf rrc SU�ntlYs DRAWING NUTABFit
��{1�F DATE: 0 ME007
1> M Ll J.J INC. Ptennefs PFo (408)
3916
tacaFr acwLs ncccRar;�r• - 7 F face»sanol QA. REVIEw WATER MODELING
AnFmpRnyco-OwncdCom!>s 9 BY: Fig. 1-1 U.133&1103951aAinpMxJonaV�CAD',Cir111Wdx Diepay dNg Plolled 6y dhanson vn lAazch 21, 2007 rrrmnrrteuowemrw�ufRL Me. ant DATE-
N
200 100 0 200 400
SCALE IN INCHES
VERIFY SOALE!
TNEBE Ewtrts Nwr gE
REDUCED. LINE BELOW
MEASURES DR INCH DR
NO.
[zEV1510h15
DESCRIPTION
DATE
BY;•D�
DRAWN BY: APF
1228 WhI1e0ah stile Rugd OHK'U. BY: GLL
�"0are Kelupan, MT 599Q1omawauwaa LA son you Gtt
JMORRISON BY:
iAt Ti TK�T1 7}{��T ScknNeb DATE: DJJ2007
L IERL E IN planners Phare:(406)752-2215
i Fax:(408)752-2391 O.A. REVIEW
A. L•7nptoyrnO+vnad Campany BY:
cm CDATE:.
STARLING
tCALkSPELL MONTANAAFPR
PROJECT NUMBER
SHEET NUMBER
MOaFr gCAIEAccoaaNCLYS
WATER MODEL -SOUTH
DRAWING NUMBER
Fig.. 1-2
U:133841039 Sterling Meadows%lCAOiCIARWATER
MODELING 03.21-07.dv Platted by dhansan on March 21,=7
VERIFY SCALE!
THESE PRINTS LIAY BE
REDl1CfiD. LLYE BELOW
MEASURES ONE NCH CN
MGMAL DRAWN O
NO.
REVISIONS
D 1VN BY: AYr
tzzewndaranslateRoad cHK" El': A L
J� /r� f'�7'''y��'
IU11 1{f FE/ SON EIS Kalispell, MT 5MI
1**11.71'►}�{41 77MM�� 1171IyU7*ry1ry S—Y— APPR. BY: GLL
'"- � 3e! 11 \ W � Sdan ers DATE 03/2D07
Plerttten; Phone: {A08)7a2.221Ei q,A REVIEFN
�. ,ytey o�rn�dC—was Fax:{aoa)75azast BY
OOEmDMOlkllaa�l'.HtMERIE. EA:.hVI OA7E.-
STARUNG
KALIS PELL MONTANA
PROJECTNUMBER
a3a-tUM
DESCRIPTION
DATE
BY
i
SHEET NUMBER
kt=vZeIBACCCR[xNCtY`
WATER MODEL NORTH
6RA`IYING NUMBER
Fig. 1�,
U'.L?3841030 SIadlrvj MoadowsIACADICIviRWATER
MODELING OL+2i-07.tMg Pbllal by dhanson on March 21, 2007
^ SS y
PROPOSED PHASE LINE
ll S'�.�.�-ems.—c.-r �i_) . ./ ,11•' +f �..
--5`+., -,_ � rs y'- „_-----.�-•..••--_" ' _..�'"R. If _ �� C ..___._.._._--••r.--------�` PROPOSED WATER MAIN
150 75 0 150 304
i? { i i SCALE INCHES
Lail a
yk nl
VERIFYSCALE' ____ ___ REVISIONS __.___-_. DRAWN BY: APF PROJECTNUMBER
THESE PLANTS AUYOE Na DESCRIPTION DATE 6Y
REDUCED LTS AYBE 11�1[f [r1k �+y, [/'•�'71�tT1 122SWhReMh Stage Road CHKD. BY OLL STARLING SHEETNUMBER
AIEASURESCNE utoi CU j ORRIS O KaliapNl. MT SODof
�G,,,u� suray+xa APPR BY: cu KALISPELL MONTANA
Al �� �� LSi� ptenr m Phorla(400)752.22t0 sciewsts OATS 03r2007 DRA'!lniG NUf.IBER
7 P�(400752-230i aA REVIEW WATER MAIN SIZES
A�OpFY SCALE AGCOaOaDLT An E1IIpl y--�FDLd COII11—Y BY: Fig. y{ 1 "`�•
U:133B44030 Starling MeadomSACAMCmtar PWaDmplay.d" Ploned by dhans n on March 21, 2D07 ccwmnNronawAiSnNUAEr¢E.++D.An DATE;
LEGEND:
PROPOSED PHASE BOUNDARY 200 lOD 0 200 400
SCALE IN INCHES
PROPOSED WATER MAIN Z
_+
K
g u.j
-----------------
•, -fit -- � � ,� (,n
co
OW 87"
r
z.
)}
1 'I \ .�
cl-
` R ter:• • 8 ` .t
f g
8
- __ "fir j9— ---,' �,,,_ . �'� 7a � i/� f� >•
/ J
•
14 p t-
I pY �
�} ft i� I
k 37 ,+ it ^ 7)ui
--. r JJ
V I �T ITJG �C" %' 8
11..
�� a
_ --
VERIFY SMEI _- REVISIONS _ DRAWN BY. APF 1111 /J PROJECTNUMBER
TI£5�FRINIS I.'A BE NO. OESCRIPTION r DATE BY
P—ED CEo. LLNEBEL07r /'�•ry�T t228 Whitefish Stage Road CK�CD-BY: GLL STARLING SHEET NUMBER
NESSUFE50NE 33114.039
WCN IXt != F {� �'ON Ewe 3caliepe8. MT 5B86t
]MMMllliii%�1p�J�T1<Y��I N Suveyos APPR BY: GLL KALISPELL MONTANA
:~~ 1 MAIERL� INC, pia ntlsb DATE- o�2om
SO-A,s Phone: (408k?52.2216 DRAWING NUMBER
�, LE„cOONo.NGLY sae�vwrKo •atace x Fax:(406)752.230t OAREVIEW WATER MAIN SIZES Fig. 1 ��
_ �r ax i
U.133841 D39 Staving I.IeadovstACAD',CI�SRWater Display dvg Plotted by dhansun 0n March 21, 2001 camnw o uowasoxsurttas. ec.to.�t DATE