Tab 28. October 14, 2008 Planning Board MeetingKALISPELL PLANNING BOARD MEETING
10/14/2008
Todd Gardner: As you say. There are several pieces that it addresses and we just want it to be ready to
develop any of them. They all have water and sewer to them and they're ready except for
this step.
Tom Jentz: The purpose of the B-5 with that PUD overlay is to be able to look at the street system,
and the sewer and the water, and have the uses, and the land be integrated together in a
more well -designed project, so they actually relate, they work together, and that's what, I
think, the Gardners are looking at doing here, a mixture of uses that relate to each other
and create a better design.