Loading...
04-11-13 Site Review MinutesSITE DEVELOPMENT REVIEW COMMITTEE SUMMARY Thursday, April 11, 2013 Lower Level Conference Room 201 First Avenue East ATTENDING: Jeff Clawson, Building Official Mark Crowley, Project Manager Chad Fincher, Parks Superintendent Keith Haskins, Senior Civil Engineer Tom Jentz, Planning & Building Director Rick Parker, Bldg. Dept. Inspector Wade Rademacher, Police Lieutenant Rebekah Wargo, Asst. Civil Engineer P.J. Sorensen, Chairman Kathy Kuhlin, Recording Secretary GUESTS: James Freyholtz, Montana Department of Transportation HEAR THE PUBLIC: None. PERFORMANCE BOND REMINDERS: None. OLD BUSINESS: Coffee Shop — 305 2nd Ave W; convert dry cleaning business to restaurant. Nothing new received on this project. This will be on the agenda for next week. Glacier Eye Clinic — Reserve Loop; new medical office. They are still working with Public Works on revisions for this project, as well as working on getting their approach permit from MDOT. Wargo stated they are working on changing some of the structural design. This will be on the agenda for next week. NEW BUSINESS: Prestige Assisted Living on Glenwood — Memory Care Addition —They obtained their Conditional Use Permit last fall. It is here now for Site Review and their Building Permit. This will have a double frontage lot that runs between Meridian and Glenwood, with their main entrance off of Glenwood. This is an "L" shaped lot, and they are also planning for a potential future building. There will be 24' wide, two-way aisle with perpendicular parking. Discussion was held regarding their handicapped parking. They have not submitted their full plans to Public Works yet. They are still working on their stormwater and also have some sewer issues. This will be on the agenda for next week. Crowley suggested they be required to extend their on -site sidewalk by 40-50' to match up to the existing sidewalk. Montana Lil's — 285 North Main; new entry vestibule. They put in a glass smoking but right outside the front door previously, and are planning to add an extension of that. This will be the same kind of glass enclosure but it will be an entryway vestibule to tie right off of the existing smoking hut. Their smoking but is not supposed to be enclosed, and we may need to refer them to the County Health Department once we receive more complete drawings. This will be on the agenda for next week. PLANNING OFFICE ITEMS — Cliff View Subdivision - This was approved by the Planning Board and will move forward to the City Council. Orchard Village Apartment Complex - southside of Appleway. The owner is looking at annexing a sliver of property on the very west side of that, which presently has a little house on it. He wants to put another 4-plex apartment on there. This would be an annexation with a Conditional Use Permit. He plans to keep the house there. This may come in early enough for the May Planning Board meeting. Fred's Appliance —possibly going in north of Mergenthaler's south of town, but their application for annexation has not been received yet. They plan to open up in Gardner's RV building until their 20,000 sq. ft. building is built. OTHER REPORTS: Syke's — Fincher stated Syke's wants their bond back for their landscaping. He stated they have not completed all the landscaping requirements there so it is not ready to be released at this time. Bypass — MDOT has announced the available funds to complete the half -mile of bypass from West Reserve and U. S. Highway 93 North, down to Reserve Loop. The bid letting will be in late June, and they plan to have this project completed by July, 2014. This will be a 4-lane design. The meeting was adjourned at 10:20 a.m. 2