Loading...
1. Ordinance 1723 - Zoning with PUD Overlay Gardner Investments LLC - 1st ReadingPlanning Department 201 1" Avenue East Kalispell, MT 59901 Phone: (406) 758-7940 Fax: (406) 758-7739 www.kalispell.com/planning REPORT TO: Doug Russell, City Manager P?111 FROM: Sean Conrad, Kalispell Planning Department SUBJECT KPUD-13-01 MEETING DATE: April 15, 2013 BACKGROUND: The Kalispell City Planning Board met on March 12, 2013, and held a public hearing to consider a request from Volkswagen Real Estate and Gardner Investments for a planned unit development (PUD) overlay zoning district. The PUD would permit the construction of a Volkswagen dealership on one lot (Parcel A) with the intention of attracting similar or complimentary businesses to the auto dealership on the second lot (Tract 2). The two tracts of land included in the PUD request are located at the southeast corner of the intersection of Highway 93 South and Willow Glen Drive. The two tracts of land can be legally described as Parcel A of Certificate of Survey #19299 and Tract 2 of Certificate of Survey #6628 located in the SW '/ of the NW % of Section 28, Township 28 North, Range 21 West, P.M.M., Flathead County, Montana. At the public hearing the planning board heard from Ken Kalvig of Kalvig & LeDuc, P.C., representing Montana Venture Partners. Mr. Kalvig made a presentation regarding the issues his client has with the PUD application. Specifically, the PUD application lacks detailed information on how the development will connect to the city water and sewer mains in the area. Mr. Kalvig also requested the planning board review the information he submitted on past PUD's the city has approved and concerns with the PUD before them. In addition to Mr. Kalvig two other members of the public voiced their concerns on the PUD project. Mr. Miller and Mr. Wachholtz requested that the water and sewer plans for the project be submitted now and the latecomer's fees be paid for the connection to the adjacent water and sewer lines. Howard Mann, developer of Silverbrook Subdivision, also voiced his concern of the latecomer's agreement as he is in the same position as Montana Venture Partners on the north end of the city. Speaking for the project was Mr. Larsen and Mr. Liechti of APEC Engineering, Jeff Brown of Glacier Volkswagen, Todd Gardner and Davar Gardner. Mr. Larsen noted his clients had concerns with several of the conditions listed in the staff report and spoke to those conditions. No one else spoke at the public hearing and the hearing portion of the meeting was closed. A motion was made and seconded to approve the PUD with the 20 conditions, as amended, in the staff report. There was discussion between the planning board and staff regarding the issues raised during the public hearing. A motion to table the project for two weeks was made and seconded in order to give the planning board members time to review the rather lengthy book of materials submitted to them at the hearing. Please note that the materials submitted to the planning board primarily contain copies of past PUD projects including staff reports and minutes from meetings. Should council members request to review the information submitted to the planning board, the binders are available at the planning department and the city clerk's office. However, a summary of the information contained in the binder submitted to the planning board is attached. At the planning board meeting of March 26 h the board moved the project off the table. There were several questions for staff regarding information contained in the PUD application and zoning code requirements for PUD applications. Following this discussion the board acted on the original motion to recommend approval of the PUD application with the 20 conditions as amended. The motion was unanimously approved. RECOMMENDATION: A motion to approve PUD proposal with 20 conditions recommended by the planning board. FISCAL EFFECTS: Approval of the request would have minimal fiscal effect to the City. ALTERNATIVES: Deny the request. Respectfully submitted, Sean Conrad Kalispell Planning Dept Report compiled: April S, 2013 c: Theresa White, Kalispell City Clerk ORDINANCE NO.1723 AN ORDINANCE TO AMEND SECTION 27.02.010, OFFICIAL ZONING MAP, CITY OF KALISPELL ZONING ORDINANCE, (ORDINANCE NO. 1677), BY ATTACHING A PLANNED UNIT DEVELOPMENT OVERLAY ON CERTAIN REAL PROPERTY CURRENTLY ZONED B-5 (INDUSTRIAL/COMMERCIAL), MORE PARTICULARLY DESCRIBED AS PARCEL A AS SHOWN ON CERTIFICATE OF SURVEY NO.19299 AND TRACT 2 OF CERTIFICATE OF SURVEY NO. 6628 LOCATED IN SECTION 28, TOWNSHIP 28 NORTH, RANGE 21 WEST, P.M.M., FLATHEAD COUNTY, MONTANA, IN ACCORDANCE WITH THE KALISPELL GROWTH POLICY 2020, AND TO PROVIDE AN EFFECTIVE DATE. WHEREAS, Volkswagen Real Estate LLC and Gardner Investments LLC petitioned the City of Kalispell that a Planned Unit Development overlay be attached to the current B-5 zoning classification on the above described tract of land, and WHEREAS, the property is located at the southeast corner of the intersection of Highway 93 South and Willow Glen Drive, and WHEREAS, the petition of Volkswagen Real Estate LLC and Gardner Investments LLC was the subject of a report compiled by the Kalispell Planning Department, Staff Report #KPUD-13-01, in which the Kalispell Planning Department evaluated the petition and recommended that a Planned Unit Development overlay be attached to the property as described above, pursuant to Kalispell City Code 27.29.020, and WHEREAS, the Kalispell City Planning Board held Public Hearings on the matter on March 12, 2013 and March 26, 2013, and recommended that a Planned Unit Development overlay be attached to the current City B-5 zoning, pursuant to Kalispell City Code 27.29.030, and WHEREAS, after considering all the evidence submitted on the proposal to attach a Planned Unit Development overlay to the described B-5 zoning, the City Council finds such zoning to be consistent with the Kalispell Growth Policy 2020 and adopts, based upon the criterion set forth in Section 76-3-608, M.C.A., and State, Etc. v. Board of County Commissioners Etc. 590 P2d 602, the findings of fact of KPD as set forth in Staff Report No. #KPUD-13-01. NOW THEREFORE, BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF KALISPELL, AS FOLLOWS: SECTION 1. Section 27.02.010, of the Official Zoning Map of the Kalispell Zoning Ordinance, (Ordinance No. 1677) is hereby amended by designating the property described above as B-5, Industrial/Commercial, with a Planned Unit Development overlay. SECTION 2. The Planned Unit Development proposed by Volkswagen Real Estate LLC and Gardner Investments LLC upon the real property described above is hereby approved, subject to the following conditions: General Conditions: 1. The development of the two tracts of land (Parcel A and Tract 2) shall substantially comply with the following site plan and elevations submitted as part of the Planned Unit Development application: A. Site Layout Plan B. Building footprint site plan C. Elevations of the proposed Volkswagen dealership. 2. The permitted and conditional uses for Parcel A and Tract 2 are restricted to an auto dealership, professional office or commercial use complimentary to an auto dealership. 3. The property owner shall maintain the landscaping on their property and from their property line to the adjacent street or highway. 4. All utilities shall be placed underground. 5. Prior to further development on land shown on Figure 2 the owner(s) shall submit a detailed PUD layout plan for the area that addresses the following: • Conceptual design of a frontage road parallel to Highway 93 and identifying which existing approaches along Highway 93 will be used and the nature of the approach (i.e. right-in/right-out only, full movement approach or 3/4 movement approach). • Identify the area and approximate size and specifications of a regional storm water detention area. • Approximate locations of north/south streets and east/west streets serving the area and the type of streets proposed (i.e. local street or collector street). • A conceptual design for lots within the area that identifies the location of buildings to the adjacent street and their associated parking lots. Prior to the issuance of a building permit: 6. A development agreement shall be drafted by the Kalispell City Attorney between the City of Kalispell and the developer outlining and formalizing the terms, conditions and provisions of approval. The final plan as approved, together with the conditions and restrictions imposed, shall constitute the Planned Unit Development (PUD) zoning for the site that shall be completed and signed by the city and owner prior to the issuance of a building permit. 7. The billboards on Parcel A shall be removed. 8. A landscape plan shall be submitted to the Parks and Recreation Department for review and approval. The landscape plan shall include an irrigation plan and specify tree and shrub type and size at the time of planting for the parking areas, areas around the building and adjacent right-of-ways. Note: Based on the eventual street design for Lower Valley Road the street trees may be required to be located on private property due to the lack of an adequate boulevard for tree survival. 9. A pedestrian/ bike path plan shall be provided to the Parks and Recreation Department and Public Works Department for review and approval. The plan shall show a connection to the intersection of Lower Valley Road and Willow Glen Drive and include a bike trail along Lower Valley Road. Note: An asphalt bike trail shall have a minimum width of 10 feet; a concrete bike trail shall have a minimum width of 8 feet. 10. A traffic analysis shall be submitted to the Public Works Department for review and approval prior to building on Parcel A. The traffic analysis shall account for future vehicle traffic on the approximately 55 acres of this PUD and determine the improvements required to Lower Valley Road based on the anticipated development and traffic volumes. 11. The property owner of Parcel A shall improve the property's frontage along Lower Valley Road in accordance with the approved traffic analysis. All improvements shall be completed in accordance with the City of Kalispell's Standards for Design and Construction and Montana Public Works Standards; and shall be certified by an engineer licensed in the State of Montana. All work shall be reviewed and approved by the Kalispell Public Works Department prior to construction. Note: Prior to work on Lower Valley Road the property owner or developer shall contact the postal service regarding the temporary relocation of mail boxes along the section of Lower Valley Road receiving work. After work is completed the mail boxes shall be reinstalled on same or better stands. 12. Water and sewer main extensions shall be reviewed and approved by the Kalispell Public Works Department prior to installation. 13. The developer shall submit to the Kalispell Public Works Department for review and approval a storm water management plan that meets the requirements of the current city standards for design and construction. The approved storm water management plan for on - site facilities shall be completed prior to the issuance of a building permit. 14. The property owner of Tract 2, prior to connecting to the city's sewer main, shall submit an analysis on the need for a regional lift station for the area. 15. A certification from an engineer licensed in the State of Montana shall be submitted to the Public Works Department stating that all water and/or sewer lines have been installed per the approved plan. 16. Any off -site storm water management facilities shall be installed per the approved plan. 17. All landscaping shall be installed per the approved landscape plan. 18. The bike trails shall be installed per the approved plan. 19. A certification from an engineer licensed in the State of Montana shall be submitted to the Public Works Department stating that the improvements to Lower Valley Road have been built as designed and approved. 20. The property owners of Parcel A and Tract 2 shall obtain the appropriate permit for the approach onto Highway 93 and receive an approval from MDT on the completion of conditions or requirements attached to the approach permit. The approved approach permit and MDT approval shall be submitted to the Kalispell Planning Department. SECTION 3. The balance of Section 27.02.010, Official Zoning Map, City of Kalispell Zoning Ordinance not amended hereby shall remain in full force and effect. SECTION 4. This Ordinance shall take effect from and after 30 days of its passage by the City Council. PASSED AND APPROVED BY THE CITY COUNCIL AND SIGNED BY THE MAYOR OF THE CITY OF KALISPELL, MONTANA, THIS — DAY OF , 2013. Tammi Fisher Mayor ATTEST: Theresa White City Clerk Figure 2 �WELFLN L& W JD,; Ma .......... . B -5 GF to YV, 50 300 ' Approximately 53-4acresl -N-o FAIP2011900 IMgD.2cMuh 6, 2016 KALISPELL CITY PLANNING BOARD & ZONING COMMISSION MINUTES OF REGULAR MEETING MARCH 12, 2013 CALL TO ORDER AND The regular meeting of the Kalispell City Planning Board and ROLL CALL Zoning Commission was called to order at 7:00 p.m. Board members present were: Chad Graham, Phillip Guiffrida, Rory Young, Charles Pesola, Richard Griffin and Matt Regier. Ken Hannah was absent. Tom Jentz, Sean Conrad and P.J. Sorensen represented the Kalispell Planning Department. There were 16 people in the audience. APPROVAL OF MINUTES Guiffrida moved and Pesola seconded a motion to approve the minutes of the February 12, 2013 meeting of the Kalispell City Planning Board and Zoning Commission. VOTE BY ACCLAMATION The motion passed unanimously on a vote by acclamation. PUBLIC COMMENT No one wished to speak. GARDNER INVESTMENTS/ A request from Gardner Investments LLC for a planned unit VOLKSWAGEN development (PUD) zoning overlay approval for two tracts of land DEALERSHIP PLANNED located at the southeast corner of the intersection of Highway 93 UNIT DEVELOPMENT South and Willow Glen Drive. The PUD is requesting approval to develop both tracts of land to accommodate an auto dealership on one tract of land and either an additional auto dealership or similar supporting business on the second tract of land. Both tracts of land are currently undeveloped. STAFF REPORT KPUD-13-01 Sean Conrad, representing the City of Kalispell reviewed Staff Report KPUD-13-01 for the board. Conrad said this is a PUD request for two pieces of property on Highway 93 South and were part of an 82 acre annexation approved in November 2008 which runs from Lower Valley Road south to Snowline Lane. There were several buildings on the properties but the majority of it was undeveloped at the time of annexation. When the city council approved the annexation request they zoned the property B-5 which is an industrial business zoning district and also put a PUD placeholder on the entire 82 acres. The PUD Placeholder ensures that when development came in for either all of the 82 acres or portions of it the planning board and city council would have a chance to review the development looking at the integrity of the development, access points and make sure it was done in a manner that reflects the rest of the city. Kalispell City Planning Board Minutes of the meeting of March 12, 2013 Page 1 of 11 Conrad continued the PUD includes 2 existing lots of approximately 7.6 acres, the northern lot would be the site of a future Volkswagen dealership and the southern lot would be possibly another dealership or a similar type use. Conrad reviewed the proposed site layout for the board and noted the area along Lower Valley Road and Highway 93 South would be landscaped and eventually a bike path that would continue south as the other lots/tracts develop. The two lot PUD request included a preliminary sketch that would include a regional storm water facility. Staff noted an existing radio station encumbered an extensive amount of the site to the south. Conrad noted there is a recommended condition of approval that states prior to further development beyond this two lot PUD the property owners will come back and give the city a better idea of how the remainder of the property would be developed including frontage roads and connecting streets, storm water facilities, water and sewer lines, etc. Conrad noted after the staff report was sent to the developer they had a question on condition #5 and asked for clarification on the exact property that was referred to as "the land under the B- 5/PUD" and that it not be tied to further development of the two lots under this PUD. Staff is therefore recommending the following amendment to the first paragraph of Condition #5: "Prior to further development on land under- Ns B 5/PUD shown on figure 2 the owner(s) shall submit a detailed PUD layout plan for the area that addresses the following:" Staff recommends that the Kalispell Planning Board adopt Staff Report KPUD-13-01 as findings of fact and recommend to the Kalispell City Council that the PUD overlay zoning district be approved subject to the 20 conditions, as amended, listed in the staff report. BOARD DISCUSSION Rory Young asked for clarification on compatible uses for the adjacent property and Conrad said when he talked with APEC they were looking at another auto dealership. Compatible uses could possibly be a car wash, oil change business, retail businesses or office space that would complement the VW dealership. Conrad said the B-5 zoning district allows a wide variety of land uses — anything from gas stations and truck terminals to bakeries and banks, and everything in between. The uses could also be expanded as recommended by the planning board and discussion with the developer. The city does not have a definition of compatible uses. Kalispell City Planning Board Minutes of the meeting of March 12, 2013 Page 2 of 11 Guiffrida noted the very lengthy document that was presented by Montana Venture Partners, LLC to the board this evening and asked if staff had an opportunity to look over the document and Jentz said he has reviewed the document. Graham asked if staff could clarify what private property would the street trees be required under condition #8 and Conrad said the property where the Volkswagen dealership would be located. Conrad added the reason that the parks department wanted that note placed on that condition is because they didn't know the ultimate design of Lower Valley Road and how wide the boulevard might be and if the boulevard was too narrow and with traffic and snow removal the tree might not survive. PUBLIC HEARING Ken Kalvig, an attorney said he is representing Montana Venture Partners. His address is 1830 3rd Avenue East in Kalispell. He thanked the city staff for their assistance in preparing for tonight's meeting. Kalvig said they hope the planning board reads the packet and considers the information which is mandated by Montana Law. He noted Montana Venture Partners, LLC, are the developers of the Old School Station project south of Kalispell. Kalvig said they are interested in quality development especially along the Highway 93 South corridor and he added the city's growth policy calls for quality development in Kalispell and for planned unit developments on larger projects. Kalvig continued they want to know what the plans are for sewer and water service to this site and the larger Gardner 80+ acre PUD and how it will join to Kalispell's existing infrastructure. Montana Venture Partners has a vested financial interest in this issue. Kalvig said the PUD process requires an applicant to include its plans for many aspects of the development including sewer and water and that information needs to be included with the application for public review and scrutiny. This information was not provided in the application materials. Kalvig said there have been discussions between the applicant and the city regarding a regional wastewater lift system that would redirect wastewater away from the infrastructure that Old School Station put into Highway 93 but there aren't any firm plans at this time. Kalvig continued when they hear there isn't an overall concept plan for this development because of the radio station and towers on the property it begs the question why is there discussion about a regional wastewater lift station when thinking about servicing a larger area. The PUD process is the time when those ideas should be on the table for public review and discussion. Kalispell City Planning Board Minutes of the meeting of March 12, 2013 Page 3 of 11 Kalvig went through a power point presentation including Montana Venture Partners and the Highway 93 South sewer and water extensions that were completed a few years ago. (A copy of the slide presentation is attached to these minutes). Kalvig made the following points: • Sewer and water lines were upsized, extended, and financed by Montana Venture Partners in order for Old School Station to be annexed into the city. • Morrison & Maierle conducted a needs study for capacity not only for the Old School Station project but for future development of surrounding properties to determine the size of the line. The report indicated that the service area was approximately 3000 feet on either side of Highway 93 South which included the Gardner property on the northern boundary and the Old School Station property along the southern boundary. • The city's 2008 Highway 93 South Corridor Growth Policy Amendment map includes nearly the same properties that were included in the service area map. In addition the growth policy indicated the recent extension of water and sewer along Highway 93 South is available to serve all lands within the growth policy amendment area. • City of Kalispell Developer Extension (Latecomer Agreement) brochure references the city's agreement with Montana Venture Partners for water and sanitary sewer improvements and noting the general area is south of Cemetery Road. • City staff reports for the Gardner and Siderius annexations and PUD placeholders indicated that these properties are in the area intended to be served by the Old School Station water and sewer lines. • Kalvig reviewed the location of the Gardner and Siderius properties within the service area and noted if the idea that a regional wastewater lift station would be constructed to service the balance of the Gardner property it would result in the non-payment of latecomer fees being paid to Montana Venture Partners and he added hopefully the same plan would not be proposed for the west side of the highway. • Kalvig provided an overview of the properties in the service area which includes the PUD areas, already developed areas, city property and floodplain. He said when you look at the balance of the map the property left that could develop and use their services it doesn't paint a very pretty picture for Montana Venture Partners who fronted the cost of extending the sewer and water. Kalispell City Planning Board Minutes of the meeting of March 12, 2013 Page 4 of 11 Kalvig reviewed the type of plans that are required to be submitted with the PUD application with a timeline. He noted the applicant addressed these requirements by citing the city regulations and Kalvig said that is not what the PUD regulations say — more is required. Kalvig added that the changes that took place with the Kalispell Zoning Regulations and the establishment of the PUD Placeholder doesn't set up a scenario where you can do a PUD on 80 acres and come in and say we have a vision for 10% of it and here it is — that is not the way it was intended to work. Kalvig referred to a letter from Bruce Lutz of Sitescape Associates that states in part he is pleased to see this project happen and he welcomes good development but he is troubled by what he has seen in this application, how it is being handled by the city and how this sets a different precedent for how things have been done in the past. Kalvig said if the city approves this application it will lower the bar for processing PUD's and if the precedent is set and the standards are lowered, every other developer will expect the same treatment. Kalvig reviewed the staff report and noted staff is responsibly requiring more information prior to the issuance of a building permit that will address traffic, landscaping, park requirements and a trail system, storm water, sewer and water. However, Kalvig concluded, that information needs to be submitted with the application not after the public process is closed. Andrew J. Miller, 175 East Many Lakes Drive, Kalispell said he was a partner with Paul Wachholtz when they came before the planning board and council with the Old School Station development. They built a first class business park and wanted to drive business up to Kalispell and bring growth, jobs, and opportunity to this community. Miller had to walk away from the development but he said this is a great project that shouldn't be in this situation. When they sat down with the city they decided to upsize all the utilities because they felt there would be growth on the south side of Kalispell, industrial/technology growth. They put state of the art technology, infrastructure and fiber optics into this development and they can make it happen with the help of the city. Miller added doing what is right is what integrity stands for. Paul Wachholtz, 183 Fairway Boulevard, P.O. Box 1477, Kalispell stated he is a member of Montana Venture Partners (MVP) who developed Old School Station Industrial Park. MVP wants to see development and quality growth in Kalispell because it is good for the city and MVP who has a vested interest in what happens south Kalispell City Planning Board Minutes of the meeting of March 12, 2013 Page 5 of 11 of Kalispell - $4 million dollars in latecomers fees plus a loan secured by Glacier Bank whose interest is to make sure that MVP's agreement with the City of Kalispell is as good as the paper it is written on. Wachholtz said the PUD zoning process ensures quality development and the people involved in this development are quality people. Old School Station was developed and oversized because of the demands of the City of Kalispell. Wachholtz described the infrastructure that was put in by MVP and noted they oversized the infrastructure from Old School Station all the way to the Four Corners intersection because the city knew there would be development in the future. In their latecomers agreement they are allowed to be reimbursed for the cost of up -sizing and when latecomer fees are paid the city gets a small percentage of that fee (6%) and the rest, in this case is shipped to Glacier Bank and the remaining money goes to his loan. When the private section invests money into these extensions and the city said that they would be reimbursed for them, that is what is expected. Wachholtz said it is not where you hook into the services but what land is annexed into the city system. It might be cheaper to go around and not pay latecomer fees but that is not what the agreement indicates. Wachholtz concluded the plans for the sewer and water needed to be submitted in the PUD process for MVP to review. He is not against the Gardners or DePratu Ford/Volkswagen but he feels MVP deserves the latecomer fees which they were promised. Kim Larson, 1234 McMannamy Draw said he is representing APEC Engineering located at I I I Legend Trail, Kalispell. Larson said he is only speaking to the two parcel PUD which is before the board. Larson noted they have reviewed the staff report and conditions of approval and they have the following comments: Under Item F.2 — Control Over Vehicle Traffic There is a recommendation from Public Works that as part of the two parcel PUD that they need to take a look at the entire overall PUD in relation to Lower Valley Road, that would include the additional 55 acres, and determine the improvements required to Lower Valley Road based on anticipated development and traffic volumes. The developer is only looking at these two parcels not the overall PUD at this time and they are not sure what will happen with further development. They would expect to continue the curb and gutter along the south edge of Lower Valley Road to the end of the property and they would include bike paths and work with the city as far as landscaping, etc. Larson said they don't feel that they Kalispell City Planning Board Minutes of the meeting of March 12, 2013 Page 6 of 11 should have to widen Lower Valley Road to 34 feet, collector road standards. Condition #2 — restricting the uses on Parcel A and Tract 2 Larson said the owners are questioning the restriction of the uses on these parcels to auto dealerships, professional office or commercial use complementary to an auto dealership because they don't know what businesses will eventually want to be located on this property. Condition #5 has already been addressed by staff Condition #10 relates to the discussion under item F.2 above Larson restated they are currently looking at the Volkswagen dealership and the lot to the south and at this point it seems excessive to require the traffic study and change the entire route for what is probably a minimal amount of additional use. Condition #14 — requires an analysis on the need for a regional lift station upon development of Tract 2. Larson said at this point the owners are only looking at the two lots to develop. There are radio towers and other issues on the remainder of the property but the reality is that Tract 2 can be served by existing sewer by gravity feed to the north — without having to worry about a regional lift station so why should they be required to submit an analysis when they don't need the regional lift station at this point. Marc Liechti, owner of APEC Engineering, 111 Legend Trail, Kalispell stated they have not had a chance to review the submittal given to the board by Ken Kalvig's office but they would like the opportunity to review this information. At this point there is a two lot PUD in front of the board and what will happen in the future they don't know. Liechti asked planning staff to address some of the concerns that were raised by Mr. Kalvig. Jeff Brown, 230 Hartt Hill Drive, Kalispell stated he is partners with Bob DePratu on the Glacier Volkswagen venture and he just wants to build the building and sell cars. This has to be a business that can make a reasonable profit and they can bring a lot to the City of Kalispell as they did with the Toyota dealership. They have to do it in a timely manner and affordably and with the economy the way it is at some point they may have to decide this isn't worth it. This is a great opportunity for the south side of Kalispell. Howard Mann, 3154 Parkwood Lane, Bigfork said he is very concerned because he also has a latecomer agreement and was asked to oversize the infrastructure to the north at a huge expense. He can't imagine that the city would allow a development to Kalispell City Planning Board Minutes of the meeting of March 12, 2013 Page 7 of 11 circumvent the very reason they were asked to put in the oversized infrastructure in the first place. He too has a reimbursement area and when you take a portion of that area out the chances of recouping up -front costs is in jeopardy. Todd Gardner, 3065 Airport Road, Kalispell stated he is the owner of most of this property. Gardner noted they proposed the PUD to be developed in phases and thankfully they did because they didn't know what was coming and they could have gone broke. They are trying to develop it in a quality manner as there is some demand for the lots but they don't know what size lots will be needed in the future so they would like to leave it open. Gardner said they are just talking about the two corner lots right now and there is water and sewer already available at this corner. There has been a lot of talk about the latecomer fees and that we are trying to go around MVP but we are in fact currently in discussions with them about future development. Gardner Auction Service, Rock City and Janitor's World were all developed with water and sewer from the MVP lines at a cost of over $100,000 in latecomer fees to MVP. Davar Gardner, 3095 Airport Road, Kalispell stated the things being discussed have no bearing on the two lot PUD. He has had the highest regard for Andy and Paul over the years and has done everything possible to help them market Old School Station and he even maintained the vacant property for them. Gardner said because the MVP sewer runs down one side of the highway and water down the other it isn't cost effective to service his property but he feels it will be eventually be worked out. MOTION Guiffrida moved and Young seconded a motion that the Kalispell Planning Board adopt Staff Report KPUD-13-01 as findings of fact and recommend to the Kalispell City Council that the PUD overlay zoning district be approved subject to the 20 conditions listed in the staff report. BOARD DISCUSSION Guiffrida wondered if these discussions fall under the scope of the planning board. Guiffrida asked when dealing with a PUD how often do they have final engineering at the board or council level and Jentz said when the PUD is submitted the city requires preliminary plans and our goal is to determine if a property can be served not to approve the final engineering. When the approval is in hand it is the time to expend the money necessary to complete the design work for the sewer system. Kalispell City Planning Board Minutes of the meeting of March 12, 2013 Page 8 of 11 Guiffrida noted the packet was given to them right before the meeting and he can't make a decision until he has had a chance to review all this material. Guiffrida asked if staff had a chance to review the materials and Jentz said he read it he can go over the 15 sections and provide the board with the highlights at this time. Guiffrida said it is the board's responsibility to read through everything that is presented to them. The work session a month ago would have been the more appropriate time to receive the materials and there was plenty of notice given to the public to comment. Guiffrida said he would entertain a motion to table the PUD which would also allow APEC engineering to review the material. Griffin said he agrees with most of Guiffrida's remarks. His concern is how much pertains to the PUD and how much pertains to the latecomer fees which will fall into the PUD when the sewer plan is submitted. He hasn't had a chance to read through it either and he can't make a decision on it tonight. Young said he welcomes Guiffrida's suggestion to table the PUD until they have had a chance to review what is in the materials. He asked staff if they have had a chance to discuss these issues with the city attorney to determine the legal ramifications of the latecomers agreement and whether the board can consider the PUD and allow the legal team to settle the sewer issues. Jentz said there are two pieces of original information in the packets including Ken Kalvig's letter were he says that MVP spent $4 million dollars to bring the system in and Kalvig's second point where he states the PUD itself is flawed in staffs review and presentation. Jentz said there are all sizes and shapes of PUDs from 460 acres with a 700,000 sq. f. shopping center to PUDs that are three pages long and dealt with setbacks and a height issue. This PUD is not a subdivision the lots exist and there is a water and sewer main out in front of the property. It is zoned commercial, and for all practical purposes meets almost all of standards of a B-5 zone. When we talked about what the design would look like staff suggested like the Toyota dealership. The board is asked as part of the PUD process to review an overall plan for sewer and water and the two lot PUD has water and sewer out front and it can be fully developed with those lines. However if the developer proposes something different that will be worked out through the agreement that is in place and through Public Work's review of those standards. Jentz continued the board needs to consider the information that was presented but their role in this process is not necessarily the arbitrator of an agreement but to ensure that sewer, water, storm Kalispell City Planning Board Minutes of the meeting of March 12, 2013 Page 9 of 11 water, streets can be provided and that the landscaping and design aspects are suitable. Jentz added the board could add a condition that would prohibit redundant sewer lines in this area. The second original piece of information is the letter from Bruce Lutz of Sitescape Associates who discusses what he feels is a lack of pertinent landscaping information. Jentz suggested if the board continues this discussion he would recommend two weeks. Charles Pesola said he would also like to reiterate that the materials could have been presented prior to tonight and he agrees it should be tabled. MOTION TO TABLE Guiffrida moved and Pesola seconded a motion to table the Gardner PUD until March 26, 2013. ROLL CALL The motion passed unanimously on a roll call vote. OLD BUSINESS: Jentz asked the board if there are any questions that they want staff to address to help the board make a better decision prior to the March 26th meeting. Griffin said would appreciate clarifications on where the board's authority lies as far as the latecomers agreement and to what extent do the property owners have an option to look at alternative application of sewer and water service. Guiffrida agreed with Griffin and asked staff to take a look at section F. under Public Services — water and sewer because it touches on the board's jurisdiction. NEW BUSINESS: Conrad mentioned staff is still drafting up sections of the growth policy as part of an update based on public comment they received from the public outreach that was conducted last year. They plan to go back to the public and have work sessions in the coming months then an update will presented to the board. ADJOURNMENT The meeting adjourned at approximately 8:30 p.m. NEXT SPECIAL MEETING The special meeting will be held on March 26, 2013 beginning at 7:00 p.m. in the City of Kalispell Council Chambers located at 201 lst Avenue East in Kalispell. NEXT REGULAR MEETING The next regular meeting is scheduled for April 9, 2013 beginning at 7:00 p.m. in the City of Kalispell Council Chambers located at 201 1st Avenue East in Kalispell. Kalispell City Planning Board Minutes of the meeting of March 12, 2013 Page 10 of 11 NEXT WORK SESSION The next work session has not been scheduled. /s/ Chad Graham Chad Graham President APPROVED as submitted/corrected: 3/26/13 /s/ Michelle Anderson Michelle Anderson Recording Secretary Kalispell City Planning Board Minutes of the meeting of March 12, 2013 Page 11 of 11 KALISPELL CITY PLANNING BOARD & ZONING COMMISSION MINUTES OF SPECIAL MEETING MARCH 26, 2013 CALL TO ORDER AND The special meeting of the Kalispell City Planning Board and ROLL CALL Zoning Commission was called to order at 7:00 p.m. Board members present were: Chad Graham, Phillip Guiffrida, Rory Young, Charles Pesola, Ken Hannah and Matt Regier. Richard Griffin was absent. Tom Jentz, Sean Conrad and P.J. Sorensen represented the Kalispell Planning Department. There were 8 people in the audience. APPROVAL OF MINUTES Pesola moved and Guiffrida seconded a motion to approve the minutes of the March 12, 2013 meeting of the Kalispell City Planning Board and Zoning Commission. VOTE BY ACCLAMATION The motion passed unanimously on a vote by acclamation. PUBLIC COMMENT No one wished to speak and the public comment period was closed. OLD BUSINESS: A request from Gardner Investments LLC for a planned unit development (PUD) zoning overlay approval for two tracts of land GARDNER INVESTMENTS/ located at the southeast corner of the intersection of Highway 93 VOLKSWAGEN South and Willow Glen Drive. The PUD is requesting approval to DEALERSHIP PLANNED develop both tracts of land to accommodate an auto dealership on UNIT DEVELOPMENT one tract of land and either an additional auto dealership or similar supporting business on the second tract of land. Both tracts of land are currently undeveloped. MOTION TO REMOVE Guiffrida moved and Hannah seconded a motion to remove the FROM THE TABLE Gardner Investments/Volkswagen Dealership PUD from the table for further discussion. ROLL CALL VOTE The motion was approved unanimously on a roll call vote. BOARD DISCUSSION Graham asked if the board members had a chance to read the information that was submitted by Ken Kalvig, attorney for Montana Venture Partners and Ken Hannah said although he was not at the March 12th public hearing he has had an opportunity to come up to speed on all the information that was presented including the binder from Kalvig's office; the agenda, packets, minutes and he has watched the video from March 12t' meeting. He feels he is fully prepared to discuss and vote on the PUD application request. Sean Conrad of the Kalispell Planning Department noted the city received a copy of a letter dated March 19, 2013, from Ms. Jean Riley, Transportation Planning Engineer with the Montana Department of Transportation which indicates what would be Kalispell City Planning Board Minutes of the special meeting of March 26, 2013 Page 1 of 4 required when the two lots are developed and the developer requests an encroachment permit from MDT. A copy of this letter was emailed to the board and a hard copy has been provided tonight. Guiffrida said he read through the binder and he added it is important to remember the role of this board. As to the concerns over latecomers agreement Guiffrida said he doesn't feel the planning board should be involved because it is outside their scope and between the two property owners. Guiffrida noted the board looks at the basics, does this property have adequate infrastructure within close proximity to it that can be used and the answer is yes. The board also needs to consider the type of PUD they are dealing with - this is not a large scale subdivision with multiple uses but a small commercial PUD. He feels the conceptual drawings submitted are appropriate. Guiffrida added the board should consider only the two lots specifically the Volkswagen dealership and Public Works will make sure that the requirements are met for water and sewer. Guiffrida said the staff report accurately states the findings of fact and he supports the proposal. Hannah asked for clarification on the memo from staff regarding the contents of the binder that indicates the "city" is responsible for ensuring the terms of the latecomers agreement and not the planning commission and Conrad said that is correct. He questioned the use of the word "abut" and Conrad said it could say "adjacent to" instead. Hannah asked if this PUD application was for the full 80+ acres or only the 7.6 acre site and Conrad said a full PUD for the 7.6 acres. The remainder of the property remains under the PUD placeholder. Hannah continued in the findings of fact on page 12 staff indicates there is a possibility of installing a regional lift station for the development of Tract 2 and future development and Conrad said water and sewer are available to these properties but the specific engineering is still conceptual. Depending on the type of development proposed for Tract 2 and the other properties they feel they may need to utilize a regional lift station but that can't be determined at this time. Page 17, item #6 references a development agreement that would be drafted with the city and the developer and Hannah asked if the agreement would be specific to the 7.6 acres only and Conrad said yes. Conrad added Condition #5 gives the property owners a heads up that the city will need more detailed information on the other 55+ acres such as a frontage road and identify if a regional storm water detention area is needed, etc., Condition #10 requires a Kalispell City Planning Board Minutes of the special meeting of March 26, 2013 Page 2 of 4 traffic analysis for the 7.6 acre PUD and one for the other 55+ acres. Hannah asked how Chapter 27.19 of the zoning ordinance was applied and Conrad said that section of the zoning ordinance states within any PUD application they can either submit a full PUD application or a PUD placeholder or they can do both. Conrad said that provides flexibility for the developer in instances such as this when you they are only looking to develop a portion of a large area and they don't really know how the other acreage will be developed. Hannah said so the PUD placeholder will not have to be resubmitted because it remains in effect for the remainder of the property and Conrad said yes. Hannah asked for clarification under Section 3(K) where it refers to a subdivision and asked if there is a subdivision with this proposal and Conrad said no subdivision was required because these are two existing tracts of land. Hannah said the ordinance specifies that when multiple owners of the property are involved all owners must sign the application or provide a letter of consent and he asked if this was covered on the application and Conrad said yes. Hannah concluded by saying this is a very good proposal for the property and he agrees with board member Guiffrida that the facts are very well laid out and he appreciates the work the staff and developers have put into this project. Hannah said he will give this project a favorable recommendation. Graham asked if the letter from MDT coincides with Condition #10 and Conrad said it does because MDT is saying that they want a traffic analysis for the 7.6 acre project and for the remainder of the property under the PUD placeholder. Conrad added it also ties in with Condition #20 which requires an approach permit from MDT prior to the issuance of the certificate of occupancy. MOTION Guiffrida moved and Young seconded a motion that the Kalispell Planning Board adopt Staff Report KPUD-13-01 as findings of fact, and recommend to the Kalispell City Council that the PUD overlay zoning district be approved subject to the 20 conditions as amended at March 12, 2013 meeting. ROLL CALL I The motion, as amended, passed unanimously on a roll call vote. NEW BUSINESS: Jentz noted that there will be a planning board meeting on April 9, 2013 and the only item on the agenda is a three lot subdivision on Mile High Court near Denver Avenue. Kalispell City Planning Board Minutes of the special meeting of March 26, 2013 Page 3 of 4 The Gardner/Volkswagen PUD will be scheduled for the April 15, 2013 city council meeting. ADJOURNMENT The meeting adjourned at approximately 7:25 p.m. NEXT MEETING The next planning board meeting is scheduled for April 9, 2013 beginning at 7:00 p.m. in the City of Kalispell Council Chambers located at 201 1" Avenue East in Kalispell. NEXT WORK SESSION The next work session has not been scheduled. Chad Graham President APPROVED as submitted/corrected: / /13 Michelle Anderson Recording Secretary Kalispell City Planning Board Minutes of the special meeting of March 26, 2013 Page 4 of 4 PLANNING OR:THE FUTURE REPORT TO: Kalispell Planning Board FROM: Sean Conrad, Senior Planner SUBJECT Gardner PUD MEETING DATE: March 26, 2013 Planning Department 201 1" Avenue East Kafispell, MT 59901. Phone: (406) 758-7940 Fax: (406).758-7739 www.icalispell.com/planning At your public hearing on March 12, 2013 Ken Kalvig of Kalvig & LeDuc, P.C., representing Montana Venture Partners presented you with a binder of information which included a cover letter from Mr. Kalvig (tab 1), background of the Old School Station Water and Sewer Lines upsizing (tab 2-8), staff reports and minutes from the creation of the PUD placeholder concept (tabs 9-10), the Gardner annexation and initial zoning staff report and minutes from 2008 (tabs 11-12), the 2 lot PUD application in front of you now (tabs 13-20), a letter from landscape architect Bruce Lutz (tab 21), recent PUD staff reports . including Hutton Ranch, Valley Ranch and Starling (tabs 22-24) and a story from the Daily Interlake concerning a latecomers agreement dated 2011 (tab 25). With the amount of information submitted at the hearing, the planning board tabled further discussion on the project until March 26`t' to allow time for the planning board to review and consider the information. The planning board asked staff to help them with the review process by providing comments on two specific areas, the authority of the board to enter into discussions or give oversight and direction concerning the latecomer's agreements and how this applies to Section F of the staff report concerning the proper provision of water and sewer services. Planning board authority or role relative to the late comer's agreement: The latecomer's agreement is an agreement between two private parties, the developer, Montana Venture Partners, who installed the water and/or sewer lines and then any developer/user needing water and/or sewer service from those lines. The city is responsible for ensuring that the terms of the latecomer's agreement are carried out. Specifically, the Kalispell Public Works Department will make sure the agreed upon fees between the developer and user of the water/sewer line are collected and reimbursed to the developer of the water/sewer line. Neither the city or the public works department are given the responsibility in the agreement to enforce actual hookup to the latecomer agreement lines. Relationship of Section F of the staff report concerning provision of water and sewer as it relates to the latecomer's agreement: The planning board is charged with assuring that adequate provision for public water and sewer is made. In the staff report it is stated that water and sewer mains serve the site immediately adjacent to the properties and that these lines provide adequate capacity to meet the needs of the anticipated uses. You therefore have made assurance that these lots can physically be developed. There are many sound and creative ways to provide these services which could involve a wide variety of engineering solutions. Some are beneficial to the long term growth of the city, some are not. Determining the specific design of a sewer system is not the charge of the planning board. The public works department, in their interpretation of city policy and proper engineering techniques will determine that. Staff continents concerning the questions raised by Mr. Kalvig about the overall approach that the staff and planning board are taking relative to this: PUD review: The vast majority of -the information provided by Mr. Kalvig is generally historical staff reports,.n-iinutes and previously published :information As you read the information please note that Mr. Kalvig highlights in yellow the comments or phrases of concern that he. wishes to raise. There are 2 .pieces of new information attached. Tab 1., the cover letter from Mr. Kalvig wherein he lists his concerns and tab 21, a letter from Bruce Lutz who states that the level of information provided for landscaping is significantly lacking. Staff would point out that the issue raised by Mr. Kalvig that the PUD process is flawed because there is such a lack of information in the PUD staff report and application is really a matter of scale. Staff explained at the March 12 planning board hearing that the PUD application you are reviewing includes two existing lots totaling 7.6 acres and zoned B-5 (Industrial -Business). The applicants have stated that an auto dealership will be located on one of the lots with the other lot accommodating another auto dealership or similar use. The purpose of the PUD overlay zoning placed on the two lots upon annexation was to provide, in part, a coordinated development pattern that reduces business costs and increases small business opportunities. To that end, for these two lots the planning staff is recommending a shared approach on Highway 93, similar landscaping and bike trail development along Highway 93 and improvements to Lower Valley Road. There is no subdivision of land occurring. Water and sewer abut the lots. Both lots have existing public access and comply with the existing zoning. The PUD examples provided in the binder under tabs 22 (Hutton Ranch Plaza), 23 (Valley Ranch), and 24 (Starling) were large scale development projects proposed on raw land that lacked all forms of public services and utilities. Consequently, the PUD review and associated subdivision review were very in- depth. Additionally, the entitlements awarded to the PUD developers were much more specific. A breakdown of the scope of each of the listed projects is as follows: • Hutton Ranch Plaza — The PUD permitted the construction of a commercial center that is located on 46 acres of farmland and allows the development of approximately 450,000 square feet of mixed retail, restaurants, specialty stores, a movie theater and hotel. With the completion of the Walmart store and soon to be completed Hilton Homewood Suites hotel the Hutton Ranch Plaza is largely built out. • Valley Ranch — The proposed PUD permits a variety of residential uses on the 80.7 acre project site which was previously farmland. Valley Ranch included 204 residential lots, 29 townhouse lots and a future assisted and independent living facility. The assisted and independent living facility would be located in the northwest corner of the site, encompassing approximately 4.6 acres and, as stated in the application, will come back before the planning board and city council as an amendment to the PUD when the developers are ready to proceed with development of the facility. • Starling — The Starling PUD project included approximately 640 acres and exists as a farm field. The city council approved the project permitting a mix of residential housing types along with commercial development on the site to be built out over 15 phases. The first phase includes a mix of single-family residential, townhouse, multi -family and commercial lots on 63.3 acres. Specifically, the first phase includes 99 single family lots, 98 townhouse lots, 7 lots designated as multi -family lots and 32 lots designated as commercial lots. The primary land use will be residential with the commercial component comprising of approximately 60 acres or 9% of the overall project site. The Starling PUD would allow upwards of 3,000 housing units when fully built out. The proposed PUD is obviously not of the same scope with regards to size of land or potential commercial square footage or existing availability of services and utilities. The PUD before you is more akin to the Hilton Hotel PUD, Eastside Brick PUD and Kalispell Regional Medical Center PUD. The planning board should also note that the PUD.overlay zoning is still in place for the remaining lands on the east and south of the 7.6 acre PUD project you are currently reviewing. This mixing of a full ,PUD application and PUD overlay is permitted under section 27.19.020(2) which states in part, "Within any PUD application it is possible to incorporate one or both of the categories listed below (a) PUD Full Application (b) PUD Placeholder Application " Recommendation: Move the project off the table for discussion and consider the planning department's recommendation to conditionally approve the PUD project. mDr*Montana Department of Transportation Michael T. Tooley, Director 2701 Prospect Avenue Steve Bullock, Governor PO B 201001 March 19, 2013 Helena MT 59620-1001 Sean Conrad, Kalispell Planning Department is 201 1st Avenue East j Kalispell, MT 59901 MAR 2 0 2013 Subject: Gardner Two Lot PUD - Kalispell - US 93 - RP 106.E Initial Comments Dear Sean, The Montana Department of Transportation (MDT) staff has reviewed the information you forwarded on the Gardner Two Lot PUD (Glacier VW) development. We have the following comments: US 93 is under the jurisdiction of MDT. MDT requests a complete Traffic Impact Study (TIS) for this two lot development and for the full build out of the property. This will allow for the review of potential imparts to US 93 (N-5). The study needs to include analysis of not only the requested approaches but also the intersection of US 93 and Willow Glen Drive (U-6734). MDT needs a detailed site plan of the.d.evelopment that shows the existing and proposed approaches on both sides of US 93, Willow Glen Drive, and Lower Valley Road. MDT's concurs with the recommendations discussed in the City of Kalispell Growth Policy for this -area - the reduction of direct access to US 93 by using internal roads and frontage roads. • MDT has access control on Lower Valley Road extending 50 meters (164 feet) following the northern property boundary west for the property corner down Lower Valley Road. MDT must review and determine appropriateness of any approach within this area. Prior to any approaches being approved for the development, the development must provide the following: o A completed Approach Permit Applications) with Environmental Checklist(s) o A detailed site plan o A hydraulics report o Copies of any State, Federal, or Local agency permits required for the development. • If requested, MDT will conduct a scoping meeting with the developer to discuss the .design and all identified mitigations once the TIS is approved. The developer- is required to design, construct and fund all mitigations. MDT must review and approve any mitigation impacting MDT controlled roadways. Policy, Program & Performance Analysis Bureau Roil, Transit and Planning Division Phone: (406) 444-3423 An Equal Opportunity Employer TTY: (800) 335-7592 Fax: (406) 444-7671 Web Page: www.mdt.mi.gov If you have any questions concerning the requirements outlined in this letter, please contact me at (406)444-9456 or email at.jrileyPmt.gov. Sincerely, can A. Riley, P.E. Transportation Planning Engineer Policy, Program & Performance Analysis Bureau Copies: Ed Toays, P.E. - Missoula District Administrator James Freyholtz, P.E. - Kalispell Traffic Engineer Danielle Bolan, P.E. - Traffic Engineer Joe Zody, P.E. - Right -of -Way, Access Control Mike Tierney - Policy, Program & Performance Analysis Bureau Kim -Larson - APEC Engineering, Kalispell File GARDNER PLANNED UNIT DEVELOPMENT REQUEST STAFF REPORT #KPUD-13-01 KALISPELL PLANNING DEPARTMENT MARCH 6, 2013 A report to the Kalispell City Planning Board and the Kalispell City Council for a planned unit development (PUD) request on two commercial lots zoned B-5/PUD. The PUD would permit the development of the two lots for an auto dealership or similar use. A public hearing is scheduled before the planning board on March 12, 2013, in the Kalispell City Council Chambers. The planning board will make a recommendation and forward a set of findings to the Kalispell City Council for final action. BACKGROUND INFORMATION: The two lots included in the PUD request were annexed into the city as part of a larger annexation in 2008. The annexation request included 9 tracts of land totaling 81.6t acres on the east side of Highway 93 South. The city council annexed the 9 tracts of land and approved a zoning district over all 9 tracts of B-5 (Industrial -Commercial) zoning and a PUD placeholder. The council included the PUD placeholder to allow the developer to enter into a development agreement with the city, binding the property to a future PUD application. At the time of annexation the property owners did not have any immediate plans for development of the 9 tracts of land. The PUD placeholder did not require the developer to provide any application materials or development plans and the developer did not receive any entitlements other than a commitment between the city and the developer that prior to development of the individual properties, the developer would submit for review and approval a full PUD application as required by the zoning ordinance. The city council approved the PUD placeholder because the council determined there was a need to support a cohesive design for lots zoned with the B-5 zoning. Future development approved through the PUD process was also found to be in accordance with the following goal from Chapter 4, goal 1 of the Kalispell Growth Policy which states, "Encourage the development and growth of prosperous commercial and industrial districts, each with a viable mix of businesses, suitable infrastructure, and a coordinated development pattern that reduces business costs and increases small business opportunities." The owners of the two tracts requesting the PUD approval, Volkswagen Real Estate and Gardner Investments, are proposing a Volkswagen dealership on one lot (Parcel A) with the intention of attracting similar or complimentary businesses to the auto dealership on the second lot (Tract 2). A. Owner: Volkswagen Real Estate LLC (Parcel A) PO Box 1217 Whitefish, MT 59937 (406) 863-2511 Gardner Investments LLC (Tract 2) PO Box 958 Kalispell, MT 59903 Technical Assistance: APEC Engineering, Inc. 111 Legend Trail Kalispell, MT 59901 (406) 755-1333 B. Location and Legal Description of Property: The two tracts of land included in the PUD request are located at the southeast corner of the intersection of Highway 93 South and Willow Glen Drive. The two tracts of land can be legally described as Parcel A of Certificate of Survey # 19299 and Tract 2 of Certificate of Survey #6628 located in the SW 1/4 of the NW 1/4 of Section 28, Township 28 North, Range 21 West, P.M.M., Flathead County, Montana. C. Existing Land Use and Zoning: Both tracts of land are currently undeveloped. Two billboards are located on Parcel A and will be removed when the Volkswagen dealership begins construction. Both lots (Parcel A and Tract 2) are zoned B- 5/PUD. The B-5 zoning is a commercial/industrial zoning district intended primarily to accommodate a variety of business, warehouse, and light -industrial uses and incorporating these uses into an integrated design for compatibility. Compatibility issues may be addressed through development of an industrial - commercial park development or through a planned unit development (PUD) overlay zoning district. Such uses would typically not create objectionable characteristics (such as dirt, noise, glare, heat, odor, smoke, etc.) which extend beyond lot lines. The B-5 zoning district is primarily located near major arterials or rail services. This zoning district would typically be found in areas designated as industrial or urban mixed use on the Kalispell Growth Policy Future Land Use Map. 2 Figure 1: Aerial photo of the project site and the immediate area D. Adjacent Land Uses and Zoning: North: Single-family residential; County R-1 zoning, NW - Toyota Dealership; City B-2 South: Radio station; County I-1H zoning East: Professional office; County I-1H zoning Vacant land; City B-5/PUD zoning West: Gas station; City B-2 zoning E. General Land Use Character: The general land use character of the Highway 93 South corridor is commercial and light industrial uses concentrated along Highway 93. The lands adjacent to the two tracts of land in this PUD request include a mix of residential homes, professional office and radio station. F. Utilities and Public Services: Sewer: City of Kalispell Water: City of Kalispell 3 Refuse: Private contractor/City of Kalispell Electricity: Flathead Electric Cooperative Gas: Northwestern Energy Telephone: CenturyLink Schools: School District #5 Fire: Kalispell Fire Department Police: Kalispell Police Department EVALUATION OF THE PLANNED UNIT DEVELOPMENT PROPOSAL: Nature of the Request: This is a request for a planned unit development (PUD) zoning district on approximately 7.6 acres of land which is currently undeveloped. The PUD zoning would permit the development of the two existing tracts of land, one for a Volkswagen dealership and the other for another auto dealership or other complimentary use. The owners are not requesting any deviations from the zoning ordinance at this time but future development on lands zoned B-5/PUD could request deviations from the zoning or subdivision regulations. Criteria for the Creation of a Planned Unit Development (PUD) District The following information and evaluation criteria are from Sections 27.19.020(3) and 27.19.020(4), of the Kalispell Zoning Ordinance. The intent of the planned unit development district is to serve as an overlay zoning district. The district functions in concert with one or more of the underlying zones to provide a comprehensive, integrated development plan which will serve to modify the underlying zone and, where appropriate, subdivision standards with the intent of providing flexibility of architectural design and density as well as providing the option to mix land uses and densities while preserving and enhancing the integrity and environmental values of an area. Review of Application Based Upon PUD Evaluation Criteria: The zoning regulations provide that the planning board and city council shall review the PUD application and plan based on the following criteria: A. The compliance of the proposed PUD with the city growth policy and in particular the density and use policies of the plan; The proposed PUD would permit development on the two tracts of land for an auto dealership or similar type of business. The property is zoned for commercial and industrial type uses which an auto dealership is one of the anticipated land uses. The scale and density of commercial development proposed on the project site is in accordance with the B-5 zoning of the property. No residential development is anticipated with the current PUD proposal. The Kalispell Growth Policy Future Land Use Map designates the 7.6 acre project site included in this PUD application as urban mixed use. In 2008 the city council a] amended the Highway 93 South neighborhood plan in the city's growth policy. The proposed PUD design meets the following policies of the Highway 93 South neighborhood plan Policy 18.The following design standards are intended to enhance the gateway entrances to Kalispell b. Areas planned for commercial development along Highway 93 should occur as an integrated development utilizing and enhancing the property back from the highway as opposed to occurring as a shallow linear strip. Significant individual business highway exposure, individual access points, and pole signage would not be the norm. The proposed PUD design includes significant landscaping along the highway between the edge of pavement and the use of the property as an auto dealership or complimentary use. The plan proposes one access onto Lower Valley Road and a shared access onto Highway 93, eliminating the need for a separate access for both lots. e. Four sided architecture should be the norm for all properties abutting the gateway entrances. Information included with the application notes the proposed Volkswagen dealership `presents a simple, modern well defined outline of the building that embodies the proud engineering heritage that Volkswagen owners have come to trust." Architectural features and a combination of exterior colors will be provided to all four sides of the new dealership. This can be anticipated for the future building or dealership located south of the Volkswagen dealership on Tract 2. The city's architectural review committee reviewed the Volkswagen building elevations submitted with the PUD application. The committee noted that the architect should consider easing the transition between the showroom on the west side of the building with the service area on the east side of the building. The architect acknowledged the committee's recommendation and would be making some modification prior to submitting a building permit. f. Billboards should be prohibited in the commercial and residential zones. Existing billboards in these zones should be considered a primary use. Such existing billboards should be phased out in these zones under the following schedule: at the end of their current lease or when another primary use is proposed on the same parcel or tract of land. Parcel A, the location of the Volkswagen dealership, has two billboards on the property as shown on the PUD layout plan. As of the writing of this report, the billboards are still on the property. A recommended condition of approval will require the billboards to be removed prior to the issuance of a building permit for the dealership. 5 With the city B-5 zoning making up a majority of the zoning on the east side of Highway 93 between the light at the alternate route and Cemetery Road, relocation of these two billboards would not occur on the project site. The PUD application notes that the exact development for the tract of land immediately south of the Volkswagen dealership, Tract 2, has not been determined. The owners of the lot are considering possibly another dealership or a supporting business to the Volkswagen dealership such as an oil service facility or carwash. The B-5 zoning permits a wide range of land uses including but not limited to retail business, restaurants, professional offices, laboratories, hotels and truck terminals. Due to the unknown nature of the use on Tract 2, this PUD would restrict the use of the lot to land uses such as an auto dealership, professional office or commercial use complimentary to the Volkswagen dealership. This does not restrict the property owners from proposing a land use outside of these narrow parameters however more detailed information such as a site layout, building elevations and access to the site and adjacent properties would need to be provided before the city could permit such a use on the land. B. The extent to which the PUD departs from the underlying zoning and the reasons why such departures are or are not deemed to be in the public interest, and the mitigating conditions that the PUD provides to address the deviations; The requested PUD will not deviate from the zoning regulations. C. The extent to which the PUD departs from the subdivision regulations (if subdivision is anticipated) and the public works standards for design and construction applicable to the subject property, the reasons why such departures are deemed to be in the public interest, and the mitigating conditions that the PUD provides to address the deviations; The requested PUD will not deviate from the subdivision regulations or public work's standards for design and construction. D. The overall internal integrity of the PUD including the appropriate use of internal design elements, the use of buffers between different land uses, the use of transitions between uses of greater and lesser intensity, the use of enhanced design features to provide connectedness for both vehicle and pedestrian traffic throughout the PUD and the use of innovative and traditional design to foster more livable neighborhoods; The proposed PUD includes two existing tracts of land located at or near the southeast intersection of Highway 93 and Willow Glen Drive. The proposed uses for the properties, an auto dealership(s) and other complimentary uses, have been designed to work together utilizing the same access off of Highway 93. No buffer is necessary for the surrounding uses which include a professional office to the east and radio station to the south. 0 The focus of this proposed PUD zoning request is on the two lots located in the northwest corner of land under a PUD overlay zoning. The total area of land under the PUD zoning is comprised of several lots totaling approximately 53.4 acres. The land area outside of the two lots included in this PUD request will need to be master planned in the future. The exact timing of additional development on this land has not been determined however when a future development is proposed, the owner or owners of the remaining portions of land identified in Figure 2 will need to provide a detailed PUD layout plan. The owners have included a conceptual layout for this area with this PUD application. The concept plan is adequate at this point because future uses and/or lot sizes are unknown at this time and a large portion of the undeveloped property is encumbered with radio tower easements. Until the radio towers are removed and the associated easements are abandoned, much of the land under the PUD overlay is unavailable for development. 7 Figure 2: Remaining undeveloped land outside of the two lots included in this PUD proposal The layout identifies the existing approaches onto Highway 93, a future road connection between Lower Valley Road and an existing roadway on the south end of the land area and the approximately location for a regional storm water detention area to serve future development in this area. Prior to approving any additional developments on the land shown in Figure the PUD application will need to include a detailed PUD layout plan for the area that addresses the following: • Conceptual design of a frontage road parallel to Highway 93 and identifying which existing approaches along Highway 93 will be used and the nature of the approach (i.e. right-in/right-out only, full movement approach or 3/4 movement approach). • Identify the area and approximate size of a regional storm water detention area. • Approximate locations of north/south streets and east/west streets serving the area and the type of streets proposed (i.e. local street or collector street). • A conceptual design for lots within the area that identifies the location of buildings to the adjacent street and their associated parking lots. Including the above listed elements in the future PUD design of the land identified in Figure 2 will comply with the following goals and policies of the Kalispell Growth Policy: Highway 93 South Corridor Growth Policy Amendment Goals: 2. EXPANSION OF COMMERCIAL DEVELOPMENT SOUTH OF CEMETERY ROAD/LOWER VALLEY ROAD NEEDS TO BE ADDRESSED UNDER A PLANNED UNIT DEVELOPMENT IN ORDER TO ADEQUATELY ADDRESS VEHICULAR AND PEDESTRIAN ACCESS, SIGNAGE, SETBACKS, AND OTHER ISSUES RELATING TO PROTECTING AND PRESERVING THE COMMUNITY ENTRANCE WAY TO KALISPELL. 3. PRESERVING THE FUNCTIONALITY OF THE INTERSECTION OF HIGHWAY 93 AND THE HIGHWAY 93 BYPASS SHOULD BE A PRIORITY._ 6. FREE FLOWING TRAFFIC ON HIGHWAY 93 SHOULD BE MAINTAINED AND NEW DEVELOPMENT SHOULD INCORPORATE DESIGN AND TRAFFIC FEATURES THAT WILL ELIMINATE THE NEED FOR PRESENT OR FUTURE TRAFFIC SIGNALS BETWEEN FOUR CORNERS AND HIGHWAY 82. 7. A GRID STREET SYSTEM SHOULD BE ESTABLISHED AS NEW DEVELOPMENT OCCURS. Policies: 3. Avoid a pattern of one lot deep linear commercial and industrial development along the Highway 93 South Corridor•, instead encourage E development patterns that extend horizontally back from the highway creating commercial or industrial centers and parks. 4. Require high quality development as it relates to the provision of services, utilities, facilities and amenities. 5. Additional accesses onto Highway 93 shall be limited and a grid street system shall be developed when possible. 6. Frontage roads shall be developed as part of a grid street system to avoid additional accesses onto Highway 93. 7. Provide alternative north/south roadways parallel to Highway 93 on both the east and west sides of the highway. 18. The following design standards are intended to enhance the gateway entrances to Kalispell a. Access control should be the norm along the 93 corridors. b. Access should be coordinated so as to allow only collector or arterial streets to intersect Highway 93. The judicious use of right -in right -out approaches, frontage roads and good internal development street design should be the rule to reduce or eliminate the need for direct access onto major gateway roads. Pedestrian connectivity in the area of the two lots in the proposed PUD request is limited at this time. Sidewalks are located along Highway 93 however on the east side of the highway they end immediately north of the proposed Volkswagen dealership at the intersection of Highway 93 and Willow Glen Drive. To provide pedestrian and bicycle connections to the proposed developments, the applicants will be extending a pedestrian/bike trail from the intersection of Highway 93 and Willow Glen Drive south along Highway 93. The PUD layout plan calls for an 8 foot bike trail along Highway 93. The bike trail is proposed on the outer edge of the right-of-way, creating a separation from the adjacent highway of approximately 50 feet. Along Lower Valley Road the PUD layout plan proposes a 5-foot sidewalk which would connect to the bike trail along Highway 93 in the area of the north west corner of Parcel A. The Parks and Recreation Department has reviewed the proposed bike trail plans and is recommending the 5-foot sidewalk along Lower Valley Road be widened to accommodate bicycles as well. The Department is also recommending the trail along Lower Valley Road be extended to the intersection of Lower Valley Road and Willow Glen Drive. Currently, an 8-foot bike trail is located along Willow Glen Drive but ends at FFA Drive, approximately 1/2 mile north of the Volkswagen dealership site. Both the Kalispell Area Transportation Plan and the Kalispell Parks and Recreation Master Plan identify the extension of the Willow Glen bike trail south to the intersection of Willow Glen Drive and Lower Valley Road. Adjusting the proposed PUD layout plan to provide for a trail connection at Willow Glen Drive and Lower Valley Road would serve as the continuation of the future planned trial section. 10 The proposed bike/pedestrian trail on the PUD layout plan and the recommended modifications of the trail plan by the Parks and Recreation Department comply with the following two goals in the Highway 93 South Corridor Growth Policy Amendment of the Kalispell Growth Policy: Goal: 15. PROVIDE FOR THE ONGOING ACQUISTION, CONSTRUCTION AND MAINTENANCE OF PARKS, BIKE AND PEDESTRIAN TRAILS AND OTHER RECREATIONAL FACILTIES. 16. PEDESTRIAN AND BIKE TRAILS SHOULD BE INCORPORATED INTO NEIGHBORHOOD AND CONNECT WITH OR PROVIDE FOR FUTURE CONNECTION WITH EXISTING OR FUTURE TRAILS. E. The nature and extent of the public parks and common open space in the PUD, the reliability of the proposal for maintenance and conservation of these areas and the adequacy or inadequacy of the amount and function of the parks and open space in terms of the land use, densities and dwelling types proposed in the PUD; The proposed PUD would permit an auto dealership(s) and complementary businesses such as a car wash or oil service business to locate on the two tracts of land. No development of permanent housing is proposed and therefore no increase in resident population will occur. Without an increase in resident population the need for park or common open space is not required. Included with the PUD application the owners have submitted a layout plan which identifies those areas to be landscaped. Landscaping is proposed both on the private property and the adjacent right-of-ways for Highway 93 and Lower Valley Road. The adjacent property owners will be required to maintain the landscaping as part of their development approvals. F. The manner in which the PUD plan makes adequate provision for public services, provides adequate control over vehicular traffic and furthers the amenities of recreation and visual enjoyment; 1. Public Services Police and Fire Services The two properties included in the PUD request were annexed by the city council in 2008. Once annexed the properties receive Kalispell police and fire services. Future development on the properties will be required to receive a building permit prior to construction. As part of the building permit review police and fire department official's review and comment on the building permit plans to insure both departments can adequately enter and serve the development. Water and Sewer There are existing water and sewer mains located along Highway 93. The owners of both properties intend to connect to city services with service lines and/or main 11 lines installed per Public Works standards. Initial discussions between the engineering firm representing the Volkswagen dealership and the Public Works Department have included constructing a gravity service line to serve the Volkswagen dealership with the possibility of installing a regional lift station in an area east of the Volkswagen dealership property to serve future development on Tract 2. The regional lift station would serve development on Tract 2 and future development to the south and east of this tract. A recommended condition of approval will require information for water and sewer main connections and/or extensions are provided to the Public Works Department prior to the issuance of a building permit for the Volkswagen dealership. The approved plans would then be required to be installed and inspected prior to the dealership receiving a certificate of occupancy. Prior to issuance of a building permit on Tract 2, the owner or developer would need to submit similar information to the Public Works Department and include an analysis of whether a regional lift station is warranted at that time. Storm water Individual storm water facilities are proposed for each of the two lots included in the PUD request. The PUD layout plan indicates a potential storm water facility south of the proposed Volkswagen dealership. For Tract 2, the storm water facility is less defined at this point but could be located on the north or south boundaries of the lot. Prior to issuance of a building permit for either lot a storm water management plan will be required to be reviewed and approved by the Public Works Department. On -site storm water management facilities will need to be installed per the approved plan prior to the issuance of a building permit. Any off - site storm water management facilities (if applicable) would need to be in place prior to the issuance of a certificate of occupancy. Future development south and east of the two lots included in this PUD request will most likely utilize a regional storm drainage detention facility. The exact location and specifications of such a facility will be a recommended condition of approval prior to permitting further development in the area on land under the PUD overlay zoning. 2. Control Over Vehicle Traffic Access to the two lots in the PUD request includes Highway 93 and Lower Valley Road. Parcel A, the location of the Volkswagen dealership, has access to Lower Valley Road on its north property boundary and Highway 93 on its west property boundary. The other lot, Tract 2, has access to Highway 93 on its west property boundary. Highway 93 is a major arterial within the city's transportation network. The highway is a four lane road with a center turn lane, 8-foot shoulders and curbing along its frontage of the two lots. The posted speed limit for this section of the highway is 55 mph. The Kalispell Area Transportation Plan indicates daily traffic volumes along this section of the highway at approximately 19,000 vehicles (Figure 3-11). The transportation plan indicates future projected traffic volumes by 2030 could be approximately 31,000 vehicles per day (Figure 3-13). The PUD layout plan shows both lots sharing an existing approach onto Highway 93. A shared approach and maintenance agreement between the two lots for the existing 12 approach has been included with the PUD application. A copy of the PUD application was sent to the Kalispell office of the Montana Department of Transportation (MDT). Discussion between city staff and MDT staff resulted in the requirement of the owners of the two lots to obtain an approach permit from MDT. Although an approach exists onto Highway 93, MDT requires an approach permit when the land use changes, in this case the land is going from a vacant field to an auto dealership. A recommended condition of approval will require the owners of the two lots to obtain the appropriate permit for the approach onto Highway 93 and receive a sign off from MDT on conditions or requirement attached to the approach permit. The permit and conditions sign off from MDT will be required prior to the city issuing a certificate of occupancy on the building. The use of the existing approach onto Highway 93 for the two lots included in this PUD request will most likely be granted by MDT based on the limited amount of development on this section of the highway and the intensity of vehicle traffic anticipated on the two lots. Further development in this area, whether immediately south of this PUD request or on the west side of the highway opposite of this development, will most likely require the use of a frontage road as discussed in section D of this report. Lower Valley Road provides direct access to Parcel A, the location of the Volkswagen dealership. Lower Valley Road, along the frontage of Parcel A, varies in width from approximately 30, face of curb to face of curb, from its intersection with Willow Glen Drive for a distance of approximately 360 feet east. At this point the curbing ends and the roadway narrows to a travel width of approximately 22 feet with storm water ditches on either side of the road. The Kalispell Area Transportation Plan does not provide any traffic volumes for Lower Valley Road however the plan does identify Lower Valley Road as having a functional classification of a minor arterial (Figure 2-1). The transportation plan defines a minor arterial street as follows: Interconnects with and augments the Principal Arterial system. It also provides access to lower classifications of roads on the system and may allow for traffic to directly access destinations. They provide for movement within sub -areas of the city, whose boundaries are largely defined by the Principal Arterial road system. They serve through traffic, while at the same time providing direct access for commercial, industrial, office and multifamily development but, generally, not for single-family residential properties. The purpose of this classification of road is to increase traffic mobility by connecting to both the Principal Arterial system and also providing access to adjacent land uses. Posted speed limits on minor arterials typically range from 25 mph to 55 mph. The portion of Lower Valley Road, which fronts Parcel A, is within the city limits falling under the jurisdiction of the Kalispell Public Works Department. After reviewing the proposed PUD the Public Works Department is recommending improvements to Lower Valley Road with the exact street design improvements to be determined by a traffic analysis for the entire undeveloped property under the 13 PUD overlay zoning. This area includes both lots under this PUD request and land to the south and east comprising approximately 55 acres. Based on acceptance of the traffic analysis, the developer of the Volkswagen dealership will be required to upgrade Lower Valley Road, as it fronts the property, to the identified street standard. The south side of Lower Valley Road fronting Parcel A includes about half a dozen mail boxes serving residents on the north side of Lower Valley Road. During construction activities to Lower Valley Road the developer will need to work with the postal service to establish a temporary (if needed) mail box location and reinstall the mail boxes after upgrades to the road are complete. 3. Recreational Amenities No recreational amenities are required as part of the proposed PUD plan. Recreational amenities are needed in residential developments or mixed commercial/residential developments where the project includes a new resident population. This is not the case with the proposed PUD plan. 4. Visual Enjoyment The proposed PUD project includes development of two lots, one of which will be a Volkswagen dealership and the other lot may be another dealership or similar type of use. The proposed PUD layout plan and application indicate the owners or developers of both lots will be landscaping their developments both on -site and out to the edge of the adjacent right-of-ways. The end result will look much like the Toyota dealership north of the PUD site which includes a combination of manicured grass, shrubs and trees along Highway 93 giving a very positive visual impression as the travelling public enters the city. The proposed developments will be extending this concept and adding to the quality of the built environment along this section of the highway. G. The relationship, beneficial or adverse, of the PUD plan upon the neighborhood in which it is proposed to be established in concert with the underlying zone; The proposed PUD would permit an auto dealership to occupy the northern lot with the anticipation of another auto dealership or complimentary use to occupy the southern lot. The proposed layout provides for adequate vehicle access to the site via Lower Valley Road and Highway 93. The proposed uses of the land for an auto dealership or other similar uses should not conflict with surrounding land uses. Residential homes are located to the north of the project site, on the north side of Lower Valley Road. These homes could expect to see an increase in traffic on Lower Valley Road however commercial and light industrial development has been anticipated on land on the south side of Lower Valley Road for years. Prior to annexing into the city the two tracts of land had an industrial zoning district in the county. The industrial zoning was based on a previous neighborhood plan adopted by both the city and county in 1993. At that time Kalispell had a city -county master plan and associated map that provided guidance for development both within city limits and up to four miles around the 14 city. In 2008 the city council revised the growth policy and land use map for this area permitting commercial as well as industrial land uses for the area. The current B-5 zoning is a result of this land use change. H. In the case of a plan which proposes development over a period of years, the sufficiency of the terms and conditions proposed to protect and maintain the integrity of the PUD; Part of the requirements of a PUD is that the developer enters into an agreement with the City of Kalispell to adequately insure that the overall integrity of the development, the installation of required infrastructure, architectural integrity and proposed amenities are accomplished as proposed. A recommended condition of approval for the PUD would require this agreement be in place prior to the issuance of a building permit on either one of the lots. I. Conformity with all applicable provisions of this chapter. No other speck deviations from the Kalispell Zoning Ordinance can be identified based upon the information submitted with the application. 15 RECOMMENDATION Staff recommends that the Kalispell City Planning Board and Zoning Commission adopt staff report KPUD-13-1 as findings of fact and recommend to the Kalispell City Council the PUD overlay zoning district be approved subject to the conditions listed below: CONDITIONS OF APPROVAL General Conditions: 1. The development of the two tracts of land (Parcel A and Tract 2) shall substantially comply with the following site plan and elevations submitted as part of the Planned Unit Development application: A. Site Layout Plan B. Building footprint site plan C. Elevations of the proposed Volkswagen dealership. 2. The permitted and conditional uses for Parcel A and Tract 2 are restricted to an auto dealership, professional office or commercial use complimentary to an auto dealership. 3. The property owner shall maintain the landscaping on their property and from their property line to the adjacent street or highway. 4. All utilities shall be placed underground. 5. Prior to further development on land under this B-5/PUD the owner(s) shall submit a detailed PUD layout plan for the area that addresses the following: • Conceptual design of a frontage road parallel to Highway 93 and identifying which existing approaches along Highway 93 will be used and the nature of the approach (i.e. right-in/right-out only, fullmovement approach or 3/4 movement approach). • Identify the area and approximate size and specifications of a regional storm water detention area. • Approximate locations of north/south streets and east/west streets serving the area and the type of streets proposed (i.e. local street or collector street). • A conceptual design for lots within the area that identifies the location of buildings to the adjacent street and their associated parking lots. 16 Prior to the issuance of a building permit: 6. A development agreement shall be drafted by the Kalispell City Attorney between the City of Kalispell and the developer outlining and formalizing the terms, conditions and provisions of approval. The final plan as approved, together with the conditions and restrictions imposed, shall constitute the Planned Unit Development (PUD) zoning for the site that shall be completed and signed by the city and owner prior to the issuance of a building permit. 7. The billboards on Parcel A shall be removed. 8. A landscape plan shall be submitted to the Parks and Recreation Department for review and approval. The landscape plan shall include an irrigation plan and specify tree and shrub type and size at the time of planting for the parking areas, areas around the building and adjacent right-of-ways. Note: Based on the eventual street design for Lower Valley Road the street trees may be required to be located on private property due to the lack of an adequate boulevard for tree survival. 9. A pedestrian/ bike path plan shall be provided to the Parks and Recreation Department and Public Works Department for review and approval. The plan shall show a connection to the intersection of Lower Valley Road and Willow Glen Drive and include a bike trail along Lower Valley Road. Note: An asphalt bike trail shall have a minimum width of 10 feet; a concrete bike trail shall have a minimum width of 8 feet. 10. A traffic analysis shall be submitted to the Public Works Department for review and approval prior to building on Parcel A. The traffic analysis shall account for future vehicle traffic on the approximately 55 acres of this PUD and determine the improvements required to Lower Valley Road based on the anticipated development and traffic volumes. 11. The property owner of Parcel A shall improve the property's frontage along Lower Valley Road in accordance with the approved traffic analysis. All improvements shall be completed in accordance with the City of Kalispell's Standards for Design and Construction and Montana Public Works Standards; and shall be certified by an engineer licensed in the State of Montana. All work shall be reviewed and approved by the Kalispell Public Works Department prior to construction. Note: Prior to work on Lower Valley Road the property owner or developer shall contact the postal service regarding the temporary relocation of mail boxes along the section of Lower Valley Road receiving work. After work is completed the mail boxes shall be reinstalled on same or better stands. 12. Water and sewer main extensions shall be reviewed and approved by the Kalispell Public Works Department prior to installation. 13. The developer shall submit to the Kalispell Public Works Department for review and approval a storm water management plan that meets the requirements of the current city standards for design and construction. The approved storm water management plan for on -site facilities shall be completed prior to the issuance of a building permit. 17 14. The property owner of Tract 2, prior to connecting to the city's sewer main, shall submit an analysis on the need for a regional lift station for the area. Prior to the issuance of a certificate of occupancy: 15. A certification from an engineer licensed in the State of Montana shall be submitted to the Public Works Department stating that all water and/or sewer lines have been installed per the approved plan. 16. Any off -site storm water management facilities shall be installed per the approved plan. 17. All landscaping shall be installed per the approved landscape plan. 18. The bike trails shall be installed per the approved plan. 19. A certification from an engineer licensed in the State of Montana shall be submitted to the Public Works Department stating that the improvements to Lower Valley Road have been built as designed and approved. 20. The property owners of Parcel A and Tract 2 shall obtain the appropriate permit for the approach onto Highway 93 and receive an approval from MDT on the completion of conditions or requirements attached to the approach permit. The approved approach permit and MDT approval shall be submitted to the Kalispell Planning Department. IN Planning Department 201 1st Avenue East Kalispell, MT 59901 Phone: (406) 758-7940 Fax: (406) 758-7739 www.kalispeU.com/ APPLICATION FOR PLANNED UNIT DEVELOPMENT (PUD) PROJECT NAME GARDNER 2-lot PUD 1. 2. 3. NAME OF APPLICANT: _Gardner Investments LLC (tract 1 owner) MAIL ADDRESS: P.O.Box 958 CITY/STATE/ZIP: Kalispell, Mt 59903 PHONE: NAME AND ADDRESS OF OWNER IF DIFFERENT THAN APPLICANT: 4. NAME: _Volkswagen Real Estate LLC. - (tract if owner) 5. MAIL ADDRESS: P.O. BOX 1217 6. CITY/STATE/ZIP: _Whitefish, MT 59937_ PHONE: _406 863 2511_ 7. TECHNICAL ASSISTANCE: -APEC Engineering Inc._ _ 8. MAIL ADDRESS: -111 Legend Trail _ 9. CITY/ STATE/ ZIP:_KALISPELL, MT, 59901 PHONE:_406 755 1333_ If there are others who should be notified during the review process, please list those. Check One: _X_ Initial PUD proposal Amendment to an existing PUD A. Property Address: 2915 HWY 2 South, Kalispell, MT B. Total Area of Property: _7.65 acres C. Legal description including section, township 8s range: -Southwest `/a of the Northwest'/ of Section 28, Township 28 North, Range 21 West, P.M., M., Flathead County, Montana, _ D. The present zoning of the above property is: _B-5/ PUD Placeholder 1 E. Please provide the following information in a narrative format with supporting drawings or other format as needed: a. An overall description of the goals and objectives for the development of the project. Site development of the two lot Planned Unit Development (PUD) as proposed are tract land properties adjacent to Highway 93 and Lower Valley Road located at the southerly gateway to the Kalispell community, see attached CP-1. The two tracts of land are ideally suited to attract commercial entrepreneurial investment that complies with current zoning and perpetuates high quality design and architectural standards within the area. Glacier Volkswagen will help set the tone for future commercial business development within the area as a continuation of the current business development to the north. The new dealership will compliment the Kalispell Toyota Dealership across Willow Glen and provide the potential to form a row of similar related businesses. The momentum achieved by establishing an attractive Volkswagen dealership essentially acts as a catalyst for the entire area as represented by the Future Development Conceptual Layout Plan, see attached CP-2. Should the demand warrant and as inquiries improve the desired property size and amenities it is likely a new commercial subdivision with Planned Unit Development designation will be submitted thereto the City of Kalispell Planning Department for review and consideration. At this point future lot size and subsequent layout with provided amenities are heavily dependent on future interested parties. Access for the PUD will be served from existing approaches from each traveled public way adjacent to the property and as provided during the most recent highway improvement project. It should be noted that the public water and sewer facilities will be sized for the conceptual development as shown therein and not just the Two Lot PUD. The development potential for coherent mixed - use commercial properties of significant size and broad in nature will allow for numerous future site development opportunities given the neighboring property usage of businesses such as radio stations, auction facilities, equipment dealerships, and transfer and storage facilities. It is the owner's intent, as the overall area is developed, to provide additional access road(s) through the area as required to facilitate vehicular traffic in a manner which minimizes impacts on Hwy. 93. Further development of nearby property will be desired though it will be clear that the two -lot PUD as submitted is independent from further required area development. 2 b. In cases where the development will be executed in increments, a schedule showing the time within phase will be completed. Area developed as shown supporting the VW dealership will be undertaken once site and architectural plans are further developed and approved by the City of Kalispell. Further development of the VW dealership lot beyond what is currently shown will occur once a supporting or similar business can be pursued. A defined timeframe on when this can occur cannot be developed at this time. With the development of the VW Dealership in place and operational interest in similar and supporting business such as another dealership, oil service facility or a carwash may be incorporated and proposed upon. An equal or ancillary business of would most likely be proposed to complete build out of the parcel. C. The extent to which the plan departs from zoning and subdivision regulations including but not limited to density, setbacks and use, and the reasons why such departures are or are not deemed to be in the public interest; The plan as proposed herein of an automobile dealership meets B5 zoning as defined by the City of Kalispell zoning regulations. Future development plans of the properties may require a deviation within the zoning regulations. At this time one is not required. d. The nature and extent of the common open space in the project and the provisions for maintenance and conservation of the common open space; and the adequacy of the amount and function of the open space in terms of the land use, densities and dwelling types proposed in the plan; Open space will be inherently needed for landscaping requirements, storm drainage detention and infiltration of storm water to the site as commercial facilities and parking is required. As further development of the area is sought each site will develop and maintain bioswale and similar overland storage type drainage facilities as written and required by the City of Kalispell Standards for Design and Construction. C. The manner in which services will be provided such as water, sewer, storm water management; schools, roads, traffic management, pedestrian access, recreational facilities and other applicable services and utilities. Access to Highway 93 will be full movement access from an existing shared approach placed between the parcels in review. Five paved approaches exist on the east side of highway 93 between the intersection at Cemetery Road and the road accessing the Mergenthaler Transfer property. Future development plans,. in accordance with the guidelines outlined by the Kalispell Growth Policy for the Hwy. 93 South Corridor, may include frontage roads, etc. but would need to be agreed upon as the parcels in question are developed. 3 Pedestrian access will be along Highway 93 via a proposed 8' asphalt bike path and along Lower Valley Road via a proposed asphalt 5' walking path. In coordination with the City of Kalispell Public Works, public facilitates will be extended to adequately serve the area for an array of development possibilities. Proposals and preliminary design have accounted- for the various likely development potentials. f. The relationship, beneficial or adverse, of the planned development project upon the neighborhood in which it is proposed to be established. The proposed development fits within the B5 zoning regulations, and in conjunction with the existing Toyota dealership will augment the "auto -row" concept master planned for the area. Two dealerships will likely excite further aligned interests. g. How the plan provides reasonable consideration to the character of the neighborhood and the peculiar suitability of the property for the proposed use. The current proposal herein requests development requests that comply with current zoning of the property. The proposal of an automobile dealership adjacent to a convenience store gas station and another automobile dealership will help maintain uniformity within the area. h. Where there are more intensive uses or incompatible uses planned within the project or on the project boundaries, how with the impacts of those uses be mitigated. Property development proposed herein on tract 1F and as intended by the second lot development of tract 1 is of lot development that complies with current zoning regulations though flexibility with said regulations may be requested while under the PUD development. As stated above the continuation of commercial development is anticipated whereby the uses are likely not significantly outside the zoning classification of B5. i. How the development plan will further the goals, policies and objectives of the Kalispell Growth Policy. Development within the south Kalispell business or industrial area under a planned unit development approach allows for continued review by the City of Kalispell Planning staff. This inherently provides the city with oversight that will help guide development potential within the area. j. Include site plans, drawings and schematics with supporting narratives where needed that includes the following information: (1). Total acreage and present zoning classifications; 7.65 acres/B5 (2). Zoning classification of all adjoining properties; B5- unzoned by city - (county property) (3). Density in dwelling units per gross acre; n/a M (4). Location, size height and number of stories for buildings and uses proposed for buildings; commercial in nature, multiple stories possible, (5). Layout and dimensions of streets, parking areas, pedestrian walkways and surfacing; see attached for PUD as included herein and future PUD of adjoining properties. Extensions of pathways are planned on public right of way for each developed adjacent to roadway improvement. (6). Vehicle, emergency and pedestrian access, traffic circulation and control; As proposed the 2 lot PUD includes two accesses per lot, tract 1 has one shared Highway 93 approach with southern tract and one Lower Valley Road approach. Tract 2 (south property) has the shared approach and a second approach to the south onto highway 93. The approach will be developed as part of the Volkswagen site development package. (7). Location, size, height, color and materials of signs; The 2 large existing billboard signs will be removed when development of each lot is approved. As proposed for the VW Dealership a pylon sign will be installed. See attached details for specifics. (8). Location and height of fencing and/or screening; none planned at this point. (9). Location and type of landscaping; see plan for developed lot. Mostly grass, trees and bioswale compatible grasses. Landscaping within Highway 93 and Flathead County rights of way are to be approved by the appropriate reviewing authority. (10) . Location and type of open space and common areas; Considerable open space/landscaping will be incorporated into the storm drainage overland filtration area. (11) . Proposed maintenance of common areas and open space; Open space within the lot and adjacent thereto which included county/mdot right of way will be maintained by the adjacent parcel owners. (12). Property boundary locations and setback lines; noted on plans, no deviations are requested. (13). Special design standards, materials and / or colors; Glass panels with white building border on face of building. White border around glass doors for each entry point. (14). Proposed schedule of completions and phasing of the development, if applicable; not applicable, no subdivision of land required within this submittal, as commercial business is attracted to these properties requested site development plans will be submitted to ensure compliance. (15). Covenants, conditions and restrictions; not applicable (16). Any other information that may be deemed relevant and appropriate to allow for adequate review. If the PUD involves the division of land for the purpose of conveyance, a preliminary plat shall be prepared in accordance with the requirements of the subdivision regulations. Please note that the approved final plan, together with the conditions and restrictions imposed, shall constitute the zoning for the district. No building permit shall be issued for any structure within the district unless such structure conforms to the provisions of the approved plan. The signing of this application signifies that the aforementioned information is true and correct and grants approval for Kalispell Planning staff to be present on the property for routine monitoring and inspection during review process. (Applicant Signature) (Date) 5 If the PUD involves the division of land for the purpose of conveyance, a preliminary plat shall be prepared in accordance with the requirements of the subdivision . regulations. Please note that the approved final plan, together with the conditions and restrictions imposed, shall constitute the zoning for the district. No building permit shall be issued for any structure within the district unless such structure conforms to the provisions of the approved plan. The signing of this application signifies that the aforementioned information is true and correct and grants approval for Kalispell Planning staff to be present on the property for routine monitoring and inspection during review process. -?246- (Applicant Signature) R /r- 7 /--k (Date) rch 405-756-0354 office Sean Conrad, Senior Planner City of Kalispell Planning Department 201 1st Ave. East Kalispell, MT 59901 RE: Gardner Two Lot PUD application Tract 1F(parcel A of COS #19299), Tract 1 - (Tract 2 of COS #6628) SW 1/4 NW1/4 S28, T28N, R21W, PMM, Flathead County Dear Sean: ADE.-756-5592 faX 23 January, 2013 I have enclosed copies of exterior views of the schematic design for the proposed Glacier Volkswagen Dealership for the above noted 2 lot PUD currently under review. The design process between the Depratu Group and Volkswagen Corp. is proceeding and will be completed soon. The exterior views shown here meet the basic requirements from Volkswagen for the size and height of the approved building and general architectural expression. The west facade which faces Highway 93, (the side with the VW signage and entrance frames) represents the corporate architectural image of the Volkswagen White Frame Dealership. As such the design of this facade is rigidly defined by contractual agreement and cannot be changed. This is the showroom and major customer interaction space for the dealership. The actual exterior element or White Frame wrapping the facade is a pre -manufactured element that will arrive at the site and be affixed to the nearly completed superstructure. It presents a simple, modern well defined outline to the building that embodies the proud engineering heritage that Volkswagen owners have come to trust. It incorporates an internal illumination system that provides diffused and concealed indirect highlighting of the front facade. These systems have been installed in hundreds of communities with very strict lighting standards and I am confident that this will meet Kalispell's standards as well. The glazing or curtain wall system is comprised of insulated clear glazing and mullions with a sealed aluminum finish. This creates high visibility of the autos inside the showroom. The other sides of the building have some flexibility though within a narrow set of design constraints. These portions of the building are the service bays and dealership support spaces. I have not received the final approved schematics from VW thus some variations in the final exterior appearance is possible. The basic architectural appearance is that of horizontal banding in white and grey aligned with the heights established by the White Frame at the front facade. The materials are stucco, metal panels and possibly CMU block construction. Material samples will be provided to the ARB when appropriate. I will continue to update this information as it becomes available. Please let me know if I can be of further assistance. Sincerely, Mark T. Johnson, Architect GARDNER INVESTMENTS PLANNED UNIT DEVELOPMENT REPORT #KPUD -13-1 KALISPELL CITY PLANNING BOARD MARCH 26, 2013 The Kalispell City Planning Board held a public hearing on this matter at the regularly scheduled planning board meeting on March 12, 2013 and continued the meeting to March 26, 2013 to consider information and public testimony. At the March 26th meeting the planning board recommended the following conditions with approval of the PUD zoning request: CONDITIONS OF APPROVAL General Conditions: 1. The development of the two tracts of land (Parcel A and Tract 2) shall substantially comply with the following site plan and elevations submitted as part of the Planned Unit Development application: A. Site Layout Plan B. Building footprint site plan C. Elevations of the proposed Volkswagen dealership. 2. The permitted and conditional uses for Parcel A and Tract 2 are restricted to an auto dealership, professional office or commercial use complimentary to an auto dealership. 3. The property owner shall maintain the landscaping on their property and from their property line to the adjacent street or highway. 4. All utilities shall be placed underground. 5. Prior to further development on land shown on figure 2 the owner(s) shall submit a detailed PUD layout plan for the area that addresses the following: Conceptual design of a frontage road parallel to Highway 93 and identifying which existing approaches along Highway 93 will be used and the nature of the approach (i.e. right-in/right-out only, full movement approach or 3/ movement approach). • Identify the area and approximate size and specifications of a regional storm water detention area. • Approximate locations of north/south streets and east/west streets serving the area and the type of streets proposed (i.e. local street or collector street). • A conceptual design for lots within the area that identifies the location of buildings to the adjacent street and their associated parking lots. Prior to the issuance of a building permit: 6. A development agreement shall be drafted by the Kalispell City Attorney between the City of Kalispell and the developer outlining and formalizing the terms, conditions and provisions of approval. The final plan as approved, together with the conditions and restrictions imposed, shall constitute the Planned Unit Development (PUD) zoning for the site that shall be completed and signed by the city and owner prior to the issuance of a building permit. 7. The billboards on Parcel A shall be removed. 8. A landscape plan shall be submitted to the Parks and Recreation Department for review and approval. The landscape plan shall include an irrigation plan and specify tree and shrub type and size at the time of planting for the parking areas, areas around the building and adjacent right-of-ways. Note: Based on the eventual street design for Lower Valley Road the street trees may be required to be located on private property due to the lack of an adequate boulevard for tree survival. 9. A pedestrian/ bike path plan shall be provided to the Parks and Recreation Department and Public Works Department for review and approval. The plan shall show a connection to the intersection of Lower Valley Road and Willow Glen Drive and include a bike trail along Lower Valley Road. Note: An asphalt bike trail shall have a minimum width of 10 feet; a concrete bike trail shall have a minimum width of 8 feet. 10. A traffic analysis shall be submitted to the Public Works Department for review and approval prior to building on Parcel A. The traffic analysis shall account for future vehicle traffic on the approximately 55 acres of this PUD and determine the improvements required to Lower Valley Road based on the anticipated development and traffic volumes. 11. The property owner of Parcel A shall improve the property's frontage along Lower Valley Road in accordance with the approved traffic analysis. All improvements shall be completed in accordance with the City of Kalispell's Standards for Design and Construction and Montana Public Works Standards; and shall be certified by an engineer licensed in the State of Montana. All work shall be reviewed and approved by the Kalispell Public Works Department prior to construction. Note: Prior to work on Lower Valley Road the property owner or developer shall contact the postal service regarding the temporary relocation of mail boxes along the section of Lower Valley Road receiving work. After work is completed the mail boxes shall be reinstalled on same or better stands. 12. Water and sewer main extensions shall be reviewed and approved by the Kalispell Public Works Department prior to installation. 13. The developer shall submit to the Kalispell Public Works Department for review and approval a storm water management plan that meets the requirements of the current city standards for design and construction. The approved storm water management plan for on -site facilities shall be completed prior to the issuance of a building permit. 14. The property owner of Tract 2, prior to connecting to the city's sewer main, shall submit an analysis on the need for a regional lift station for the area. Prior to the issuance of a certificate of occupancy 15. A certification from an engineer licensed in the State of Montana shall be submitted to the Public Works Department stating that all water and/or sewer lines have been installed per the approved plan. 16. Any off -site storm water management facilities shall be installed per the approved plan. 17. All landscaping shall be installed per the approved landscape plan. 18. The bike trails shall be installed per the approved plan. 19. A certification from an engineer licensed in the State of Montana shall be submitted to the Public Works Department stating that the improvements to Lower Valley Road have been built as designed and approved. 20. The property owners of Parcel A and Tract 2 shall obtain the appropriate permit for the approach onto Highway 93 and receive an approval from MDT on the completion of conditions or requirements attached to the approach permit. The approved approach permit and MDT approval shall be submitted to the Kalispell Planning Department. �j : °�' i ---- 1�" ' _ � "��I _� '�1 _, 741 a ATIII I IMITIT/: [I [: 11•103/4" 1'4 71 3" V 61 0u f ?.83m1 ,. / 20 t-0 rr (6.10m) . PMS 877 C Metallic silver gray ■PMS Derk Ora y 45.50 ft2 4.23 ml Overall height 201.011 ft 6.10 m ®rgllnun Bryn piWa IV1.II.I.d 411 main iWolettanl Won gntl/or Illy pmpr fNeu Wnpr tuntMn Menwylapl pnpure nl Were 4mDr attwdlny to lo.el Slate, ProwmMi ut Yetlel4 lawn 1 •2" Supply & Install Aluminum construction throughout Supplied byVWoA Size D (1,46m) Clip Logo Part 1#40089700 Ring Set Part (#40089200 Supplied by PSG Routed out aluminum faces Painted PMS 877C metallic silver Break -formed aluminum collar Painted PMS 447 dark gray Extruded aluminum poles Painted PMS 877C metallic silver Illumination H.O. daylight fluorescent illumination f PATTISON f SIGN GROUP 666 Ellesmere Road Toronto, Ontario, Canada MIR 4E8 Tel (416) 766d 111 Fax (416) Y66.4666 Toll Frey 1.800,268-6636 www' pat ll sonailln.eanl A 12M. n of JIM 001kon tndu.tris. Ltd Month 00, 2007 Date R, Bernard; A, Salad Sales Rep C Kuefwkl /A, luannuu Designor 3118"•1'Oa 8aala 000000 DesiOn No, Revision Note Job No. Customer Approval Data rn. nrw+wme. aeprsMJ nurtlal . royrN/M.nd rn IM argWlra MrwnY Nrwnan 81er1 aruUu Iml N auM sannnh UN reprotlu[M rn Whnle ar ,n part witgpul pnN wda.n uniwn4 0 Dealer Name Here Address Line 1 Address Line 2 Zip Code 000000 VA-V211 Sao . . . . . . . . . . . . . . . . . . . . . PROPOSED CITY OF KALISPELL SANITARY SEWER LIFT STATION POTENTIAL 4ZTnl?,Klf PROJECT PROPERTY LINE Q LANDSCAPED AREA PUD PROPERTY IN REVIEW LEGEND: EASEMENT R/W AUTOMOBILE SHOW AREA FUTURE PARCEL EXISTING SIGN EXISTING APPROACH ASPHALT/CURB EDGE E)aSDW PARM PROPOSED BUILDING RAMO TOWER EASEMENT EXISTING ROAD EDGE FURK CITY WATER /SMR EXTIDW6 C014CEPT CURB TWIL/PATHWAY FUTURE DEN. POND CONCEPT TRIAL/PATHWAY CONCEPTUAL COMMERCIAL PUD VARIATION,'.j CIVIL PLANNING SHEET INDEX CP 1 - TRACTS 1 AND IF ENLARGED LAYOUT PLAN CP 2 - FUTURE DEVELOPMENT PROPOSAL CONCEPTUAL LAYOUT PLAN DESIGN TRIBUTARY AREA OF SEWER LIFT STATION AND DRAINAGE DETENTION AREA FUTURE WATER MAIN EXTENSIONS (GRAY HATCH) PARKLAND AND EXISTING TRACT LAND AND RADIO TOWER EASEMENTS- UTILITYCORRADOR, (DASHED GREY HATCH) FUTURE PUD WILL INVOLVE SUBDIVISION OR BOUNDARY LINE ADJUSTMENT AS CONCEPTUAL SUBDIVISION/PUD SHOWN HEREIN EVOLVES . . . . . . .... rt 71 ............................. EX. LEFT STATION No. 22 ------------- z ........................ --................................. ------ ........ .......... ............ PREVIOUS DEVELOPMENT WITH CITY WATER AND SEWER EXTENDED. PREVIOUS DEVELOPMENT WITH CITY WATER AND SEWER EXTENDED. - --- - - -------- EXISTINGM[DOT -- ----- --------- a---------- ------ ---- APPROACH (TYP) ------------- ............................ GRAPHIC SCALE (W FEET' 300 600 5 (j Q o &-4 �.4 0 P4 P4 z o Engineering kaUspell, montama w .apec-mtcom 406.755.1333 JOSNUAGUL 121112 DRAWNDY'. KM DATE Ammy 2W 2013 REVISIONS: FUTURE DEVELOPMENT CONCEPTUAL LAYOUT PLAN cp ,---EXISTING BILLBOARD WITH METERED ELECTRICAL SERVICE EXISTING COMMUNICATIONS .. cnl uoucX�. PYLON EALERSLIMINAR LENVELOPE 00 FT- g 0 0 --Jill PARCEL A OF COS I• • . • ! # 19299 • • •' TRACT 1 OF COS #6628 FUTURE \ • I W us (STING BILLBOARD WITH ■ 1 AFTEP.ED ELECTRICAL SERVICE ! - - EASEMENT (TYP) TRACT 2 OF COS #6628 t a i is FLATHEAD BROADCASTING LLC TRACT 1B TOWNSHIP 28, 0 N II L RAIvVE-28 2ri W E s TRACTS 1 AND 1 F ENLARGED LAYOUT PLAN DEALERSHIP CONCEPTUAL LAYOUT F—KIMBEIR- MFG;—.. 1 BDIViMN 160 SSS-1 d I TOWNSHIP' 28W, d 2i 'trf-mnm-gin-k . _.i A. A. OF APP' 1 1 LI[,y iI ` PUT; iN REVIEW 1 y/ PARCELS LIFT STATIONai I, t. ALL LOTS SHOWiy OU I OF - THE PUD HEFEIu RVAEW I 1 UAL ARE CONCEPTIN N�,TURC, 1 PROPERTY DEVELOP 1 ,� MENT DETAILS AND DEFINED CONCEI I� IS SUBJECT TO CHANGE ONCE DEVELOPMENT OF THIS PROPERTY IS PROPOSED WITH CONCEPTUAL A FORMAL REVIEW, LAYOUT OF • TRACT 1 PUD 1. 1. GARDNER INVESTMENTS LAC TRACT 61 TOWNSPNP 28.. RANGE 2 V,'i SECTION 28 GRAPHIC 1 PROJECT PROPERTY LINE LANDSCAPED AREA PUD PROPERTY LEGEND: -- EASEMENT R/w IN REVIEW O AUTOMOBILE SHOW AREA — - - — FUTURE PARCEL - EXISTING APPROACH - - - - - - EXISTING SIGN - ASPHALT/CURB EDGE \\ ER pp - PROPOSED BUILDING OWARCEEASEYENT CXISTING ROAD EDGE ® FUTURE CITY WATER /SEWER EXTENSIONS CONCEPT CURB TRAIL/PATHWAY FUTURE DEV. POND CONCEPT TRIAL/PATHWAY CONCEPTUAL COMMERCIAL PUD VARIATIONS CIVIL PLANNING SHEET INDEX CP 1 — TRACTS 1 AND 1F ENLARGED LAYOUT PLAN CP 2 — FUTURE DEVELOPMENT PROPOSAL CONCEPTUAL LAYOUT PLAN GENERAL NOTES: DRAWINGS HEREIN FOR PLANNED UNIT DEVELOPMENT CONCEPTUAL PLANNING AND REVIEW ONLY. UPON CITY OF KALISPELL PLANNING DEPARTMENT APPROVAL DETAILED PLANS WILL BE GENERATED FOR CONSTRUCTION DOCUMENTS SUBJECT TO CITY OF KALISPELL BUILDING DEPARTMENT APPROVAL OF THE VOLKSWAGEN DEALERSHIP SHOWN HEREIN. PROPERTY NOTES: PARCEL A OF COS # 19299, TRACT I ZONING: B-5/PUD AREA: 4.20 ACRE FRONT LOT SETBACK: 20 FT r SIDE YARD SETBACK: 5 FT REAR YARD SETBACK: 10 FT SIDE CORNER SETBACK 15 FT MAX. BUILDING HEIGHT: 40 FT LANDSCAPE PARKING LOT BUFFER: 5 FT DRIVE AISLES: 12 FT PER LANE PARKING LOT LANDSCAPE: 5% OF TOTAL PARKING AREA, TO EXCLUDE BUFFER f LANDSCAPE WHICH EQUATES TO 5,300 FT-2. CURRENTLY ROUGHLY 10,000 FT-2 IS PLANNED TO BE PROVIDED FULFILLING THE LANDSCAPING AND STORMORAINAGE REQUIREMENTS FOR THE SITE. PARKING REQUIREMENTS: 1 SPACE PER 1,500 SO. FT. OF FINISHED FLOOR (7,500/1500)= 5 SPACES I 2 SPACES PER SERVICE BAY (-20 SPACES) PARKING SPACE REQUIRED: 25 SPACES PARKING SPACE PROVIDED: 56 SPACES Engineering kalisp as www.apjp ec- mt.ctrt.co m 406.755.1333 DRAWNBY: KTL TRACTS 1 AND IF ENLARGED LAYOUT PLAN 1 Gardner two lot PUD Application PUD Application • Gardner Two Lot PUD Including development within of GLACIER VOLKSWAGEN City of Kalispell, Flathead County, Montana A formal review of the application herein is requested for the formal PUD assertion of the below mentioned two lots currently held within a placeholder PUD as adopted by City Council. The property in question are as described herein and shown on the supporting draft site design documents attached. The property: Tracts 1, 1F of the Mergenthaler Subdivision now referred to as Parcel A of COS # 19299 and Tract 2 of COS # 6628 located in the sw1/4 of the nw1/4 of Section 28, Township 28 North, Range 21 West, P.M.M., Flathead County, Montana. The PUD application herein includes the proposed preliminary layout for development of tract 1f with conceptual layout of tract 1 of the above described property. This application for a PUD was prepared on behalf of Gardner Investments, LLC; please use the mailing address of PO Box 958 Kalispell, MT 59903. APEC Inc. the technical representative is requesting review and comment on PUD development implementation within PUD placeholder city annexed property of tract properties near the intersection of Lower Valley Road and Highway 93. Page 1 of 6 Gardner two lot PUD Application Italicized text is verbatim from City of Kalispell zoning ordinance, answers follow text in addition to completing the formal application. All supplemental information and project layouts are included as appendixes. PUD Application Materials. The fill PUD application submittal shall contain the following information in the form of an overall PUD development plan and supporting text: (a) A listing of each deviation or class of deviation from the underlying zoning district and a justification of the appropriateness for the deviation; N/A (b) A listing of each deviation or class of deviation from. the city subdivision regulations design standards and a justification of the appropriateness for the deviation; N/A (c) An existing topo map showing existing building and features and a proposed topo map showing proposed topography using one to five foot intervals drawn to a scale not less than one inch equals 200 feet showing all proposed streets, lots, buildings, open space, wetlands, floodplain, environmental hazards, storm water facilities and other elements basic to the development; Both are attached and shown as 1 foot contour intervals. (d) Proposed locations, areas, densities and types of residential and nonresidential uses and structures within the area proposed to be developed and maximumm height of buildings or structure; See noted plans, Commercial usage as shown. (e) Proposed plans for handling: 1. Vehicular traffic; Much of the traffic is routed within the north property to Lower Valley Road and onto a previously constructed highway approach intended for this property. A shared access approach for both properties to highway 93 is proposed on an existing highway approach curb cut and asphalt intended for the properties. No detailed vehicle impact studies were conducted for the major roadways adjacent to this site though the Highway 93 South Corridor Growth Policy Amendment was reviewed and incorporated within the plans where possible. 2. Pedestrian traffic routes & trails including safe routes to school; Significant pedestrian traffic is not expected at this time though walking paths will be extended as improvements along the Highway and Lower Valley are completed. Two asphalt paths from the intersection of Highway 93/Willow Glen are to be extended, S' wide southbound'and 5' wide eastbound are proposed and will be reviewed by applicable MDOT and City personnel to contribute feedback whereby construction plans will be provided following site plan review and approval as each parcel is developed. Page 2 of 6 Gardner two lot PUD Application 3. Sewage disposal; conceptual storm water drainage and water supply; See attached for draft version of the related infrastructure improvements plan. Final design, plans, and specifications are expected for extensions of the water main and the construction of a sewage lift station. 4. Parks and open space; Landscaping buffers are utilized throughout the site plan as shown herein in basic layout fashion, future details will be completed. Improvements and continued maintenance of the bioswale water treatment/storage/infiltration areas will be completed to help ensure those needs are met while providing vegetative aesthetic appeal and lot coverage diversity. S. Parking; Ample parking for customers and employees will be provided as shown on the site plan. Significant extra parking is planned for currently while the dealership wishes to be held only to the minimum requirements should budgetary confinements require. 6. Prominent landscaping, buffering, site perimeter and entrance treatment features; A significant landscape buffer will be created by improving the planned bioswale and boundary buffer. 7. Club houses, sales offices; N/A 8. Retaining wall work in excess of 3 feet in height; No new retaining walls will be constructed that exceed 3 feet in height. 9. Common fencing designs and locations where proposed; Tract IF will not contain fences. Development of Tract 1 may include fence although at this time no plans exist for the lot. 10. Commercial, directional and entrance signage; Signage will be constructed in conformance with City of Kalispell sign requirements. At this time one pylon dealership sign is planned and the appropriate entrance/exit signage will be utilized to improve circulation within. 11. Street lighting and parking lot lighting where applicable; Site lighting will be designed in conformance with City of Kalispell standards. Photometric lighting data will be submitted to the City for review and approval. 12. Any other pertinent site development feattures. The anticipated future development within the 2 lot PUD area is expected to be automobile dealership in nature forming an auto -row of sorts. As proposals for development of the tracts become available more details will be provided to the City of Kalispell for review and approval. Page 3 of 6 M Gardner two lot PUD Application (f) Elevation drawings which demonstrate visually the general architectural features of each proposed building:or architecturally distinct grotip or type of buildings and the site perimeter treatment. Note — This may be waived by the Zoning Administrator on a case specific sittiation.for uses listed below which may include but are not limited to: See attached architectural drawings. 1. Single family detached hotcsing when the lots equal or exceed the minimum lot size of the underlying zone; and N/A 2. Two unit townhouse or duplex development which is alley loaded and the lots equal or exceed the minimum lot size of the underlying zone. N/A (g) The PUD plan shall show the botandary lines of adjacent subdivided or tan -subdivided land and the existing zoning of the area proposed for the PUD overlay; The attached plan shows the property as the Flathead County Clerk and Recorder records describe the property. (h) A timeline expressing the order in which the development shall occur and estimated time for completing Icey components or phases; An estimated timeline of roughly 1 'h years to design, approve and construct the VW dealership located on the north half of tract IF. Options will be weighed and future development of an independent business on the south half of the tract will be considered. Tract 1 will remain undeveloped for an undefined period of time; future development will be encouraged by the owners of the property. Future development will include site review as required. (i) Adequate provision for a homeowners association or other public or private management organization to provide for the operation and maintenance of all private (non -governmental) common facilities including any private streets or alley ways, homeowners parks, club houses, sales offices, open space, trails, recreational facilities and amenities, shared parking facilities, private lighting systems, stabdivision entrance signage and common mail receptacles; See the attached draft for shared access approach agreement applicable to tracts 1 and IF. As future roads or highway access points develop to the south and east of these tracts, in order to better serve the development potential for the entire area, additional agreements will be required and will be addressed at that time. As currently proposed delineating the shared easement approach located between tracts 1 and IF will sufficiently ensure ingress/egress of the lots as agreed to at this time and allow for tract IF review/input given a proposal will be developed that impacts the shared approach. (j) Adequate provisions shall be made for maintenance of all public common facilities (e.g, a trail or park) which are developed on public land, but intended to be maintained by a private organization or homeowners association; Off site lot improvements will be approved by Montana Department of Transportation and Flathead County Road and Bridge Department. Each entity will likely review roadway approach and right of way improvements including the sidewalk and or trails Page 4of6 Gardner two lot PUD Application along the properties. Improvement of ingress/egress and landscaping within the land adjacent to Highway 93 and Lower Valley road will be completed to beautify and promote access near the tract property. All adjacent to highway and Lower Valley Road landscaping will be maintained by the property owner adjacent thereto. (Ic) Where a PUD also involves a subdivision of land, it shall also meet the application requirements of the Kalispell Subdivision Regulations and the Montana Subdivision and Platting Act at the time the preliminary plat is submitted,- N/A- No subdivision is requested at this time or needed for these parcels as submitted. (l) For multi phase projects to be developed over a long period of time or where project components are proposed which may not be built for many years; 1. The first phase of development must comply with the fill application process outlined above. Development of the Volkswagen dealership will be as outlined within, details surrounding future developments will be included in subsequent submittals once j developers are identified and plans can be generated. 2. Each phase of a multi phase PUD must be able to be free standing. This improvement will be free standing and independent of reliance on future developments in the area. 3. Each phase of a PUD shall not exceed the density provisions of the underlying zone as limited by the PUD. Where a phase is proposed that complies with the overall PUD plan but the actual density of the particular phase may exceed the average density allowed by the underlying zone and PUD agreement, the applicant shall either provide the necessary corresponding open space or park facilities or suitably bond for them for development in a latter phase. No density deviations are requested. Each developed area will have open space as required by zoning regulations whereby no tract will exceed density requirements. 4. Future phase or major development components may show conceptual street designs, proposed park and open space areas, trail concepts, proposed residential density, housing types (single family, townhouse, apartment, etc.) and commercial areas versus detailed lot, blocic, street and park development and building designs. Based on a funding and associated conditions placed on the PUD at time of approval, the applicant may be required to provide more specific information prior to development of succeeding phases based on one of the following processes: (Note: The planning staff, Planning Board or council, at their discretion, may also request additional or more complete information relative to the future phases or components prior to recommending or granting initial PUD approval). a. A funding that the outstanding items are significant and therefore future phases or components should follow the fill PUD application process; b. A finding that the outstanding items are generally minor and therefore future phases or components should be reviewed under the conditional use permit process; or Page 5 of 6 Gardner two lot PUD Application c. A finding that the outstanding issues are insignificant and therefore f cture phases or components should be subject to administrative review by the Kalispell Site Review Committee; or d. A combination of the above provisions. (m) Any other information, plans and details which the city staff, Planning Board and/or City Council may request to filly evaluate the development proposal and its impacts. Page 6 of 6 HIGHWAY 93 APPROACH MAINTENANCE AGREEMENT This AGREEMENT is made and entered into this _ day of 2013, by Gardner Investments LLC of Kalispell, Montana, herein after known as "South Grantor." And Volkswagen Real Estate LLC of Whitefish, Montana, herein after known as "North Grantor". Whereas, Grantors is the owner of tracts of real property described as Parcel A of COS # 19299 (North — Volkswagen) and Tract 2 of COS #6628 (South — Gardner), which are on file and of record in the office of the Clerk and Recorder, Flathead County, Montana. Whereas, the Grantors are the owners of the equally shared approach serving the 2 lots. The shared approach is roughly a rectangle of 80' width and 90' length road approach easement bisected by the common property line between each grantors parcel. Now, Therefore, for good and valuable consideration, the receipt and sufficiency of which is hereby acknowledged, the Grantors wishes to grant un to each other, an equal interest in the road together with -all easements necessary for the beneficial use and enjoyment of the road system. Therefore each owner is Grantor/Grantee of equal share.of the Highway Approach. 1. GRANT OF INTEREST IN HIGHWAY 93 APPROACH Parcel A of,COS #'19299 and Tract 2 of COS #6628, SW % of the NW % of Section 28, Township 28 North, Range 21 West, Flathead County, Montana, shall each receive an equal interest in the highway approach. 2. PURPOSE OF THE EASEMENT This easement is for the purpose of (a) using, maintaining, repairing, and improving as needed, a paved access consisting, in minimum, of two -lanes of access, one in each direction, for purposes of unrestricted vehicular and pedestrian access, ingress, egress and regress between the GRANTOR's property and the existing at grade approach to U.S. Highway 93, a publicthoroughfare in Flathead County. Such unrestricted access, lanes, utilization of approach, to be of the minimum dimensions as specified herein and to locate as currently in existence, or as amenable to both piarties but entirely within the easement boundary as depicted on the approved PUD Site layout plan CP-1. The purposes of this Access -Easement are: 1) to provide year-round pedestrian and vehicular access to and from the properties by the its agents, personnel, customers, clients and any parties it so designates including, if.designated by the GRANTEE, the general public; and 2) to provide for the installation, maintenance, repair, replacement, removal, enhancement or improvements of/to the existing traffic and/or parking islands and related amenities as currently in place for purposes of channeling, directing and limiting traffic lanes including such traffic as traversing the boundary of the properties per this Agreement. Nothing in this Access Easement is intended to otherwise prohibit use of the specific access area as defined herein or of the property within the boundary of the Access Easement by the GRANTOR, provided such use does not interfere with the continuous and unrestricted use of the access by the GRANTEE and its agents, personnel, customers, clients and any parties it so designates including, if specifically designated by the GRANTEE, the general public. 3. EXPENSES TO BE SHARED The parties agree to share the costs and expenses of constructing and maintaining the above -described easement and private access in good repair for a period commencing from the date of this agreement forward. 4. MAINTENANCE AND REPAIRS DEFINED The repairs and maintenance to be undertaken and performed under this agreement shall include the following and only the following: filling of chuck holes when necessary, any resurfacing when necessary, graveling when agreed to, and asphalt paving, as to cost and amount by a simple majority, and any necessarysnow removal as agreed to by a simple majority. Any additional repairs or maintenance deemed necessary or advisable, but not included within the Maintenance and Repairs specified above, shall not be undertaken under this agreement except with express written consent of each party and an assumption by each in writing of their proportionate share of financial liability for the cost of such additional repairs or maintenance. 5. LIMITS OF LIABILITY The parties hereto agree to bear equally the costs and expenses of repairs and maintenance authorized pursuant to this agreement. 6. PERSONAL INJURY PROPERTY DAMAGE INSURANCE Each party further agrees that they will maintain, in force and effect, an insurance policy which said insurance should be sufficient to cover any damages arising out of any act or occurrences occurring on the road by any party and they shall bear liability in relation to their connection therewith. Any party, who shall, by their own act or negligence, damage the road while snow plowing, construction, or the like, will be liable for repairing said damages within thirty (30) days after they occurred at their sole expense. 7. LEGAL ACTION Any and each party shall have the right to bring legal action against any other party for violation of any of the provisions of this agreement, or to collect any payments due hereunder in any legal costs or other costs reasonably incurred to enforce this agreement. Any judgment obtained in such legal action shall be enforceable as a lien upon the property owned in this subdivision by the party who is deemed at fault. 8. BINDING AGREEMENT All parties agree that this agreement shall be binding upon their heirs, executors, assigns, and successors in interests to their property to the terms and conditions set forth herein. " 9. AMENDMENTS AND TERMINATION This agreement may be amended or changed upon the written consent of a simple majority involved, and this agreement may be terminated at anytime by the entering into of a formal written termination agreement agreed to and executed by a simple majority. Said -written -consent as:discussed herein shall not be unreasonably withheld if circumstances and events indicate that termination would be for.the good and benefit of the parties. 10. INDEMNIFICATION Each of the parties agrees to indemnify the other against all liability for injury to himself or damage to his property when such injury or damage shall result from, arise out of, or be attributable to any maintenance or repair undertaken pursuant to this agreement. 11. INUREMENT The provisions of this agreement are for the benefit of and appurtenant to the real property above - described and the right and obligations set forth herein shall run with -the tracts of real property and shall inure to the benefit of and be binding upon the parties hereto, their heirs, successors and assigns. IN WITNESS WHEREOF, the parties set their'hand to this agreement. Owner -Parcel A COS ;#`19299 — Volkswagen Real Estate LLC. Owner — Tract 2 COS # 6628 — Gardner Investments LLC. STATE OF MONTANA ) ss. County of Flathead ) On this day of 2013, before me, the undersigned, a Notary Public for the State of Montana, personally appeared Dan Pentelute, known to me°to be the person whose name is subscribed to the foregoing instrument as an individual. In WITNESS WHEREOF, I have hereunto set my hand and affixed my official notary seal the day and year in this certificate first above written. Notary Public for the State of Montana Residing at My Commission Expires \\Saeserver\documentsTroject Files\Subdivision Name Subdivision\Road Maintenance Agreement.doc