C. Award Bids - 1998 Overlay Project & Chip Seal ProjectL MEMORANDUM April 15,1998 To: Clarence Krepps, City Manager From: Jim Hansz, Director of Public W rks 4� Subject: 1998 overlay project Bids for this project were opened April 9, 1998. Bids were received from A-1 Paving and Nupac. Tabulation of the bids is attached. A-1 Paving's bid of $278,110.00 is low bid. Total funds available in this year for overlays and chipseal is $389,327.00 comprised of $355,000.00 of current FY budget, $14,981.00 of FEMA reimbursement for repairs to Northern Lights Boulevard, and $19,346.00 of unspent funds carried over from the prior year. The amount of this bid when combined with the bid results for the chipseal project is $371,986.00 which is within the total funds available this year. Therefore, I recommend acceptance of this bid. Also attached are copies of the FY 1998 proposed project list originally included with the budget. We are reasonably confident that all the streets shown on these lists can be done with the project funds available. Post Office Box 1997 • Kalispell, Montana 59903-1997 Telephone (406) 758-7700 • FAX (406) 758-7758 �.pril 10, 1998 TO: James C. Hansz, City Engineer FROM: David A. Holst, Construction Inspector `f Re: 1998 Street Overlay Bid Results. The analysis of the bid results for the above reference project is as follows: 1998 Street Overlay Project uantt Traffic Control: Surface Pre -Leveling: Keyway Excavation: 3-1 Tack Coat: Plant Mix Surfacing: Roto Milling: Roto Milling Hauling: A-1 Paving Inc. Unit Price Total Price Pack and Comnany Unit Price Total Price Lump Sum $ 9,000.00 $ 5,000.00 500 Tons $ 23.00 $ 11,500.00 $ 27.50 $ 13,750.00 1,000 yd2 $ 8.00 $ 8,000.00 $ 5.00 $ 5,000.00 73,000 yd2 $ .01 $ 730.00 $ .06 $ 4,380.00 10,000 Tons $ 23.00 $230,000.00 $ 25.00 $250,000.00 8,000 yd2 $ 1.26 $ 10,080.00 $ 1.50 $ 12,000.00 8,000 yd2 $ 1.10 $ 8,800.00 $ .40 $ 3,200.00 TOTAL BIDS. - All items related to the contract were analyzed for compliance to the specifications and bonding requirements. Both Contractors complied fully to those requirements. I am recommending that A-1 Paving Inc. be awarded the 1998 Street Overlay Project in the amount of $ 278,110.00. pc: project file FY 1998 Tax Increment District Projects OVERLAY - TAX INCREMENT DISTRICT Description I From To of Blks Width # Interl Sq.Yd's. I Tons Estimated Cost 5th Ave. W.N. JCenterSt. 11daho St. 1 21 371 21 2951 408.811 59.104.18 East Center St. IMain St. 3rd Ave. E. 1 31 371 31 4427 613.211 S 13.656.27 3rd St. W. Main St. Ist Ave. W. I 11 471 21 2051 284.131 56.327.68 9th St. W. Ist Ave. W. 5th Ave. W. 41 321 21 4751 658.151 S 14.657.18 2nd St. W. 5th Ave. W. 7th Ave. W. 21 44 2 3418 473.45 S 10.543.84 Sub -Total 12.01 111 17598 2-437.761 554,289.14 Traffic Control Lump Sum S3.500.00 Roto Milling S 1.10lsq. yd. 53.000.00 Pre -Leveling Asphalt 300 tons 57.500.00 Total Estimated Quantities for Overlay's 568.289.14 CHIP SEAL - TAX INCREMENT DISTRICT Description I From I To I of Blks Width # Interl Sq.Yd's. ITonsAgg.1 Gallons Oil I Estimated Cost 12th St. W. 12nd Alley W. IMain St. 1.5 32 1 1842 23.03 663.20 S1,473.78 12th St. E. Main St 2nd Ave. E. 2 32 1 2376 29.69 855.20 51,900.44 I Ith St. W. 2nd Alloy W. Main St. 2 32 I 2376 29.69 855.20 51,900.44 I Ith St. E. Main St. 2nd Ave. E. 2 32 2 2618 32.72 942.40 52.094.22 IOth St. W. 2nd Alley W. Main St. 1.5 32 1 1842 23.03 663.20 51,473.78 loth St. E. Main St. 2nd Ave. E. 21 321 1 2376 29.691 855.20 S1,900.44 9th St. W. 6th Ave. W. Ist Ave. W. 5 301 1 5242 65.53 1,887.20 S4,193.78 Courthouse Loop 8th St. W. 9th St. W. 1 321 I 1309 16.36 471.20 S 1,047.11 Courthouse Loop 8th St. E. 9th St. E. 1 321 1 1309 16.36 471.20 51,047.11 9th St. E. Main SL 2nd Ave. E. 2 301 1 2242 28.03 807.20 S 1.793.78 I st Ave. E. 6th St. E. 12th St. E. 6 32 11 6642 83.03 2.391.20 55.313.78 2nd Ave. E. Center St. 12th St. E. 1 12 30 2 12484 156.06 4,494.40 59.987.56 7th Ave. W.N. L Hwy. 2 1 30 1 1242 15.53 447.20 $993.78 6th Ave. W.N. ffRailroad Hwy. 2 2 30 2 2484 31.06 894.40 S1.987.56 4th Ave. W.N. Hwy. 2 2 30 1 2242 28.03 807.20 S1.793.78 3rd Ave. W.N. Hwy. 2. 2 30 1 2242 28.03 j 807.201 S 1.793.78 2nd Ave. W.N. South End Hwy. 2 2 321 1 2376 29.691 855.201 $1.900.44 1st Ave. W.N. South End Hwy. 2 2 321 I 2376 29.691 855.20 51,900.44 Ist Ave. E.N. Montana St. Hwy. 2 1.5 32 1 1842 23.03 663.20 51.473.78 2nd Ave. E.N. Montana SL Hwy. 2 1 32 1 1309 16.36 471.20 S 1.047.11 Sth Ave. E.N. Montana St Hwy. 2 1.5 32 2 2084 26.06 750.40 51.667.56 Montana St. 4th Ave. E.N. 15th Ave. E.N. 1 32 21 1551 19.39 558.40 51.240.89 Total Estimated Quantities for Chip Seal's 54 01 62,407 761 22.4661 549,925.33 APPLICATION RATE: .36 gallons CRS-2R per sq.yd. 25 pounds cover aggregate per sq.yd. COST EST.: 50.80 sq. yd. FY1998 Chip Seal /Overlay Projects 'OVERLAY- GENERAL STREET TAX FUNDED Descnption From To # of Biks. Width #Inter. Sq.Yd's. Tons Estimated Cost W. California St. 13rd Ave. W.N. I Hwy. 93 N. 31 301 31 3.727 1 516 S 11.496.77 W. Nevada 14th Ave. W.N. iHwy 93 N. 2 301 31 2.727 1 378 58.411.77 Garland St. Sherry Lane Sherry Lane 3 30 3 3.727 516 $11.496.77 Kristen lane Sherry Lane Sherry Lane 2 30 3 2,727 378 58.411.77 9th St. E. 7th Ave. E. 8th Ave. E. 1 32 1 1309 181 54.037.92 8th Ave. E. 9th St. E. 10th St. E. 1 30 1 1242 172 53.832.26 6th St. E. 3rd Ave. E. 4th Ave. E. 1 30 2 1,484 206 54.579.51 6th St. E. 6th Ave. E. Woodland Dr. 2 30 2 2.484 344 57.664.51 4th St. E. 6th Ave. E. Woodland Dr. 1 261 21 1.351 187 54.168.18 6th Ave. E. 3rd Ave. E. 7th Ave. E. 4 301 31 4.727 655 S 14,581.77 Sub -Total 20.0 231 25504 3533 578.681.21 Traffic Control Lump Sum S 1.700.00 Pre -Leveling Asphalt 150 tons $3.750.00 Total Estimated Quantities for Overlay's General Tax 584,131.21 OVERLAY - GAS TAX FUNDED Description I From I To # of Blks. Width # Inter. S .Yd's. I Tons lEstimated Cost E. Center St. 3rd Ave. E. 4th Ave. E. 1 37 2 1718 237.96 55.299.34 Meridan Road A plewa Dr. Hwy. 2 5 30 3 5727 793.30 S 17,666.77 Two Mile Dr. Hawthorne City Limits 6 30 3 6727 931.82 520.751.77 7th Ave. E.N. Hwy. 2 City Limits 3 37 2 4184 579.66 S 12,909.01 4th Ave. E. E. Center St. Hwy. 2 3 30 3 3727 516.24 S 11,496.77 Sub -Total 18.0 13 22082 3.058.97 568.123.66 Traffic Control Lump Sum 53.500.00 Roto Milling S 1. 1 01sq. yd. 510.000.00 Pre -Leveling Asphalt 150 tons $3.750.00 Total Estimated Quantities for Overlay's Gas Tax $85.373.66 CHIP SEAL - GAS TAX FUNDED Description I From I To # of Biks. Width # Inter. Sq.Yd's. I Tons Agg. I Gallons Oil I Est. Cost Woodland Ave. E. Center St. Woodland Dr. 15 32 17 20118 251.47 7.242.40 S 16.094.22 Woodland Dr. Woodland Ave. City Limits 4 32 3 4993 62.42 1.797.60 53,994.67 2nd St. E. 3rd Ave. E. Woodland Ave. 3.5 30 2 3984 49.81 1.434.40 53.187.56 Conrad Dr. Woodland Ave. Woodland Park D 3 36 2 4084 51.06 1.470.40 53.267.56 Ist Ave. E. 12th St. E. Hwy 93 S. 3 42 2 4684 58.56 1.686A0 53,747.56 12th St. W. 2nd Ave. W. 4th Ave. W. 2 35 2 2818 35.22 1,014.40 52.254.22 1 lth St. W. 2nd Ave. W. 8th Ave. W. 7 34 5 9144 114.31 3,292.00 57,315.56 l Oth St. W. 2nd Ave. W. 8th Ave. W. 7 30 5 8211 102.64 2.956.00 56.568.89 2nd Ave. W. 9th St. W. 12th St. W. 3 31 1 3342 41.78 1,203.20 52.673.78 3rd Ave. W. 9th St. W. 12th St. W. 3 34 2 3884 48.56 1.398.40 53,107.56 4th Ave. W. 9th St. W. South End 4 34 2 5018 62.72 1.806.40 54.014.22 6th Ave. W. 9th St. W. I lth St. W. 2 261 2 2218 27.72 798.40 51.774.22 7th Ave. W. 16th St..W. i Ith St. W. 51 341 31 79.92 2.301.601 S5,114.67 Total Estimated Quantities for Chip Seat's Gas tax 1 61-51 1 481 788931 986.171 28,401.601 563,114.67 APPLICATION RATE: COST EST.: .36 gallons CRS-2R per sq.yd. 25 pounds cover aggregate per sq.yd. 50.80 sq. yd. MEMORANDUM April 15, 1998 N To: Clarence Krepps, City Manager From: Jim Hansz, Director of Public W4sss Subject: 1998 chipseal project Bids for this project were opened April 9, 1998. Bids were received from A-1 Paving and Nupac. Tabulation of the bids is attached. A-1 Paving's bid of $93,879.00 is low bid. Total funds available in this year for overlays and chipseal is $389,327.00 comprised of $355,000.00 of current FY budget, $14,981.00 of FEMA reimbursement for repairs to Northern Lights Boulevard, and $19,346.00 of unspent funds carried over from the prior year. The amount of this bid when combined with the bid results for the chipseal project is $371,986.00 which is within the total funds available this year. Therefore, I recommend acceptance of this bid. Also attached are copies of the FY 1998 proposed project list originally included with the budget. We are reasonably confident that all the streets shown on these lists can be done with the project funds available. Post Office Box 1997 • Kalispell, Montana 59903-1997 Telephone (406) 758-7700 • FAX (406) 758-7758 April 10, 1998 TO: James C. Hansz, City Engineer FROM: David A. Holst, Construction Inspector W Re: 1998 Chip Seal Project Bid Results The analysis of the bid results for the above reference project is as follows: 1998 Chip Seal Project uanti -raffic Control: .dituminous Material Cover Aggregate: Lump Sum 228 Tons 1850 Tons TOTAL BID: A-1 Paving Inc. Unit Price Total Price $ 7,700.00 $167.00 $ 38,076.00 $26.00 $ 48,100.00 ,ir 93.876.00 Pack and Company Unit Price Total Price $ 5,000.00 $237.00 $ 54,036.00 $25.00 $ 46,250.00 $1OS.286. 00 All items related to the contract were analyzed for compliance to the specifications and bonding requirements. Both Contractors complied fully to those requirements. I am recommending that A-1 Paving Inc. be awarded the 1998 Chip Seal Project in the amount of $ 93,876.00. pc: project file FY1998 Chip Seal /Overlay Projects OVERLAY- GENERAL STREET TAX FUNDED Descnption From To # of Blks. Width #Inter. Sq.Yd's. I Tons Estimated Cost W. California St. 3rd Ave. W.N. Hw-•. 93 N. 3 30 3 3.727 516 S 1 1.49&77 W. Nevada 4th Ave. W.N. Hwv 93 N. 2 30 3 2.727 378 58.411.77 Garland St. Sherry Lane Sherry Lane 3 30 3 3.727 516 S11.496.77 Kristen lane Sherry Lane Shem• Lane 2 30 3 2.727 378 58.411.77 9th St. E. 7th Ave. E. 8th Ave. E. 1 32 1 1309 181 54.037.92 8th Ave. E. 9th St. E. 10th St. E. 1 30 1 1242 172 53.832.26 6th St. E. 3rd Ave. E. 4th Ave. E. H 30 21 1A84 206 54,579.51 6th St. E. 6th Ave. E. Woodland Dr. 2 30 2 2,494 344 57.664.51 4th St. E. 6th Ave. E. Woodland Dr. 1 26 2 1.351 187 54.168.18 6th Ave. E. 3rd Ave. E. 7th Ave. E. 4 30 3 4,727 655 S 14,581.77 Sub -Total 20.0 23 25504 3533 578,681.21 Traffic Control Lump Stun S 1.700.00 Pre -Leveling Asphalt 150 tons 53.750.00 Total Estimated Quantities for Overlay's General Tax 584,131.21 OVERLAY - GAS TAX FUNDED Description From To # of Biks. Width # Inter. Sq.Yd's. I Tons Estimated Cost E. Center St. 3rd Ave. E. 4th Ave. E. 1 37 2 1718 237.96 55.299.34 Meridan Road Appleway Dr. Hwy. 2 5 30 3 5727 793.30 $17.666.77 Two Mile Dr. Hawthorne City Limits 6 30 3 6727 931.82 S20.75 L77 7th Ave. E.N. Hwy. 2 City Limits 3 37 2 4184 579.66 S 12,909.01 4th Ave. E. E. Center St. Hwy. 2 3 30 3 3727 516.24 S 11,496.77 Sub -Total 18.0 13 22082 3,058.97 568,123.66 Traffic Control Lump Sum 53.500.00 Roto Milling S1.10/sq. yd. S 10,000.00 Pre -Leveling Asphalt 150 tons 53,750.00 Total Estimated Quantities for Overlay's Gas Tax 585373.66 CHIP SEAL - GAS TAX FUNDED Description From To # ofBlks. Width # Inter. Sq.Yd's. Tons Agg. Gallons Oil Est, Cost Woodland Ave. E. Center St. Woodland Dr. 15 32 17 20118 251.47 7.242.40 S 16.094.22 Woodland Dr. Woodland Ave. City Limits 4 32 3 4993 62.42 1.797.60 S3,994.67 2nd St. E. 3rd Ave. E. Woodland Ave. 3.5 30 2 3984 49.81 1.434.40 53,187.56 Conrad Dr. Woodland Ave. Woodland Park D 3 36 2 4084 51,06 1.470.40 53.267.56 Ist Ave. E. 12th St. E. Hwy 93 S. 3 42 2 4684 58.56 1.686.40 53,747.56 12th St. W. 2nd Ave. W. 4th Ave. W. 2 35 2 2818 35.22 1,014.40 52.254.22 I Ith St. W. 2nd Ave. W. 8th Ave. W. 7 34 5 9144 114.31 3.292.00 57,315.56 I Oth St. W. 2nd Ave. W. 8th Ave. W. 7 30 5 8211 102.64 2.956.00 56,568.89 2nd Ave. W. 9th St. W. 12th St. W. 3 31 1 3342 41.78 1,203.20 52,673.78 3rd Ave. W. 9th St. W. 12th St. W. 3 34 2 3884 48.56 1.398.40 53.107.56 4th Ave. W. 9th St. W. South End 4 34 2 5018 62.72 1.806.40 54,014.22 6th Ave. W. 9th St. W. I lth St. W. 2 26 2 2218 27.72 798.40 51.774.22 7th Ave. W. 16th St. W. I lth St. W. 51 341 393 79.921 2,30 1 M1 55,114.67 Total Estimated Quantities for Chip Seal's Gas tax 1 61.51 1 481 788931 986.171 28.401.601 S63,114.67 APPLICATION RATE: .36 gallons CRS-2R per sq.yd. 25 pounds cover aggregate per sq.yd. COST EST.: 50.80 sq. yd. FY 1998 Tax Increment District Projects OVERLAY - TAX INCREMENT DISTRICT Description I From To of Blks Width # Interl Sq.Yd's. I Tons I Estimated Cost 5th Ave. W.N. ICenter St. I Idaho St. 1 21 371 21 2951 408.811 $9,104.18 East Center St. IMain St. 13rd Ave. E. 1 31 371 31 4427 613.211 S 13,656.27 3rd St. W. Main St. 1st Ave. W. 1 47 21 2051 284.13 56.327.68 9th St. W. 1st Ave. W. 5th Ave. W. 41 321 21 4751 658.15 514.657.18 2nd St. W. 5th Ave. W. 7th Ave. W. 2 44 2 3418 473.45 S 10.543.84 Sub -Total 12.0 i 1 175981 2,437.76 554,289.14 Traffic Control Lump Sum 53,500.00 Roto Milling 51.10/sq. yd. S3.000.00 Pre -Leveling Asphalt 300 tons S7.500.00 Total Estimated Quantities for Overlay's 568,289.14 CHIP SEAL - TAX INCREMENT DISTRICT Description I From To I of Blks Width # Interl Sq.Yd's. JTonsAgg.J Gallons Oil I Estimated Cost 12th St. W. 12nd Alley W. Main St. 1.5 32 1 1842 23.03 663.20 51.473.78 12th St. E. IMain St. 2nd Ave. E. 2 32 1 2376 29.69 855.20 51,900.44 i Ith St. W. 12nd Alley W. Main St. 2 32 1 2376 29.69 855.20 51,900.44 i lth St. E. Main St. 2nd Ave. E. 2 32 2 2618 32.72 942.40 52,094.22 I Oth St. W. 12nd Alley W. IMain St. 1.5 32 I 1842 23.03 663.201 $1.473.78 1 Oth St. E. I Main St. 12nd Ave. E. 1 21 321 11 2376 29.691 855.20 S 1.900." 9th St. W. 16th Ave. W. I Ist Ave. W. 1 51 301 1 52421 65.531 1,887.20 54,193.78 Courthouse Loop 18th St. W. 19th St. W. I 11 321 1 13091 16.361 471.20 S 1,047.11 Courthouse Loop 18th St. E. 19th St. E. I 11 321 1 1309 16-361 71.20 S 1.047.1 1 9th St. E. Main St. 12nd Ave. E. 1 21 301 1 2242 28.03 807.20 S 1.793.78 1st Ave. E. 16th St. E. 112th St. E. 61 321 1 66421 83.03 2,391.20 55,313.78 2nd Ave. E. Center St. 12th St. E. 121 301 21 12484 156.06 4,494.40 59.987.56 7th Ave. W.N. Montana St. Hwy. 2 11 30 1 1242 15.53 447.20 5993.78 6th Ave. W.N. Railroad St. Hwy. 2 2 30 2 2484 31.06 894.40 51.987.56 4th Ave. W.N. South End Hwy. 2 2 30 1 2242 28.03 807.20 51,793.78 3rd Ave. W.N. South End Hwy. 2. 2 30 1 2242 28.03 807.201 $1.793.78 2nd Ave. W.N. South End Hwy. 2 2 32 1 23761 29.69 855.201 51,900.44 Ist Ave. W.N. South End Hwy. 2 2 321 1 2376 29.69 855.20 SI,900.44 Ist Ave. E.N. Montana St. Hwy. 2 1.5 321 1 1842 23.03 663.20 51.473.78 2nd Ave. E.N. Montana St. Hwy. 2 1 321 1 1309 16.36 471.20 51,047.11 5th Ave. E.N. Montana St. Hwy. 2 1.5 1 32 2 2084 26.06 750.40 51.667.56 Montana St. 14th Ave. E.N. 5th Ave. E.N. 1 321 2 1551 19.39 558,40 S 1.240.89 Total Estimated Quantities for Chip Seal's 541 1 0 62,407 761 22.466 $49.92533 APPLICATION RATE: .36 gallons CRS-2R per sq.yd. 25 pounds cover aggregate per sq.yd. COST EST.: 50.80 sq. yd.