D. Authority to Advertise for Bid - Meridian Road WalkwayMEMO: TO: Clarence Krepps, City Manager FROM: Michael Baker, Director Parks & Recreation SUBJECT: Meridian Road Walkway - Contract Modification DATE: March 25, 1998 Dear Clarence: I am excited to inform you we have received our CTEP Project Modification from M.D.T. Funds are now banked and available for the continuation of general project development and construction of the Meridian Road Walkway. The following is a recap of the project scope and a brief historic description for your information. Phase I: Preliminary Engineering - design a 0.5 mile pedestrian walkway along the east side of Meridian Road, from 7th Street West (Ashley Creek) North to Idaho Street. (A) Mapping $3,150.00 (B) Environmental documentation 750.00 (C) Preliminary project plans 5,300.00 (D) Preliminary cost estimate 750.00 Total 9 950.00 Phase H: Final design and construction for a pedestrian walkway project that includes: A concrete and asphalt pedestrian path approximately 4,170- feet in length and 5-feet wide along Meridian Road from 7t' Street West (Ashley Creek) to Idaho street (US Highway No.2). Bicycle racks, pedestrian benches, safety pavement markings, and signs, pedestrian railroad track crossing and the planting of trees in accordance with current design standards and ADA requirements. (A) Plans & specifications for bidding, $4,400.00 Bidding and negotiation (B) Right-of-way/Easement Acquisition 6,380.00 (C) construction Engineering 9,200.00 Total SJ9,980,00 The total estimated cost of the project development and construction totals is $105,060.00. This project is an 80% Federal, 20% Local Match. It began in 1991 as a 3' priority for project selection. In 1994 we began Phase I. The accumulated funds in the CTEP Bank show we are now eligible to follow through with bidding and construction of Phase H. Work will be bid this Spring, with construction scheduled late Summer, prior to school beginning, depending on the rate in which MDT processes the projects paper work. At this time I am requesting authorization to proceed with Phase H of the project including design, bidding and construction. Thank you for your consideration of this matter. If further information is needed, please feel free to contact me. 1: � 2CF A 2 11 �,� Lt BLK 1 7D _,1 & 3 AMD PLAT I OF L. 2 1FA HWY Z 7 1 GIBSON i� R UE$ B IB ON SALLEE ADO #41 / CDONALDS KALISPELL KALISPELL ADDITION O ADD. 152 STANL.EY LUMBER CO. LUMBER CO. 12 I 2 A / O i ADDcA 11 I 3; 4 . N0. 50 a 10 4 ; ADD #41 / Q1Poo ADD. #42 ADD. NO. 27 1 s 9 5 e ' s AMD. PLAT L.1 7 PLAT L.2 MERIDIAN so 3 ,\�/ 2 1 WA,T R ADD, AMD POR OF COMPLEX m 12_ CD � � J0 2 P 11 �/ OF L2&3 su Ue MERIDIAN 19 gWALTER ADO 4 COMPLEX ALTER ADD NO 40 iy 8 / 4 .S 1A & L. 2, AMD PLAT 0 A D. 45 1 B / 1 C LOT 4 cl 1 E WEISSMAN LOT 1, MERIDIAN COMPL ES B L. &3 1 A 7 A GIBSON ADD.#41 1 B 1 AA 12 ADD. N0, 48 1 AE J 12 13 CIRCLE K 2 j ADD. 7 tM 15 14 1 N Rc 16 C° ..-•- ...- �x � SF 12 1 �---- �.. 3 BAN (BRANCH _ 1 1 A 10 11 111 C 50D 6 7 1ST 1 12 / 12 50 1 12 2 11 13 1E Q 50 1 12 2 11 i 11 / 41 2 Al 10 4 8 14 10 .8 5 PC 11 DA 4 9�_ 1�1 � 2 1 151 1 1 ' 2 `�` 11A Al t 1 1 9 7654 D 10 2ND ST W + p D e 9 151431 2 9876 10 9 A ID 1 506 { 5 111A ' 2 SDc+ 5 s s 2 W 2 IS 3.._ ,1► . 'r W'lU • •. .� rah.' � , 1 i� 1AI z 1AH 1AG 1A+ 1 7 S DmN w 11 6 1 1 AF Ro a 9 1 12 2 �110 �i 1A+ P 2 s 12 2 111 3 1+ ��Z '`P 9 5 Al 3 10 g 1 7 4 10 { 9 7TH ST W { g 5 8 43 �3654321, �5D IN g i ICON