Loading...
Department Activity ReportsCITY OF KALISPELL FINANCE DEPARTMENT REPORT CASH RECONCILEMENT AT THE CLOSE OF BUSINESS DATE: JANUARY 31, 1998 CASH ON HAND & DEMAND DEPOSITS; NORWEST CASH IN TRANSIT: GEN'L, HEALTH, POOL $12,703.68 NORWEST CHECKING $60,502.45 NORWEST (CITY HEALTH FUND) $4,142.15 STIP (CITY HEALTH FUND) $643,302.79 STIP PROGRAM $12,392,324.86 NORWEST SWIMMING ACCT $100.58 BIDDER'S BONDS $55,389.65 SUB -TOTAL DEMAND DEPOSITS: INVESTMENTS: GLACIER BANK: INTEREST SUBSIDY/REHAB $4,539.18 COURTYARD RESERVE ACCOUNT $10,457.89 COURTYARD RESERVE ACCOUNT/EQUITY $38,303.87 GLACIER BANK CD'S $2,450,000.00 OTHER INVESTMENTS: SEWER: 1990 S & C BONDS $1,900.00 SEWER: 1991 S & C BONDS $1,692.84 SEWER: 1992 S & C BONDS $5,000.00 SEWER: 1993 S & C BONDS $2,190.00 SEWER: 1994 S & C BONDS $17,500.00 SEWER: 1995 S & C BONDS $17,112.00 SEWER: 1996 S & C BONDS $12,147.88 SEWER 1997 S & C BONDS 4" $8,572.96 TOTAL LONG TERM INVESTMENTS: PETTY CASH TOTAL TO BE ACCOUNTED FOR: Respectfully Submitted, Carol L. Kostman Assistant Finance Director February 6, 1998 $13,168,466.16 $2,569,416.62 $750.00 $15,738,632.78 Clarence Krepps, City Manager William E. Boharski, Mayor Kalispell City Council Members SUBJECT: Kalispell Municipal Court Report for month of January, 1998. TOTAL OF FINES AND FORFEITURES: Contracts -$12,649.71 Citations -$12,405.00 Parking -$ 870.00 State Surchrg -$ 865.00 DL Reinsts -$ 550.00 Drug Fund -$ 205.62 City Fees -$ 455.00 City Surghrg -$ 1,015.00 City Interest -$ 635.21 City Filing Fees -$ -0- CITATIONS and COMPLAINTS ISSUED: ORDERS OF PROTECTION: CIVIL CASES FILED: HEARINGS SET DURING THE MONTH: JURY TRIALS ACTUALLY HELD: NONJURY TRIALS HELD: Honorable Heidi Ulbricht Municipal Court Judge $29,650.54 390 5 0 61 2 25 Post Office Box 1997 - Kalispell, Montana 59903-1997 Telephone (406) 758-7700 - FAX (406) 758-7758 N Kalispell Fire Department Monthly Report January 1998 Clarence Krepps, City Manager William Boharski, Honorable Mayor City Council Members The Kalispell Fire Department responded to twenty-two fire calls for the month. The fire loss was approximately $3,000.00. The calls are as follows: Children With Matches 1 ��Y" `}ry Vehicle Fire Wiring 1 Y or Backfire Combustibles Near Heat 1 Natural gas Leak or 1 Gas Smell Electrical Appliance 2>Y=.: �`,: tv44`},}�;;}��;�,�;� Gasoline Hazard 1 Motors Food Preparation 3 •tQ}ti`�}ti 1 "`>_<> ```Y.?:Y«; Alarm Malfunction 7 Spontaneous Combustion 1 };'Y?>?}` `}v`? Smoke Scare Honest 2 Mistake Vehicle Accident Gas 2 ••S{iCtt ?NY,tFittiu"A',}f;'k< First Aid Accident 1 Containment Rescue The Kalispell Fire Departments Ambulance's responded to one hundred eighty-three calls for the month. The calls are as follows: Post Office Box 1997 - Kalispell, Montana 59903-1997 Telephone (406) 758-7700 - FAX (406) 758-7758 -2- Motor Vehicle 11 L Respiratory 21 Accidents Cardiac 22 Cancer Patient 1 Transfers 37 Allergic Reaction 1 Falls 20 Sync ope 1 Trauma/Assaults 4 CVA (Strokes) 10 Psychiatric 1 Seizures 9 Public Assistance 3• Abdominal Pain ( acute) 5 Sick Calls 16 Industrial/Sports 6 Diabetic 2 Full Code 2 Drugs/Alcohol 10 DOA I 1 Our "Chimney Brush Program," was used eight times during the month. There were thirteen commercial business inspections done during the month. Respectfully Submitted, Orland Leland Assistant Fire Chief PUBLIC WORKS DEPARTMENT ACTIVITY REPORT January 1998 ENGINEERING DIVISION ♦ Attended meeting with PP&L to discuss the utility relocation project. The base maps of the alley are complete and were delivered to PP&L for their design. ♦ Met with Damschen & Associates to determine scope of proposed Solid Waste Study. ♦ Met with Billmayer Engineering to determine scope of electrical design required for underground utilities adjacent to the KDC site. ♦ Reviewed Lone Pine View Estates developer's request to reduce the amount of subdivision improvement escrow account. ♦ Conducted field survey to establish FIS datum for the Spring Creek Flood Study. ♦ Prepared and combined large AutoCAD section files for Kalispell area base map. ♦ Met with PP&L and Billmayer Engineering to review initial design concept for undergrounding the electric power. TCI and PTI can now begin their design process. ♦ Established bidding timetable for the Center Street and First Avenue East traffic signal project. ♦ Continued preparation of City utility base map. ♦ Prepared preliminary drawings for the Spring Creek Drainage Project. ♦ Reviewed construction plans for the Business Complex and Buffalo Square Subdivision. ♦ Reviewed plat of Buffalo Commons Phase 1. ♦ Completed chlorinating and pressure testing for the Lutheran Home and Buffalo Stage Phase III. ♦ Updated Special Tax Assessments. ♦ Continued update of City organization chart. ♦ Began drafting utility connections and mainlines on base map. ♦ Setup parcel database for Engineering Network. ♦ Continued update of parcel square footage. OFFICE AND STAFF ♦ There were 11 emergency call -outs for the month of January: Water Division - 6; Street Division - 4; Sewer Division - 1. CENTRAL GARAGE I- ♦ 90 repair orders were completed during the month of January: ♦ Police ............ 17 Streets............ 29 ♦ Fire ............. 6 Garbage........... 13 ♦ Others ............ 25 ♦ Continued preventative maintenance on all City vehicles. ♦ Rewired rear light system on ice melt truck for the Street Division. ♦ Repaired air compressor and dryer on Solid Waste truck. ♦ Welded and reinforced side arm supports on Solid Waste truck. SANITARY/STORM SEWER DIVISION ♦ Continued video inspection and jet cleaning of sewer lines Monday through Thursday. ♦ Performed weekly maintenance of fifteen lift stations each Friday. ♦ Video inspected 985' of sewer main at Buffalo Stage Phase III. ♦ Began entering manhole inventory records into Hansen Field Works. ♦ Installed new dialog alarm system in Lift Stations #3, 4, 6, 7, 9 and 10. ♦ Wired lift Stations #4, #14, and #15 for auxiliary power plant. ♦ Tested auxiliary power plant on Lift Stations #4, #14, and #15. ♦ Pumped the Woodland Park holding tank. SOLID WASTE DIVISION ♦ Delivered 21 containers to new customers. ♦ Repaired 5 containers and responded to 5 violations. ♦ Continued weekly garbage service. ♦ Continued weekly alley cleanup. ♦ Making map of private pickup inside the City Limits. ♦ Compiling a list of how many average miles per day each truck runs on the primary and secondary routes. ♦ Compiling a report to the Public Works Department on the number of City containers. STREET DIVISION ♦ Continued ice control throughout City. ♦ Continued alley grading and magnesium chloride treatment. ♦ Continued support to Solid Waste for alley clean up. ♦ Continued Christmas tree pickup and chipping. ♦ Hauled rock for the Parks Department from County Pit to Lawrence Park. ♦ Received additional 11,600 gallons of ice melt. ♦ Continued cold mix patching. ♦ Continued crack sealing. WATER DIVISION WATER PUMPING & STORAGE: ♦ Produced 57 M gallons of water: 44 M gallons upper zone and 13 M gallons lower zone. ♦ Injected 45 ibs. of chlorine. ♦ Continued routine maintenance on all pumps, motors, grounds, buildings, controls, testing and record keeping. ♦ Completed yearly testing on Water Quality Assessment Test requested by the State; re: ground water under the influence of surface water - Noffsinger Spring. ♦ Switched to the new telemetry control system. 2 ♦ Grandview Well Project: ♦ Piping is complete. ♦ All motor components are in place. ♦ Waiting for the pump control panel and the electrical hookups for metering, pre- lube, engine heater, misc. that require control panel installation. ♦ Monitored, inspected, and coordinated progress. ♦ Completed trihalomethane water sample. WATER CONSTRUCTION AND SYSTEM REPAIR: ♦ Tagged 33 delinquent accounts. ♦ Delivered 33 water meters. ♦ Completed 58 work orders during the month of January. ♦ Repaired 8" water main which damaged by Contractor at West Montana & 7`'' Ave. WN. ♦ Replaced six curb stops. ♦ Completed backfilling at Lawrence Park for the overflow at Buffalo Hill Tower. ♦ Cleaned fuel spill at the Elk's Lodge on Hwy 93 South. ♦ Installed a 12x2 service water service for the new tennis court at the Summit on Sunnyview. ♦ Repaired service line at 1575 Lehi Lane. ♦ Replaced 3/ " service line at 533 2' Street East. ♦ Replaced curb stop and water service from City main to curb stop at Woodland and 2" Street East. ♦ Replaced valve box at 347 2nd Avenue West. ♦ Replaced curb box and rod and 926 2nd Avenue East. ♦ Replaced curb box and rod at 812 2nd Avenue Est. TRAFFIC SIGNS & SIGNALS DIVISION ♦ Continued maintenance of traffic signals, lights, signs, and meters. ♦ All intersections equipped with Opticom were checked and okayed. ♦ Put up Pro -Life Banner. ♦ Installed two microwave vehicle detectors and one ultra sound vehicle detector at Idaho & Main and Main & Center Street. ♦ Measured Main & Center and Center & 1" Avenue West for area wide signal update for MDOT in Helena. ♦ Continued preparations for turning East Meridian Road into a one-way east bound and to start the signal at Hwy 93 North and Northridge Drive. ♦ Re -signed East Meridian Road for a one-way east bound. Activated signal at Northridge and Hwy 93 North. ♦ Marked areas at Northridge Drive and Parkway for installing "Pedestrian Crossing" signs. WASTEWATER TREATMENT DIVISION ♦ 83 Work Orders were completed during the month of January. ♦ 343 Lab Tests were performed during the month of January. ♦ 23 Loads of sludge were hauled during January. ♦ The fermenter unit was drained and inspected on January 28`' by a structural engineer from Morrison-Maierle and a coating specialist from Rust Not Corrosion Control Services, Inc. The final report is expected in two weeks. 3 DEPARTMENT OF BUILDING & ZONING MEMORANDUM TO: CITY MANAGER CLARENCE KREPPS, MAYOR WM. E. BOHARSKI, & CITY COUNCIL FROM: CRAIG KERZMAN, BUILDING OFFICIAL DATE: JANUARY, 1998 RE: PERMIT REPORT PERM JAN 1998 FEES RECEIVED JAN 1998 PERMITS JANUARY TO DATE FEES REC JANUARY TO DATE PERMIT FISCAL YEAR FEES REC FISCAL YR TO DATE Building 17 6,136 17 6,136 184 77,864 Plan Review 5 2,139 5 2,139 66 32,164 Plumbing 17 1,068 17 1,068 107 8,348 Mechanical 43 2,420 43 2,420 226 13,982 Moving 1 100 1 100 3 300 Signs 4 144 4 144 19 680 TOTALS: 87 12,007 1 87 1 12,007 605 133,338 Jan., 1998 Jan to Date Fiscal Year to Date BUILDING CITY 1,026,339 1,026,339 11,292,431 VALUATION COUNTY 140,301 140,301 5,340,702 TOTAL 1,166,640 1,166,640 16,633,133 SEWER CAPITOL IMPROVEMENT FUND 5,460 5,460 92,014 WATER CONNECTION FEE 2,400 2,400 28,860 BOARD OF ADJUSTMENT FEE 175 175 700 CAK/ak DEPARTMENT OF BUILDING & ZONING COMMENTS FOR MONTH OF JANUARY, 1998 Building Activity: Permits were issued for 7 new single family residential structures and for one foundation for a manufactured home. A permit was issued to complete the interior of two more condominiums in the Whitefish Stage Professional Park. A permit was issued for the first bale building in our jurisdiction. The building frame is engineered and the bales are used to fill in between the supporting columns. Zoning: There were two sign permits issued for the month of January. 1. Poiema Carpets - 206 W. Center Street 2. Equity Supply - 508 W. Center Street There were two variance applications heard at the January Board of Adjustment meeting. Variance request by Gladys Jensen to build an addition in the required side yard setback. The Board granted her a variance for a 5' side yard setback rather than the 2' setback that she was requesting. 2. Variance request by Robert Velde to replace a roof structure over a porch in the required front yard setback. The Board voted 5-0 in favor of granting the requested variance. One variance request has been received for the February, 1998 Board of Adjustment meeting. Diana prepared a presentation for the Kalispell City Council on her job duties as zoning administrator. The zoning administrator received and followed up on zoning complaints. Diana also met with several people about proposed new projects in Kalispell. Narda Wilson and Diana Harrison have continued working on the proposed amendments to the Kalispell Zoning Ordinance. Page 2 of 2 EOM Building & Zoning - January, 1998 Diana is working on an emergency floodplain development permit for the golf course. Personnel: Two vacancies still exist; one for the plans reviewer and one for the building inspector. General: The building department presented information to the City Council on January 26. The council was advised about building and zoning activities.. Craig Kerzman CAK/ak oI t 0 ƒ / \ $ k k / � I 2 LO LO LO LO \ \ \ \ \ I Q Q Q Co. k�8 G a § 8 / $ 2 $ ƒ $ \ a m E k § » O ƒƒ\§ � f ) ( § % o o j § $ o o o / § \ \ / LO \ \ 0 t G « \ \ \ \ \ \ \ } } = E a 2 q M 5 7 �\ \a a \ \� a j & G a » a 21 2) 21 \)2 k J BUILDING PERMIT LIST FROM O1/01/98 TO 01/31/98 PERMIT NUMBER 98-1 LOREN HAMS 314 KINGS WAY 3BBG SW32 T29 R21 N25E4 CONSTRUCT A CONCRETE FOUNDATION FR A 16' X 80' MANUFACTURED HOME. J. C. CONSTRUCTION $9,000.00 98-10 J&F CONSTRUCTION 325 COMMONS WAY LOT 1B BUFFALO COMMONS CONSTRUCT A 2 BEDROOM, 2 BATH 1,822 SF TOWNHOUSE WITH A 528 SF 2-CAR ATTACHED GARAGE. J&F CONSTRUCTION $142,101.00 98-11 J&F CONSTRUCTION 335 COMMONS WAY LOT lA BUFFALO COMMONS CONSTRUCT A 2 BEDROOM, 2 BATH 1,822 SF TOWNHOUSE WITH A 528 SF 2-CAR ATTACHED GARAGE. J&F CONSTRUCTION $142,101.00 98-12 KEVIN & MARCIE AURICH 130 STILLWATER LANE LOT 4 BUFFALO STAGE PHASE I T29N R21W CONSTRUCT A TWO STORY 3 BATH, 4 BEDROOM 2,200 SF SFR ON AN EXISTING 831 SF FULL BASEMENT WITH A 745 SF TWO CAR ATTACHED GARAGE. MCCORMICK CONSTRUCTION $154,189.00 98-13 JIM THOMPSCN 160 RIVERVIEW DRIVE LOT 20 RIVERVIEW GREENS REPAIR INTERIOR SHEET ROCK DAMAGED BY WATER. STAT DISASTER RESTORATION $25,000.00 98-14 U.S. PARTNERSHIPS II 110 DENVER STREET LOT 33 LONEPINE VIEW ESTATES CONSTRUCT A 1,685 SF 2 BDRM, 1 BATH SPLIT LEVEL SFR WITH FULL BASEMENT FOR FUTURE 2 BD. -,MS AND 1 BATH WITH 414 SF ATTACHED 2 CAR GARAGE. U.S. PARTNERSHIPS II $69,058.00 98-15 DON DECKER 310 WHITE -:RCH LANE LOT 13 RESER.'E DRIVE ESTATES S34 T29 R21 CONSTRUCT A 10' X 24' BEDROOM ADDITION TO AN EXISTING TWC STCRY SFR HILZAC CORP. $17,466.00 BUILDING PERMIT LIST FROM 01/01/98 TO 01/31/98 PERMIT NUMBER 98-16 DAN THORNTON 446 VALLEY DRIVE PARCEL B DAYS ACRES SE4 SEC 17 T28W R21W CONSTRUCT A 24' X 40' POST BEAM ENGINEERED STRUCTURE WITH BALE INFILL ON A MONOLITHIC SLAB. ECO-BALE CONSTRUCTION $9,600.00 98-17 CINDY & MIKE UPWALL 1225 5TH AVENUE WEST TR 8TWB SW4 SW4 S18 T28 R21 CONSTRUCT 20' X 30' PRIVATE DETACHED GARAGE ON A MONOLITHIC SLAB. SELF $6,000.00 98-18 JAMES & VICKI WOODRUFF 444 VALLEY DRIVE LOT 3B NE4 SE4 S17 T28 R21W CONSTRUCT A 24' X 24' PRIVATE DETACHED GARAGE ON A MONOLITHIC SLAB. J&S CONSTRUCTION $5,760.00 98-2 TIMBERLAND CONSTRUCTION, INC. 127 QUINCY.LOOP LOT 6 WOODLAND COURT SE4 SE4 S17 T28N R21W CONSTRUCT A 1,203 SF 3 BDRM, 1 BATH SFR ON A CRAWLSPACE FOUNDATION WITH ATTACHED 484 SF GARAGE. TIMBERLAND CONSTRUCTION $81,486.00 98-3 PAT & WILMA SIEMENS 2721 HIGHWAY 93 SOUTH TRACT 5CDG S20 T28N R21W CONSTRUCT A 50' X 102'-2" PRE -CAST TILT UP CONCRETE STRUCTURE. SELF $98,475.00 98-4 TIMBERLAND CONSTRUCTION, INC. 120 QUINCY LOOP LOT 21 WOODLAND COURT SE4 SE4 S17 T28N R21W CONSTRUCT A 1,400 SF 4 BDRM, 2 BATH SFR ON A CRAWLSPACE FOUNDATION WITH A 484 SF ATTACHED GARAGE. TIMBERLAND CONSTRUCTION $94,602.00 BUILDING PERMIT LIST FROM O1/01/98 TO O1/31/98 PERMIT NUMBER 98-5 GOLDEN DEVELOPMENT, INC. 1232 & 1234 WHITEFISH STAGE ROAD TRACT 1BA SEC 6 T28N R21W CONSTRUCT INTERIOR PARTITIONS TO CREATE INTERIOR OFFIr.F SPACE RICHCREEK CONSTRUCTION $84,038.00 98-6 WALLY MASSIE 764 PARKWAY DRIVE LOT 18 SUNRISE VIEW ESTATES CONSTRUCT A 2-STORY 3 BEDROOM, 3 BATH 1,744 SF RESIDENCE ON A 1,256 UNFINISHED BASEMENT WITH 488 SF ATTACHED 2 CAR GARAGE. SELF $137,764.00 98-8 FIRST SECURITY BANK 233 EAST IDAHO STREET LT 6 BLK 4 REMODEL EXISTING OFFICE SPACE ON MAIN FLOOR AND LOWER LEVEL. DOUG NASH CONSTRUCTION $70,000.00 98-9 MICK BLODNICK 475 3RD AVENUE EN LT 10 BLK 223 KAL ADD #4 FINISH EXISTING BASEMENT SPACE; CONSTRUCT INTERIOR PARTITIONS TO CREATE BEDROOM & LIVING AREA. KENT MEYER CONSTRUCTION $20,000.00 TOTALS: $1,166,640.00