5. Award Bid - Public Works Wash Bay ProjectREPORT TO: Mayor and City Council FROM: Jim Hansz, Director of Public Works SUBJECT: Award Bid for Wash Bay MEETING DATE: August 16, 1999 BACKGROUND: Four bids were received by the due date of September 1, 1999. The attached tally sheet shows all bids against the engineer's estimate for the project. The low bid was from Ross Construction for $162,450.00. This amount is $20,404.00 more than the engineer's estimate. An analysis of the low bid shows the difference to be primarily in three areas: concrete/excavation, roofing, and the contractor chose to separately charge for bonds and permits which are typically part of the contractor's 10% overhead and profit. A copy of the engineer's cost breakdown and the low bid are attached for information. Funds totaling $145,000.00 for this project were included in the FY 1999 Solid Waste Division budget. The project was to be financed via a loan for $145,000.00 from the Board of Investments. This amount was estimated to be the cost for a simple steel addition to the south end of the existing equipment building. During the FY 1999 budget review process the City Council expressed a preference for a concrete block structure that would be of higher quality and more durable. Architects Design Group designed the project with the desired CMU block construction. The original budget of $145,000.00 was carried forward to the FY 2000, without adding extra for block construction, with the hope that the bids would be within the original amount. This is not the case. After a thorough review, we feel the bid is appropriate, and the design is the best for the intended use. Attached is a Resolution from the Board of Investments for the necessary loan of $145,000.00. The remaining amount of $20,450.00, plus an additional $11,870.00 for design services, is available from current budget reserve funds. Post Office Box 1997 • Kalispell, Montana 59903-1997 Telephone (406) 758-7700 • FAX (406) 758-7758 RECOMMENDATION: Authorize award of the wash bay bid to Ross Construction and approve resolution for Board of Investments loan. FISCAL EFFECTS: Eventual expenditure of budgeted funds up to $174,320.00 for construction and design of Solid Waste Division Wash Bay. ALTERNATIVES: As suggested by the City Council Respectfully sub e , es C. Hansz, E. Director of Public Works / ity Engineer Attachment: Resolution o n Chris A. Kukulski City Manager Report compiled September 2,1999 Z LU ^^LU V VJ d 0 N m W Lu Y3 Y 3 3Lu a ZU) �Y Q)Y !�-Y tqY ZY Sheetl WASH BAY - CITY OF KALISPELL AUG. 2, 1999 COST ESTIMATE ITEM QUANITY UNITS UNIT COST COST Relocate Fence 1 LS $ 300.00 $ 300 Site Clearing 1 LS $ 400.00 $ 400 Excavation / Backfill 1721LF $ 2.21 $ 380 Foundation 172 LF $ 47.80 $ 8,222 Floor Trench 36 LF $ 50.00 $ 1,800 Slab 1450 SF $ 3.25 $ 4,713 Aporns 32 SF $ 5.00 $ 160 12" CMU - Standard 2050 SF $ 14.00 $ 28,700 12" CMU - Split Faced 228 SF $ 16.00 $ 3,648 8" CMU 436 SF $ 9.00 $ 3,924 Pilasters 4 EA $ 480.00 $ 1,920 Bollards 6 EA $ 240.00 $ 1,440 Man Door 1 EA $ 600.00 $ 600 Raise Existing Door 1 EA $ 400.00 $ 400 12' x 12' Door 2 EA $ 3,066.00 $ 6,132 Patch Asphalt 1 LS $ 250.00 $ 250 Coping Flashing 176 LF $ 2.50 $ 440 Bar Joist / Decking 1560 SF $ 3.00 $ 4,680 Wall Angle 176 LF $ 6.00 $ 1,056 Roofing and Insulation 1560 SF $ 3.45 $ 5,382 Bearing Wall 441 SF $ 5.75 $ 2,536 Insulation W/ V B 441 SF $ 0.54 $ 238 Gypsum Sheating 882 SF $ 0.50 $ 441 Metal Siding 441 SF $ 1.25 $ 551 RFP Panels 441 SF $ 3.97 $ 1,751 Cut Existing Siding 54 LF $ 2.00 $ 108 Flashing 8" Wall 54 LF $ 1.15 $ 62 Seal CMU - Exterior 2400 SF $ 0.20 $ 480 Epoxy CMU - Interior 2636 SF $ 1.00 $ 2,636 Seal Conc. Floor 1560 SF $ 1.00 $ 1,560 Epoxy Bar Joist 3120 SF $ 1.00 $ 3,120 Paint Overhead Doors 2 EA $ 400.00 $ 800 Paint Man Doors 2 EA $ 150.00 $ 300 ` Paint Bollards 6 EA $ 40.00 $ 240 ' Sealants 1 LS $ 200.00 $ 200 Mechanical 1 LS $ 28,000.00 $ 28,000 Roof Drains / Storm Sewe 1 2 LS $ 2,000.00 $ 4,000 Electrical 1 LS $ 6,400.00 $ 6,400 SUB TOTAL $ 127,969 O & P j 10% $ 12,797 Contractor's Tax 1 % $ 1,280 TOTAL $ 142,046 Page 1 z t BUILDING CONTRACTOR INC. Since 1956 P.O. Box 1121 • Kallspell, MT 59903.1121 • Phone 406-257-5550 * Fax 406-755-5550 email:rosscens * d(gisys.net Mr. John Peterson A.D.G. Kalispell, Mt. 59901 The following is a breakdown of costs for the Kalispell Wash Bay: Excavation & Concrete Work $17,300.00 Demo & Steel Studs 4,400.00 FRP Wall 3,600.00 Chain Link Fence 2,100.00 Masonry 37,600.00 Structural Steel & Rebar 16,000.00 Doors 5,500.00 Building Insulation 350.00 Painting & Coatings 8,899.00 Roofiug 10.400.00 Mechanical 27,850.00 Electrical 6>900.00 Bonds 3,300.00 Permit 1,800.00 1 % Contractor's Tax 1,645.00 Total Net Cost 147,644.00 10% Overhead & Profit 14,806.00 Total 162,450.00 RESIDENTIAL • BUSINESS • REMODELING • COMMERCIAL MONTANA CONTRACTOR REGISTRATION 11278