5. Reject Bid - El Dorita Lift StationN REPORT TO: Mayor and City Council FROM: Jim Hansz, Director of Public Works SUBJECT: Bid Recommendation for El Dorita (Liberty Street) Lift Station MEETING DATE: August 16, 1999 BACKGROUND: A single bid for this revised project was received from LHC on August 11, 1999. The bid was 20% above the engineer's revised estimate. The comparison is attached. Based on this result we recommend rejection of the bid and a re -bid of the project in the early spring when the pressure of current construct has faded and the local construction community is able to concentrate on acquiring new work. We believe this will give us more favorable results. No problems will arise from this additional delay. RECOMMENDATION: Reject bid and authorize a re -bid later in the year. FISCAL EFFECTS: Eventual expenditure of budgeted funds for construction. Possible additional expenditure beyond current budget amount if bids continue to exceed budgeted amount. ALTERNATIVES: As suggested by the City Council PP E� Chris A. Kukulski Director of Public Worys / City Engineer City Manager Report compiled August 12,1999 Post Office Box 1997 • Kalispell, Montana 59903-1997 Telephone (406) 758-7700 • FAX (406) 758-7758 NAY MEMORANDUM To: Jim Hansz Director of Public Works/City Engineer From: Dick Amerman Assistant City Engineer Date: August 12, 1999 Re: El Donta Lift Station Improvements The referenced project was re -bid on August 11 with only one bid being received. The bid results are attached. LHC's price exceeds the Engineer's estimate by almost 20%. It is recommended that we reject the bid and re -advertise in early spring when there is very little construction activity. We should be able to get a much more reasonable bid at that time. Post Office Box 1997 - Kalispell, Montana 59903-1997 Telephone (406) 758-7700 - FAX (406) 758-7758 EL DORITA LIFT STATION IMPROVEMENTS BID OPENING RESULTS AUGUST 11,1999 ITEM NO. DESCRIPTION QUANTITY ENGINEER'S ESTIMATE LHC TOTAL BID 1.01 SEWER MANHOLE 1 EA. $2,500.00 $2,650.00 1.02 LIFT STA. DEMOLITION L.S. $8,000.00 $10,500.00 1.03 PACKAGE LIFT STATION L.S. $62,000.00 $73,000.00 1.04 EXPLORATORY EX. 5 HRS. $750.00 $875.00 TOTAL $73,250.00 $87,025.00