4. Award Bid - Downtown Tax Increment Sidewalk Replacement Projectr1A pNTP REPORT TO: Mayor and City Council FROM: Jim Hansz, Director of Public Works SUBJECT: Downtown TIF Sidewalk Replacement Bids MEETING DATE: July 19, 1999 BACKGROUND: The FY 98/99 budget included funds in the Downtown TIF District budget for sidewalk replacement within the TIF District. These funds were carried forward to the FY 99/00 budget and additional funds were added for a total of $150,000.00. A project for replacement of sidewalk at fifteen sites was advertised and bids were opened on July 18, 1999. Two bids were received. The bid from Pack and Company was $118,000.00. The bid from Sandon Construction was $86,329.00. A supplemental bid was included to allow property owners abutting the project sites to have their damaged walks replaced at their expense in conjunction with this project. Attached are copied of Fred Zavodny's memo and the bid forms from each bidder. A second project for additional replacement sites will be assembled for bidding in the spring of 2000. RECOMMENDATION: Staff recommends award of this project to Sandon Construction based on the low bid of $86,239.00. Staff also recommends acceptance of Sandon's supplemental bid. FISCAL EFFECTS: Expenditures of $86,239.00 to replace sidewalks at fifteen sites throughout the Downtown TIF District. There is no fiscal impact on the City from the supplemental bid. ALTERNATIVES: As suggested by the City Council Res ectfull Iu , J ansz, P.E. Director of Public W s /City Engineer Chris A. Kukulski City Manager Report compiled July 15, 1999 Post Office Box 1997 - Kalispell, Montana 59903-1997 Telephone (406) 758-7700 - FAX (406) 758-7758 MEMORANDUM Date: July 14, 1999 To: James Hansz, Director of Public Works From: Fred Zavodny, Project Manager 7.2D Re: Downtown Tax Increment Sidewalk Replacement Project - Phase III Bid Analysis and Recommendation Bids were received from Sandon Construction and Pack and Company. Both bids were in order and contained the required Bid Bond. Fifteen individual sites were included in the bid. A Lump Sum price was requested for the fifteen sites. Sandon's lump sum price amounted to $86,239.00 and Pack's lump sum price amounted to $118,000.00: The Engineer's price range for this project was between $80,000.00 and $90,000.00. The total project budget for FY 1999/2000 Tax Increment Sidewalks is $150,000.00. An additional contract will be awarded next spring for the remainder of the budget. A Supplemental Bid was included in the Contract to enable the owners of property adjacent to the project sites the opportunity to have abutting sections of their walkways repaired in conjunction with this project. The Supplemental Bid establishes fixed prices for this work. The prices quoted by Sandon in the Supplemental Bid are generally consistent for this type of work. The property owner will pay the contractor directly for this work. I am recommending the bid for the Downtown Tax Increment Sidewalk Replacement Project be awarded to Sandon Construction in the Amount of $86,239.00. It is also recommended that Sandon's Supplemental Bid be accepted. DOWNTONVNT TAX INCREMENT SIDE`VALK REPLACEMENT PROJECT PHASE III The lump sum price for each individual site shall include furnishing all materials, labor and equipment required to complete all work at the site in accordance with the plans, specifications and contract documents. - BID ITEM DESCRIPTION TOTAL LUMP SUM PRICE 1. Site No. 1 S 6709 2. Site No. 2 S ��? O <S._S 3. Site No. 3 S .3 :-? 9 / 4. Site No. 4 S y 2 2/ 5. Site No. 5 S 3,5 7 (' 6. Site No. 6 $ 3 3 3 7. Site No. 7 8. Site No. 8 9. Site No. 9 S cI 2 `-/ 7 10. Site No. 10 $ 9 9 11. Site No. 11 $ 7707 12. Site No..12 $ 9 / O 7 13. Site No. 13 $_� / /13 14. Site No. 14 15.'-. - Site No.15 $ 2622 Total Bid Items 1 through 15 $ �, 2 3 TG�ayyo/2E/J Tf/i�7"y �t/�il�E _ /oa Total Bid Written in Words7. :. The bid sheets shall not be removed from this document. The entire document shall be submitted as a bid. "Enclosed herewith is a ip :°,'oo in the amount of ch the undersigned...agrees is .to. be forfeited to and become the property of the City' of Kalispell, Montana *as liquidated damages, should this proposal be accepted and the contract awarded to the Contractor .and the Contractor fails to enter' into a contract in the form prescribed and to furnish the required bond within ten (10) calendar days of Notice of Contract Award, but otherwise this bid security shall be returned to the undersigned upon the signing of a contract and furnishing of Bond. 1 y �w� y ! �1 5 �-r•10 ?"1 � � 5-t a �,k CZl O P Date Mailing Address Contractor Axdthorized Signature Firm (?1.T �59903 ql 6- �5Z.LlZ3 Phone Number Proposal Page 2 of 2 SUPPLEMENTAL BID The Supplemental Bid may be utilized to expand the construction of sidewalks beyond the original scope of the Downtown Tax Increment Sidewalk Replacement Project - Phase III. The Contractor shall provide excavation, materials, labor and equipment required to construct sidewalks to the project specifications. BID ITEM DESCRIPTION UNIT EST. QUANTITY UNIT PRICE 1. 4" Thick Sidewalk SF Any Quantity 2. Landscaping SF Any Quantity1.7 3. Concrete Sidewalk LF Any Quantity :Sawcuttina The bid sheets shall not be removed from this document. The entire document shall be submitted as a bid. Date Firm - o 3 7-3 � Mailing Address - Phone Number Contractor. on d Signature Page 1 of 1 DOWNTOWN TAX INCREMENT SIDEWALK REPLACEMENT PROJECT PHASE III The lump sum price for each individual site shall include furnishing all materials, labor and equipment required to complete all work at the site in accordance with the plans, specifications and contract documents. BID ITEM DESCRIPTION TOTAL LUMP SUM PRICE 1. Site No. 1 $ /L DOD • M) 2. Site No. 2 $ �!, O010 . OC> 3. Site No. 3 $i 4. Site No. 4 $ �, n ce) 5. Site No. 5 6. Site No. 6 7. Site No. 7 n cxa , n� 8. Site No. 8 $ S ,, C-Y�O , ri"� 9. Site No. 9 10. Site No. 10 11. Site No. 11 $ !�, o00 •cam 12. Site No. 12 13. Site No. 13 14. Site No. 14 15. Site No. 15 Total Bid Items 1 through 15 . $ [ 1 8 cck„ l�.r r , �.•;� � , � �..0 �-cc..i�u..� � //sue Total Bid Written in Words The bid sheets shall not be removed from this document. The entire document shall be submitted as a bid. Enclosed herewith is ain the amount of Dollars, which the undersigned agrees is to be forfeited to and become the property of the City of Kalispell, Montana as liquidated damages, should this proposal be accepted and the contract awarded to the Contractor and the Contractor fails to enter into a contract in the form prescribed and to furnish the required bond within ten (10) calendar days of Notice of Contract Award, but otherwise this bid security shall be returned to the undersigned upon the signing of a contract and furnishing of Bond. -7 I q,, D to Firm (tit/ 7�S-— Mailin Phone Number l 1, I,JC02..65�IAoA,%J C nractorAi4horized Signature Proposal Page 2 of 2 SUPPLEMENTAL BID The Supplemental Bid may be utilized to expand the construction of sidewalks beyond the original scope of the Downtown Tax Increment Sidewalk Replacement Project - Phase III. The Contractor shall provide excavation, materials, labor and equipment required to construct sidewalks to the project specifications. BID ITEM DESCRIPTION UNIT EST. QUANTITY UNIT PRICE 1. 4" Thick Sidewalk SF Any Quantity , CO 2. Landscaping SF Any Quantity 3. Concrete Sidewalk LF Any Quantity I , oo Sawcutting The bid sheets shall not be removed from this document. The entire document shall be submitted as a bid. 14. qA-�-L 4f'J ►a e Firm ddres ' Phone Number Alk Authorized Signature Pa-e 1 of 1