Loading...
03. Proposed Downtown Streetscape ProjectREPORT TO: Mayor and City C FROM: Jim Hansz, Director of Public Works SUBJECT: Proposed Downtown Streetscape Improvement Project MEETING DATE: June 21, 1999 BACKGROUND: In February of this year, representatives of the Kalispell Downtown Business Association approached the City Council at a regular work session with a request that the City implement more of the recommended improvements identified in the City's Downtown Redevelopment Plan. This plan was initially prepared and adopted by the City Council by Ordinance #933 in 1979 and was updated in 1987 with specific recommendations for enhanced parking and pedestrian streetscape improvements. Improvements made on First Street and 2nd Avenue East were the City's first effort to implement these recommendations. The proposed improvements now under consideration are taken directly from the 1987 update. The project improvements would include the creation of angle parking, adding mid -block and intersection "knuckles" for pedestrian crossings, and reducing the travel lanes on First Avenues East and West from four to two from Center Street to Fourth Street West and Fifth Street East. In addition it is proposed to change Third Street to one-way west bound between the First Avenues, add street furniture and period street lighting, and to add colored pavers and concrete at pedestrian crossings. Along with these improvements there would be storm drainage improvements. The goals of this improvement project are to create a more "pedestrian friendly" environment, reduce traffic speeds and the severity of accidents, increase on street parking, and to enhance the appearance of the central business district. In order to assess the effectiveness and impact of these improvements on the current downtown community, City staff obtained the support of Robert Peccia and Associates (RPA) of Helena to perform an analysis of the project. This analysis included an assessment of the overall impact of the proposed traffic changes, estimated costs of the improvements, and the integrated impacts of other known traffic improvement projects proposed for construction in the very near Post Office Box 1997 • Kalispell, Montana 59903-1997 Telephone (406) 758-7700 • FAX (406) 758-7758 future. These projects included new City signals on First Avenues East and West at Third Street, and traffic signal upgrades and coordination throughout Kalispell to be done by MDT. This report was previously distributed the City Council. In summary, the RPA analysis concludes that all the stated goals will be met by the project. On street Parking would be increased by 100%, and safe pedestrian movement would be greatly enhanced by the reduced time and distance involved in crossing the street. Total traffic volumes on the First Avenues would be reduced an estimated 10% as drivers move back to Main Street. These reductions would be somewhat offset between Second and Fourth Streets as traffic rerouting occurs due to the one way change on Third Street. (Overall, traffic volumes would continue to be far below the capacity of the street system, a trait shared by virtually all cities in Montana.) Estimated construction costs for the project are $715,000.00. Additional costs for engineering, inspection and contingencies may raise the total project cost by 25% from these initial estimates. Changes in the project scope to extend the improvements an additional block north on the First Avenues would also increase costs. RECOMMENDATION: Based on the stated goals for the project, staff recommends proceeding with the design and construction as soon as possible. There will be a potential for significant disruption of traffic and business as this project will be underway at the same time that MDT is working on the US 93 South project. This appears to be unavoidable if the work must be done prior to the sunset of the Downtown TIF Urban Renewal District. FISCAL EFFECTS: Expenditures for construction of approximately $715,000 should be anticipated. Additional costs for engineering, an enlarged project scope, and costs for unforeseen contingencies should also be anticipated as better information is developed during the design process. These other costs could raise the total project cost to approximately $900,000.00. Initial design work could be started and funded from existing specific and discretionary sources within the current fiscal year Downtown TIF budget. However, in practical terms this is a FY 99/00 effort because of the likely need to advertise for design services. There is not sufficient time remaining in this budget year to complete this. Funds are included in the 99/00 budget for this project along with unallocated funds. Other funds from projects budgeted but not anticipated to be built, i.e. traffic signals, are available. Also, additional funds will be available, over and above those previously anticipated, due to favorable bid experience on recent projects in the current budget. The total of all the funds potentially available, from all sources within the fiscal year 2000 Downtown TIF budget, is approximately $1,005,000.00. ALTERNATIVES: As suggested by the City Council Respectfully James C. Hansz, P.E. ( / Director of Public Works / City Engineer Chris A. Kukulski City Manager Report compiled June 10,1999