E. Award Bid - 1999 Overlay & Chip Seal ProjectsMEMORANDUM April 29,1999 aN To: Al Thelen, Interim City Manager From: Jim Hansz, Director of Public W rks Subject: Agenda Item, Chipseal & Overlay Bids Bids for the City's 1999 Chipseal and Overlay projects were opened on April 23, 1999. There were two bids for each project. The results of the bid opening are as follows: Chipseal Project Engineer's Estimate A-1 Paving Pack & Company $186,348.45 $159,900.00 $133,500.00 Overlay Project Engineer's Estimate A-1 Paving Pack & Company $85,197.69 $95,025.00 $100,050.00 The status of funds budgeted for this work is excellent due to favorable bids and need to delay some work. The total General Fund and Gas Tax Chipseal and Overlay budget is $240,163.00 and the bid for the work is $194,799.51. There is $45,363.49 available for additional work. The TIF Urban Renewal District budget for this work is $120,000.00 while the bid is $33,725.49. There is $86,274.51 available for additional work in the TIF Urban Renewal District. This is due in large part to a decision to delay surface repairs of some streets in order to permit completion of needed utility work. Based on the results of the bids, I recommend award of the Chipseal Project to Pack & Company. Paving. Based on the results of the bids, I recommend award of the Overlay Project to A-1 •. •' all •• . . ..I .. April23, 1999 TO: James C. Hansz, City Engineer FROM: David A. Holst, Construction Inspector D14 Re: 1999 Chip Seal Project Bid Results The analysis of the bid results for the above reference project is as follows: 1999 Chip Seal Project A-1 PaWn Ing- oumtfty Unit Price Total Price Traffic Control: Lump Sum $ 7,500.00 Bituminous Material: 360 Tons $190.00 : $ 68,400.00 Cover Aggregate: 1850 Tons $28.00 . $ 84,000.00 TOTAL BID:. $159.900.00 Pack and Com anV Unit Price Total Price AO00. /1 1 $18.00 ; All items related to the contract were analyzed for compliance to the specifications and bonding requirements. Both Contractors complied fully to those requirements. I am recommending that Pack and Company be awarded the 1999 Chip Seal Project in the amount of $133,500.00 PC: project file April23, 1999 TO: James C. Hansz, City End rater FROM: David A. Holst, Construction Inspector 1) (f Re: 1999 Street Overlay Bid Results. The analysis of the bid results for the above reference project is as follows: 1999 Street Overlay Project A-1 PavinP Inc- uanti Unit Price Total Price Traffic Control: Lump Sum $ 4,600.00 Surface Pre -Leveling: 200 Tons $ 22.75 $ 4,550.00 Keyway Excavation: 1,500 yd2 $ 4.00 $ 6,000.00 SS-1 Tack Coat: 25,000 yd2 $ .01 $ 250.00 Plant Mix Surfacing: 3,500 Tons $ 22.75 $ 79,625.00 TOTALBIDS.- $ 9S.02S. (10 Pack and Company Unit Price Total Price $ 4,500.00 $ 24.00 $ 4,800.00 $ 4.00 $ 6,000.00 $ .10 $ 2,500.00 $ 23.50 $ 82,250.00 10a 050, 00 • Note: A-1 Paving Inc. had a mistake on their bid document on the Surface Pre -leveling Total Price. 200 Tons @ $22.75 = $11,375.00. Correct amount is $4,550.00. All items related to the contract were analyzed for compliance to the specifications and bonding requirements. Both Contractors complied fully to those requirements. I am recommending that A-1 Paving Inc. be awarded the 1999 Street Overlay Project in the amount of $ 95, 025.00 Total budget for Gas Talc: $ 174 163.00 Total budget for General Fund Street Maintenance: $ 66,000.00 $ 240,163.00 1999 Overlay: - S 95,025.00 $• 145,138.00 1999 Chip Seal General: -$ 99,774.51 $ 45,363.49 Total budget for Tax Increment: $ 120,000.00 Tax Increment Chip Seal: $ 33,725.49 $ 86,274.51 pc: project file 1999 Overlay Project Quantity List 4/30/998:08 AM FY98199 Chip Seal Project General / Gas Tax cription From To # of Blks. Width #Into. Sq.Yd's. Tons Agg. Gallons Oil Est Cost EAL GENERAL / GAS TAX eE2st rth N. Main Hwy. 93 N. E. Arizona 4 55 3 8060 100.75 2,901.60 56,448.00 N. Main E. Arizona Lawrence Park 2 32 3 2960 35.75 1,029.60 52,288.00 1st Ave. W.N. Hwy. 93 N. E. Wyoming 1 34 2 1618 20.22 582.40 51,29422 1st Ave. E.N. E. Idaho E. Wyoming 5 42 4 7969 99.61 2,868.80 56,375.11 1st Ave. E.N. E. Arizona Cul-de-sac 1.5 30 1 1742 21.78 627.20 51393.78 1stAve. E.N. N. Main E. Arizx-- 2.5 25 2 2568 32.10 924.40 52,054.22 2nd Ave. E.N. E. Wyoming E. Idaho 5 32 5 6544 81.81 2,356.00 55,235.56 3rd Ave. E.N. E. Idaho E. Nevada 3.5 30 4 4469 55.86 1,608.80 53,575.11 4th Ave. E.N. E. Idaho North End 3.5 30 3 4227 52.83 1,521.60 $3,38133 5th Ave. E.N. E. Idaho E. California 3 32 3 3927 49.08 1,413.60 $3,14133 6th Ave. E.N. E. Idaho E. California 3 32 3 3927 49.08 1,413.60 53,141.33 7th Ave. E.N. E. Idaho City Limits 3.5 32 3 4460 55.75 1,605.60 $3,568.00 7th Ave. E.N. E. Idaho South End 1 32 2 1551 1939 558.40 512A.89 8th Ave. E.N. E. Washington E. California 2 32 2 2618 32.72 942.40 52,094.22 9th Ave. E.N. E. Oregon North End 1 32 1 1309 16.36 471.20 $1,047.11 E. W Hwy. 93 N. 8th Ave. E.N.. 9 32 7 11296 141.19 4,066.40 59,036.44 E. Nevada Hwy. 93 N. 3rd Ave. E.N. 3.5 32 3 4460 55.75 1,605.60 $3,568.00 E. W Hwy. 93 N. 2nd Ave. E.N. 3.5 32 3 4460 55.75 1,605.60 $3,568.00 E. Arizona N. Main 1st Ave. E.N. 1 32 1 1309 1636 471.20 $1,047.11 E. California 7th Ave. E.N. 8th Ave.E.N. 1 32 1 1309 1636 471.20 S 1,047.11 W. Ore on 2nd Ave. W.N. H 93 N. 2 32 1 2376 29.69 85520 51,900.44 Hospital Area ConwayDr. Hwy. 93N Claremont 3.5 32 2 4219 52.72 1,518.40 $3,37422 Claremont ConwayDr. Crestline 3.5 32 2 4218 52.72 1,518.40 $3,37422 Windward Way Sumiyside Heritage Wa 4 32 3 4993 62.42 1,797.60 53,994.67 Heritage Way Hwy 93 N. Windward Wa 3 32 2 3694 46.06 1,326.40 52,947.56 East Meridain Hwy 93 N. Wmdward Way 3 34 2 3884 48.56 1,398.40 53,107.56 Glacier View St. Sunnyview Lane Cul-de-sac 1 20 1 909 _11.36 327.20 5727.11 Crestline Ave. IMission St. Buffalo Hill Dr. 4 32 3 4993 62.42 1,797.60 53,994.67 Mission St Crestline Ave. Hwy. 93N 2 32 3 2860 35.75 1,029.60 52,288.00 Charlotte Ave. IMission St Buffalo Hill Dr. 41 241 21 36941 46.06 1,326.40 52,947.56 Buffalo Hill Dr. lCharlotte, Ave. JNorth End 1 31 321 21 36941 46.061 1,326.40 52,947.56 Northridre orthrid a Dr. Hwy. 93N West End 9 35 6 11953 149.42 4,303.20 59,562.67 Sherry Lane Northern Lights Summit Ride 11 35 10 15256 190.69 5,492.00 S 12,204.44 Sherwood Parkway Dr. Crestview 3 30 3 3727 46.58 1,341.60 52,981.33 Ashley Court Sherwood North End 1 34 2 1618 2022 582.40 51,29422 Parkway Dr. Meridian Rd. lNorthridge Dr. 8 42 2 11694 146.06 4,206.40 59,347.56 Garland St Sherry Lane Sherry Lane 5 34 4 6636 82.94 2,388.80 55,308.44 Kristen Dr. Sherry Lane Sherry Lane 3 35 2 3994 49.81 1,434.40 $3,187.56 Sunset Court Sherry Lane Cul-de-sac 1 32 1 1309 16.36 471.20 51,047.11 Total Estimated Quantities for Chip Seal's 132.5 108 175043 2,188.04 63,486.80 $141,081.78 APPLICATION RATE: .36 gallons CRS-2R per sq.yd. 25 pounds cover aggregate per sq.yd. COST EST.: $0.90 sq. yd. 4127/999:07 AM 1999CS Description From To # of Blks. Width # Inter. Sq.Ycfs. Tons Agg. Gallons Oil Est, Cost Cff1P SEAL GENERAL TAX INCREMENT 1st St W. 5th Ave. W. 6th Ave. W. 1 32 2 1551 19.39 558.40 $1,163.33 5th Ave. W. 1st St W. i lth St W. 10 30 10 12422 155.28 4,472.00 $9,316.67 6th St W. Main St 4th Alley W. 5 30 4 5969 74.61 2,148.80 $4,476.67 6th St W. 4th Alley W. 6th Ave. W. 1.5 54 2 3194 39.81 1,146.40 $2,388.33 6th St W. 6th Ave. W. 7th Ave. W. 1 35 1 1409 17.61 507.20 $1,056.67 1st St. E. Main St 3rd Ave. E. 3 32 3 3927 49.08 1,413.60 $2,945.00 9th St W. 1st Ave. W. 5th Ave. W. 4 35 3 5393 67.42 1,941.60 54,045.00 Fst Ave. W. W. Center St 4th St W. 4 51 4 7769 97.11 2,796.80 55,826.67 1st Ave. W. 4th St. W. 12th St W. 8 34 8 11004 137.56 3,961.60 $8,253.33 3rd St E. Main St 3rd Ave. E. 3 30 1 3242 40.53 1,167.20 $2,431.67 Montana St Main St 3rd Ave. E. 3 40 2 4484 56.06 1,614.40 53,363.33 Total Estimated Quanities for Chip Seal's 43.5 40 60356 754. 21,728.0 #45,266.67 4/27/999:58 AM Page 1 1999 Overlay Project Quantity List 7w OVERLAY ai. �Y x y� par w �IH1; �F �':al li l4 ; eMt! :.: ... :.: I 4 N "^. R . g , ar, .8a z* » �, 3� ilk A� Description From To # of Blks. Width #Inter. Yd's. Tons Estimated Cost Wedgew—oodn. Northern t is y SaliTi Court Garland Northern Lights , 422.27 Hilltop Ave. Garland Salish Court 1 32 1 1309 191.32 $4,037.92 ve. a erry a 44 ,731.68 MAve. Sherry Lane West End 21 34 2, 2751 391.10 estview n. o e CiiiMew Noruindge IN. New Phase 34 2m Traffic Control Lump Sum $7,000,00 Prc-Leveling Asphalt 15U tons TOTAL $85,197.68 4/29/994:55 PM