05. Low-Cost Evaluation of WWTP Capacity and Upgrade FeasibilityMEMORANDUM
March_ 16, 1999
�0
To: Al Thelen, Interim City Manager
From: Jim Hansz, Director of Public orks
Subject: Low-cost Evaluation of WWTP Capacity and rgradeeasibility
A short time ago in connection with the City Council discussion of extension of services
to the Farris property, the Mayor asked whether the WWTP could be evaluated at a reasonable
cost to identify capacities and upgrade potential. In response to the Mayor's inquiry, we have
obtained engineering proposals from three consultants experienced with the BNR treatment
process in use at the City's WWTP. The consultants are Stantec Consulting of Victoria who
designed the plant, Morrison — Maierle who have assisted the City with numerous operations and
maintenance projects at the plant, and Neil Consultants whose personnel were involved in the
original design evaluation of the plant.
We believe that all the consultants are, technically, able to perform an evaluation of the
facility, but after reviewing the proposals, Joni and I agree that the proposal by Stantec will best
meet our needs and provide the answers sought with the least burden on City staff. With this
thought in mind we are prepared to begin working with Stantec to develope4 a detailed work
scope, task schedule and budget. The budget that is required for this effort is approximately
$10,000.00. This amount is available in the current budget due to very favorable operating
experience to -date.
The following questions need to be answered:
• Does the City Council desire this work to be performed?
• If so, this year or next?
Please advise the direction to proceed on this matter.
Post Office Box 1997 • Kalispell, Montana 59903-1997