Loading...
2. Downtown Urban Renewal BudgetMEMO To: Mayor and City uncil From: Al Thelen Date: March 5, 1999 Re: Downtown Urban Renewal Budget for FY2000, 2001 and 2002 The initial data on this item was sent to you on February 16, 1999. We have added information on two previous occasions and have updated the spread sheets each time, and once again with this memo. A March 3, 1999 memo from Tun Hansz, on the cost of utility work in 1 st Alley East, is a new cost item and has permitted a major reduction in this item. The recent information that we received on the projected costs for the City's participation in the Downtown BID also allowed us to reduce expenditures. We have invited representatives of Flathead County and the Hockaday Museum of the Arts to be at the meeting to discuss their projects with you. We now have a projected total deficit of $1,768,327. The City needs to reduce the projects in FY 2000 by $2,051,658, and $283,331 can be transferred to FY2001 and 2002. It may be easier to cut the $1,768,327 and then adjust between fiscal years so we don't exceed our cash available in a given year. Page I Post Office Box 1997Kalispell,• .91 •• v DOWNTOWN TAX INCREMENT FY1999 Cash on Hand 7/1/98 $1,716,410 Bond Reserve Taxes rec. FY99 (Real & Personal) $2,200,000 Sale of Land (fy99 received) $296,073 Interest Earnings - est. $94,000 Loan Repayments $6,500 Available $4,312,983 Anticipated Expenditures FY (see detail) ($3,317,592) Cash Carroyover -July 1, 1999 MLa91 Expenditure Detail: Future years expenditures: Debt Service Administration Market Place III (carryover) Parking (carryover) Lots So. of City Hall Tele/Sportman lot City Hall Imrpv/design fees/study (carryover) City Hall Construction Urban Design contract services (carryover) Historic Preservation (carryover) Parking Lot Improvements(carryover) Studies / Surveys (carryover) Ave. of Arts/Conrad Connection (carryover) Custom Design Grant (carryover) KDC Site (estimated -memo 3/3/99 -utilities-Ist Alley E.) Commercial Loans Water projects Reconstruct 1st Ave. E., 6th to 12th st. Traffic Signal -1st W & 3rd Ave. Overlays/chip seal Alley Paving-20 blocks per year Storm -reconstruct & raise -1st Ave. E. to 5th Ave. W. Alley -reconstruct concrete -2nd Alley E. Sidewalks Parks Dept. Downtown beautification Hwy 93 South project BID assessments BID Improvements requested Hockaday rehab County request -Detention center elevator County request -Detention 2 cell addition-50% match County request -Youth Court Services addition Health Dept. new building Redevelopment (unallocated) Total expenditures requested by year REVISED 3/3/99 FY2000 FY2001 FY2002 $995,391 ($2,051,658) ($2,291,025) $123,046 $2,200,000 $2,220,000 $2,230,000 $85,000 $75,000 $50,000 $12,732 $9,432 $6,132 $3,293,123 $252,774 $118,153 ($5,344,781) ($2,543,799) ($1,886,480) $262,025 $275,000 $80,000 $800,000 $354,076 $30,000 $15,000 $35,000 $15,000 $150,000 $2,500 $1,000,000 $50,000 $30,000 $650,000 $140,000 $140,000 $40,000 $35,000 $80,000 $75,000 $25,000 $800,000 $11,180 $258,225 $282,800 $275,000 $275,000 $500,000 $2,500 $2,500 $50,000 $50,000 $490,000 $525,000 $140,000 $140,000 $40,000 $75,000 $75,000 $25,000 $25,000 $11,180 $250,000 $221,894 $130,000 150,000 $175,000 $11,180 $500,000 $5,344,781 $2,543,799 $1,886,480 taxincr2 3/3/994:42 PM Page 2 Spent or Anticipated to be spent FY99: Hockaday (air conditioning) $10,200 Library (carpet) $75,000 Building Improv. (City Hall) $30,924 Administration -(transfer, audit,FERDO) $275,543 Redevelopment $24,237 Housing & Commercial loans $30,927 Removal of Blight $16,166 Debt Service -current year $258,765 Commercial Loans: Center St. Plaza $74,000 Public works infrastructure $1,211,436 Antique light repainting $6,000 Parks appropriation $26,950 Projects: Central school $1,098,152 KDC site $179,292 Market Place III $0 Parking $0 SUBTOTAL fy99 $3,317,592 taxincr2 2/ 16/99 Page 3 MEMORANDUM March 3, 1999 To: Al Theten, Interim City Manager From: Jim Hansz, Director of Public W rk Subject: Cost of V Alley East Utility work The Downtown Business Association and others have asked that the City Council consider the extension of the I" Alley East utility under grounding project. In response to the direction of the City Council, we have met with all the utility companies involved and have requested their preliminary estimates of the costs of extending this project. Our conversations with the utility companies resulted in their suggestion that extending the project to 5`h Street could realize some cost savings and reduce project complexity. Based on this, we asked them to make the preliminary estimates. We also made estimates of the costs for City work assuming the same type of work done on the initial project phase. Virtually all the utilities have cautioned us that their estimate is preliminary, and is not based on any detailed engineering. All the estimated costs are summarized on the attached memo from Fred Zavodny, our Project Manager. The total estimated cost is $935,000.00. Please understand that these are preliminary estimates that are not based on detailed engineering. The costs will probably change when detailed engineering is completed. Further, bid costs are often very different from estimated costs. Therefore, the City Council should use this data with great caution and should not depend on it to be a firm cost estimate. Page 4 <.� .. �,.�. is r �r `���. - � � 1 ' � • • r s � �- MEMORANDUM Date: March 2, 1999 To: James Hansz, Director of Public Works From: Fred Zavodny, Project Manager F Re: First Alley East - Phase II (A-163-99) Following are the estimated costs to underground the overhead utilities in First Alley East from the Liberty Theater to Fifth St East. CATEGORY SOURCE OF ESTIMATE Conduit and Vaults Excavation and Installation of new Concrete Alley, Curb - and Asphalt Replacement Storm/Roof Drain System Electrical Service Crossovers Alley Lighting Design/Inspection/ Contract Administration a 15% CenturyTel $190,000 @ 50/50 FEC $300,000 a 50/50 TO Communications City PWD City PWD City PWD City PWD City PWD City PWD CenturyTel FEC City PWD Sub Total 10% ContingencN Total Estimate ESTIMATED COST $ 177,000.00 $ 175, 000.00 $ 82,000.00 $ 60,000.00 $ 28,000.00 $ 78,000.00 $ 95,000.00 $ 150,000.00 $ 5,000.00 $ 850,000.00 $ 85,000.00 $ 935,000.00 Both FEC and CenturyTel have spent considerable time preparing estimates as requested. However both FEC and CenturyTel have advised us that the estimates are preliminary. The estimates provided by the PWD were primarily obtained by proportioning the costs of the completed section to the remaining 3 l /2 blocks. Page 5 L MEMO To: Mayor & City Council From: A] Thelen, Interim City Manager Date: February 16, 1999 Re.: Downtown Urban Renewal Budget for the Current Year and the Last Three Years of the Program The attached spreadsheet identifies the fund available in the Downtown Urban Renewal Project for this year FY 1999 and FY 2000, 2001 and 2002. Page 2 shows the projected expenditures for FY 99, and the projected cash carry-over at the end of each year is also included. We have identified projects included in this year's budget that will not be complete this year as "carryover" projects in FY 2000 since the Council approved them in the current budget and they were not completed. In addition, we have identified all of the "wish list" that we have received for the next three years. These are projects that have been identified but not approved by the City Council. As you will note, projected costs exceed projected revenues by a collective $2,034,995. You will need to cut expenditures to match the anticipated revenue and perhaps carry some funds in an unallocated category for each year to provide some flexibility so that you can react to projects that cannot be identified at this time. In addition, the County has indicated that they will submit some additional requests later this week. As you will note, the City's last bonds will be amortized on July I of 2002 and then we will not receive further increment funds from this project. Page 6 Post Office Box 1997 - Kalispell, Montana 59903-1997 Telephone (406) 758-7700 - FAX (406) 758-7758 Mayor and City Council Page 2 February 16, 1999 Public Works Director Jim Hansz and Parks and Recreation Director Iv ike Baker have prepared further break downs of requested funds relating to their departments. They have been directed to identify all of the possible projects in the Downtown District so the general funds and other City funds will not have to be used for water sewer, storm sewer, sidewalks and parks in the near future and to allow the City to use its other available funds in areas outside the Downtown Urban Renewal District. The -funds to expand the City Hall space have in part been in the budgets for the last several years. It would be unfortunate if this City need is not addressed in the next three years. The request from Hockaday Museum came in today and is attached. I have also included a memo from Finance Director Amy Robertson that identifies her projection on how our property tax funds will be impacted once the Downtown Urban Renewal valuations are returned to the general tax rolls in 2002. The General Fund is projected to gain $265,955 but administrative costs totaling $258,043 will no longer be charged to this Downtown Urban Renewal Project. Remember this is only our projection and actual numbers will vary. I have also included a tentative calendar for the upcoming budget. If we can receive your input to the Downtown Urban Renewal Project in the next few weeks, it will give us a jump start. If you have additional concerns about budget items that you want staff to review or research, please let us know. We are scheduled to report on the requirements of CI-75 on February 22 and will list the Downtown Urban Renewal Fund for a workshop on March 8. Page 7 Date: January 281`, 1999 TO: All Departments From: Amy Robertson Finance Director RE. Budget Schedule for FY2000 budget CI-75 February 12`' - Special Street, Storm Sewer, Solid Waste budgets due February 19' - General Fund budgets due in the Finance Office February 22" d - Council Work Session -Ballot items March 1" - Council Adopt resolutions for ballot March 8' - Council review Downtown Urban Renewal Projects March 12' - Remaining Budgets due in Finance Office March 1 S'h-31st - City Manager review with department head April ls' -1 & - Budget revisions - new City Manager review April 30' - Preliminary budget to the printer May 100 - Preliminary budget to Council -Work session June 21st - Council adopts preliminary Budget June I' -Election ???? CI-75 July &* - Public Hearing (regular meeting -Tuesday) July 19`h - Adopt Final Budget Budget must be adopted by Aug. 9' 1999 Page 8 MEMORANDUM February 10, 1999 To: Al Thelen, Interim City Manager From: Jim Hansz, Director of Public or Subject: TIF project clarification Projected Public Works needs within the Downtown TIF District total approximately $740,000.00 to $1.2 million each year through the year 2001. The projects are as follows: FY 1999/2000 • Pave alleys, 20 blocks, phase I $40,000 • Replace sidewalks $75,000 • Reconstruct & raise storm drains from $35,000 I" Ave. E. to 5`� Ave. W. • Reconstruct I' Ave. E., 6`h St. to 12'h St. $650,000 • Reconstruct concrete, 2' Alley E. $80,000 • Replace hydrants, phase H $30,000 • Chipseal & Overlay streets $140,000 • Traffic Signal @ V Ave. W & 3' St. $140,000 Total $1,190,000 FY 2000/2001 • Pave alleys, 20 blocks, phase H $40,000 • Replace sidewalks $75,000 • Chipseal & Overlay streets $140,000 • Replace Cast Iron Water Main, 3' Ave. W. $250,000 • Replace Cast Iron Water Main, various locations $240,000 Total $745,000 FY 2001/2002 • Replace sidewalks $75,000 • Chipseal & Overlay streets $140,000 • Rehabilitate 20", 18" & 16" Water Mains, $525,000 Main St. & Center St. Total $740,000 Please let me know whether this provides the added detail you need. Page 9 Post Office Box 1997 - Kalispell, Montana 59903-1997 11111IN111011101ME= Telephone (406)758-7700 - FAX (406)758-7758is Mid • TO: Al Thelen, Interim City Manager FROM: Michael Baker, Di Parks & Recreatio DATE: February 16, 1999 RE: Downtown Tax Increment Budget Dear Al, The following is a request for Downtown Tax Increment funds for the next three fiscal years: Fiscal Year 1999-2000: 1. Downtown street tree and grate replacement program (Establishment of new tree locations in TIF District) . . . . . . 2. Downtown landscaping: flower and shrub replacement. . . . . . . . . . . . . . 3. Downtown bench requests and replacements . 4. Depot Park juniper garden and sign replacement. . . . . . . . . . . . . . . 5. Gallagher Park tree plantings(4) . 6. Courthouse Park tree plantings (4 replacements) . . . . . . . . . . 7. City Hall patio improvements (carry over) . . . $10,500.00 . . . . 3,750.00 . . . . 2,450.00 . . . . 4,500.00 . . . . 1,400.00 Total Fiscal Year 1999/2000. . . 1,400.00 6,500.00 $30,500.00 Page 10 1 Al Thelen, Interim City Manager February 16, 1999 Page Two Fiscal Year 2000-2001: 1. Downtown street tree and grate replacement program (Establishment of new tree locations in TIF District) . . . . . . . . . . . $10,500.00 2. Downtown landscaping: flower and shrub replacement for City Hall, Depot Park gardens, and downtown planters . . . . . . . . . . 4,000.00 3. Downtown bench and tables requests and replacements . . ... . . . . . . . . . . . . . . . 2,500.00 4. Courthouse Park irrigation improvements (east side of Park, Phase I) . . . . . . . . . . 10,000.00 Total Fiscal Year 2001/2002. �27,000.00 Fiscal Year 2001-2002: 1. Downtown street tree and grate replacement program (Establishment of new tree locations in TIF District) . . . . . . . . . . $10,500.00 2. Downtown landscaping: flower and shrub replacement for City Hall, Depot Park gardens, and downtown planters . . . . . . . . . . 4,000.00 3. Downtown bench and tables requests and replacements . . . . . . . . . . . . . . . . . . . 2,500.00 4. Courthouse Park irrigation improvements (west side of Park, Phase II) . . . . . . . . . 10,000.00 Total Fiscal Year 2000/2001. 52.7,000.00 The above requests are items that are foreseeable in the next three years. However, from year to year there will be a need to revisit each request and estimate. If further information or explanation is needed, I'll be free to discuss this with you. Thank you for your consideration of these requests. MB/dlw Page 11 DATE: February 12, 1999 TO: Mayor Boharski Council Members FROM: Amy Robertson Finance Director RE: Increment after 2002 As you know our final payment on the downtown tax increment bonds is due on July 1, 2002. Of interest to us all is the resulting tax changes that will occur with the valuation changes on the November 2002 tax distribution. Using current valuations and mill levies we would see the following: $3,929,012 TIF taxable value x 111.16 mill value = $ 436,850 Using the current 67.66 mills for the General fund = $ 265,955 9.00 mills Comp. Ins. _ $ 35,385 14.00 mills Retirement = $ 541999 18.00 mills Health = $ 70,726 2.50 mills Debt = $ 9,785 Of course, by 2002 the debt service will be gone. If the mills are dropped then the revenue will be gone also. The need for additional funds in the comp insurance, health and retirement funds will depend on the level of staffing at that time. For example, if by then we add another fire hall the need may be there. The other side of the coin is that we currently have an administrative transfer which moves $225,693 into the General Fund from TIF. That will go away. We also pay out of TIF $37,350 of the FERDO contract which will need to be paid from the General Fund. Other smaller items such as audit fees $2,500 and City Hall landscaping $3,750 will move to the General Fund. Bigger items such as the chip seal and overlay budget will move to General or Special Street Maintenance funds. All improvements to the City Hall building and other public buildings will have to be funded by the General Fund. The taxable value and the number of mills may be different by 2002. Page 12 At t, HocKADAY MUSEUM OF ART P.O. Box 83, Kalispell, Montana: 59903 Second Avenue East at Third Street (406) 755-5268; fax (406) 755-2023 e-mail: hockaday@bigsky.net Hockaday Museum of Art City Budget Request 1999/2000 The Hockaday Museum of Art requests $221,894 for the repair and rehabilitation of the Carnegie Library Building that is the home of the museum. It should be noted that the repairs requested are designed to conserve the existing building and will be needed to maintain the building in good and safe operating conditions and at the same time insure that the proper preservation of the historic structure. The Hockaday Museum of Art recognizes that the amount of the request is significant and that referencing the architectural and conservation survey, a comprehensive renovation plan should be developed for the extent of repairs currently under consideration. The museum additionally fully intends to assist the city in locating other contributing resources to fund the project where possible. Other sources of funds may be the Institute of Museum and Library Services Conservation Project and the Heritage and Preservation Program Funds. Brief History of the Carnegie Library Building: The Carnegie Library Building was built in 1904 at a cost of just under S10,000. It housed the County library until the library moved to its current location in the late 1960's. In 1968 the Flathead Valley Artist Association was granted occupancy of the building, where they produced the first art programs in the valley. In the 1970s the FVAA named themselves the Hockaday Center for the Arts, to honor local artist and teacher Hugh Hockaday for his contributions to the community's art program. The center served as the primary arts program in the valley for many years. During the late 1970s the programs took on the responsibilities of a visual art museum, as the center's collection programs grew. In 1997 the HCFA became the Hockaday Museum of Art to reflect the museum's primary role as a visual art museum. Now, as then, the Hockaday Museum of Art is the only visual Art museum serving Kalispell, the Flathead Valley and all of Northwestern Montana. The building has been in service now for almost 100 years. During that time many renovations have t,4ken place to address the needs of the structure. The majority of the original building today remains unchanged. Recent renovations included a new addition in 1987 that included an elevator. In 1996 all of the museum's restrooms were made accessible for all people. In 1998 the addition of air-conditioning and the addition of a 400 amp electrical service were added to the building. During 1998 portions of the lower level were cleaned up and repaired by museum staff and volunteers. Most of the work was focused on the clean up of years of neglect. Past renovation efforts addressed important needs, but left many other areas of the building in need of updated renovation. The neglected areas are the focus of this proposal. Page 13 Al! 11 ART P.O. Box 83, Kalispell, Montana: 59903 Second Avenue East at Third Street (406) 755-5268; fax (406) 755-2023 e-mail: hckaday@bigsky.net This request is for the interior renovation of the lower level, the main (upper) level and for the exterior restoration of the original building. Many of the items in the request need priority attention, where other items could be scheduled over several years if there was a focused plan developed for the project. It may be worth noting that investing in this building at today's costs could result in significant savings rather than risk increased expenditures by delaying the renovation/restoration. The lower level mechanical area and fixtures need to be updated to meet current building code. Walls and ceilings need to be repaired along with electrical and plumbing systems. - Flooring is in poor condition and needs to be replaced; it is now more than 50 years old The museum repaired and replaced flooring in the most urgent needed public areas this past year in the lower level, but was unable to refurbish the largest room's floor. The electrical system in the original building needs to be rehabilitated and tied into the newer existing system. This will solve many long-term problems. The repair and renovation of the main floor areas of the original building will insure the stnxture remains in good condition. The wood floor needs to be repaired now to preserve them for the future. Carpet in the new addition is worn and in need of repair. The original windows need to be opened and rehabilitated, as well as the interior dome of the building, to stop further destruction of the building. The exterior of the structure needs to be repaired and painted with further attention to drainage, so the lower level does not sustain further water damage. The museum and it's volunteers repaired years of water damage to the lower level this past summer. The volunteers worked on landscape and roof maintenance as part of a permanent solution to water drainage. Rain gutters need to be replaced and added along with groundwork to move water away from the building foundation. All exterior wood surfaces need to be repaired and painted. The original roof on the very top of the building and dome needs to be repaired, they are now 96 years old_ The scope of the current request will address the majority of the building's needs and will reduce the cost of repairs in the future with the creation and implementation of a building maintenance plan. The Hockaday Museum of Art is committed to the preservation of the Carnegie Library building as part of the community's historical architectural heritage and will assist the City of Kalispell in the renovation and maintenance of the building. Page 14 HOCKADAY MUSEUM OF ART P.O. Box 83, Kalispell, Montana: 59903 Second Avenue East at Third Street (406) 755-5268; fax (406) 755-2023 e-mail: hockaday@bigsky.net Priority Item Budget S1 Demolition budget: Remove acoustic ceilings, Remove partition walls, 6500 Remove shelving, Move stored items, Remove header, Remove bathroom, Remove SS Sink, Remove doors, Remove carpet, Remove HVAC Chase, Clean Up Total Demolition Mechanical / Workroom budget: S1 Level Floor 500sf 2500 S1 Partition HAVOC 1160 S1 New Ceiling 1 hr 425sf 950 S1 Flooring Vinyl Base425sf 725 S1 New Doors 2 Each 450 S1 Paint Seal Walls 800 S1 Patching Allowance 500 Total MechanicaYWorkroom Lower Level N.E. budget: S1 Patch and Paint 48x24 2250 S1 New Carpet 5120 S1 Repair Old Ceiling 1170 S1 Revise Ductwork 5500 Total Lower Level N.E. Lower Level S.E. budget: S1 Patch Vat Floor 400 S1 New flooring 780sf 1500 S1 New ceiling 1hr 780sf 1560 S1 Paint and patch walls 720 S1 Phone Line Reroute 1500 S1 Revise Sanitary Main 2400 Total Lower Level S.E. Kitchenette budget: S1 Partition 600 S1 Plumbing 900 S1 Sink 450 Donation Appliances 1900 S1 Cabinets 1800 Total Kitchenette Totals 7085 14040 =5:{ K-RII Page 15 HocKADAY MUSEUM OF ART P.O. Box 83, Kalispell, Montana: 59903 Second Avenue East at Third Street (406) 755-5268; fax (406) 755-2023 e-mail: hockaday@bigsky.net Exterior Repairs budget: S1 Add Gutters 360 S1 Repair Gutters 240 S1 Repair Exterior 3600 S1 Walkway Drainage Southside 3400 S1 West door HDHA 2750 S1 Painting Exterior 3000 S2 Repair Copper Roofing 15000 Total Exterior Repairs 28350 Main Level Repairs budget: S2 Restore Dome 1400 S2 Repair Interior Dome 5000 S1 Refinish Floors 3400 S2 Restore Windows 8000 S2 Remove False Walls 800 S2 Repair Walls 1000 S2 Moveable Walls 3200 S1 Carpet New Addition 7601 Total Main Level Repairs 30401 S1 Electrical and Lights budget: 36000 Total Electrical and Lights Rehab 36000 Fire System budget: S2 Fire Suppression System 40000 S1 Fire Detection and Security 13547 Total Fire System 53547 S1 General Contractor Costs 17% (permits, fees, etc.) budget: 32241 Total General Contractor Costs 32241 Total Projects Budget 221894 If project broken down into Phase 1, Phase 2 & Donations: Total Phase 1 145594 Total Phase 2 74400 Total Donations 1900 Page 16 DATE: February 18, 1988 TO: Amy Robertson, Finance Director FROM: Susan Moyer, PECDD SUBJECT Addition to Flathead County 2001 TIF request Amy, Earl Bennett just called me to add $130,000 to the county's TIF request to cover the cost of an elevator in the detention support area. This, as well as the items sent over earlier, are requested for the years 2001. The elevator work is needed to be in compliance with ADA requirements. Please attach this memo to the previous correspondence. ter C:\myfiles\pecdd\tif budget Page 17 Flathead County Juvenile Detention Facility 800 South Main Street ----Kalispell, Montana 59901-----(406) 758-5919 February 17, 1999 • , ' . • • it I71I Mor, ' 1 re 10IT, ) . ' • 11 � � • On numerous occasions since becoming director of this facility, youth in need of secure detention have been turned away from this facility due to our being filled to licensed capacity and Flathead County's policy to not exceed licensed capacity. I believe that there presently exists a need to add four additional secure beds to this facility. At the same time, Flathead County Youth Court Services has a great need for additional space to meet their needs. (See attached letter from Pat Warneke) Since Flathead County Youth Court Services is situated directly adjacent to our facility, additional space for them could be derived by adding a second level to our proposed cellblock addition. On February 17, 1999, Mr. John Peterson of Architects Design Group viewed the present building with Chief Probation Officer Pat Warnecke and with me and discussed with us, the possibilities for expansion_ Out of this discussion, it was determined that the most feasible means of adding this needed space appears to be adding two cells to the west side of the existing building, leaving a corridor between the two buildings so natural light requirements for the existing cells may be satisfied. Estimated costs for the 2-cell addition would be $300,000 and an additional $175,000 for the Youth Court Services addition. (see attached plans/estimates from Architects Design Group). I understand that there may possibly be Kalispell city tax increment funds available for projects of this nature and that there also may be the possibility of tapping Juvenile Justice Accountability Incentive Block Grant #99-10 funds as well. In the case of JJAIBC #99-10 monies used for renovation or expansion juvenile detention facilities, a 50 percent match is required. It may be possible to use the city monies Page 18 to satisfy the 50 percent match requirement of the JJAIBG #99-10. This would need to be checked into further. In closing, I would like to state that I feel the need for two more cells has and does exist and that the possibility of these two funding sources makes it the right time to consider moving ahead with this project. This addition could be used to house female inmates in a wing separate from male inmates, thus lessening or eliminating many obvious problems we encounter here on a daily basis. Also, due to the eight - to -one staff -to -inmate ratio required by the Montana Department of Corrections, a sixteen -bed facility may be operated with the same staff and for nearly the same costs required to run a twelve -bed facility. Thank you for your consideration in this matter. If you have any further questions, please feel free to contact me. eerely, Osler, Director Page 19 TED O. LYMPUS KATHERINE R. CURTIS Youth Cart Judges Youth Court Services Eleventh Judicial District 800 South Main - Kalispell, MT 59901 (406) 758-5541 FAX 758-5860 February 17, 1999 TO: District Court Judges Flathead County Commissioners FROM: Pat Warnecke, Chief JPO RE: New Construction G� W. PATRICK WARNECKE Chef Probation Ot6oer DEPUTIES Noel Kradc Errsabelh A Moothart Thomas DtrraW If plans on adding two more cells to juvenile detention entail building outward, I would hope that expanding the above floor area of Youth Court Services would be included. The need for space in the Youth Court office was made known in the 1998-99 budget request. At present CC: Earl Bennett Scott Osler Three deputies share one office. Two clerical staff and occupy the foyer / lobby area. One restitution officer occupies the foyer / lobby area. A conference room doubles as a hearing room for intake. The floor lacks sufficient storage space for the office. Page 20 111l/1 IL I\ 1 1 L.11`4 LL I Page 21 C I%lVI L..1N 1 1 LI1VL FLATHEAD COUNTY YOUTH COURT ADDITION /, tct>tteots f/// Page 22 FLATHEAD COUNTY JUVENILE CENTER ADDITION 16-Feb-99 JUVENILE CENTER New Construction 500 s.f. $300.00 per s.f. $150,000 Remodel Lump Sum $50,000 .`Site Improvements Lump Sum $30,000 Design Fee 10.00% $23,000 ContingencyConfingency 15.00% $34,500 ' Printing $2,000 Owner Fixtures & Equip. i $4,000 Contractors Tax 1.00% $2,300 i Building Permit 1.50% $3,450 Misc. SUB TOTAL ; i YOUTH COURT ADDITION ' I New Construction 760! s.f. $95.00 per s.f. $72,200 Remodel Lump Sum $50,000 Site Improvements Lump Sum ! $0 Design Fee 10.00%; $12,220 Contingency 15.01M $18,330 Printing $1,000 Owner Fixtures & Equip. ! $15,000 Contractors Tax 1.00% $1,222 Building Permft 1.50%1 j $1,833 Misc. 53.195 SUB TOTAL. I $175,000 i Architects Design iF//2 Group Number One Sunset Plaza • Kalispell, MT 59901 406.257-7125 FAX 406.756-3409 T� i 1 -� 7� °°o Page 23