4. Award Bid - 2000 Epoxy Paint Striping ProjectCity of Kalispell Post Office Box 1997 - Kalispell, Montana 59903-1997 -Telephone (406)758-7700 Fax(406)758-7758 REPORT TO: Mayor and City Council FROM: Jim Hansz, Director of Public Works SUBJECT: Bids for 2000 Epoxy Paint Striping Project MEETING DATE: September 5, 2000 BACKGROUND: In years past the City has arranged for the striping of the streets via the annual MDT contract for this work. City streets were done at the same time MDT work was done and MDT billed the cost to the City, usually late the next year. Last year, after preparation of the annual budget, the City was informed that we would need to make alternate arrangements because the state would no longer allow us to use their contract to get our work done. Further, we were informed that the state would be specifying longer life epoxy paint rather than latex paint. This unanticipated change caused us to not do striping earlier this year due to lack of funds. We programmed additional funds for this work in the current budget and on August 25, 2000 we received bids for striping approximately 25 miles of four -inch wide striping and other pavement markings to be done in long life epoxy paint. We anticipate that this material will yield a life span of about two years as opposed to the standard paint that required striping about twice a year. On the 25`" we opened bids from Mark Rite Lines, Arrow Striping, and Highway Specialties. Mark Rite Lines of Billings submitted the low bid of $41,099.00 for the work. This bid is $10,099.00 more than the amount budgeted in the striping line item for the work. Any costs that exceed the funds available in the line item will be offset by corresponding reductions in expenditures for chipseal and overlay to ensure no overruns occur. The bid analysis is attached for review. RECOMMENDATION: Staff recommends award of the bid for the 2000 Epoxy Paint Striping Project to Mark Rite Lines of Billings, Montana based on the low bid of $41,099.00. FISCAL EFFECTS: The City will incur an estimated contract cost of $41,099.00. The actual amount will be based on the total measured quantities of striping and other markings in place and on the measured reflective performance of the painted material using MDT methods of performance measurement. ALTERNATIVES: As suggested by the City Council Respectfully submitted, C. Hansz, Chris A. Kukulski Director of Public Works City Engineer City Manager Report compiled August 29, 2000 Attachment: Bid Analysis y City of Kalispell E� Post Office Box 1997 • Kalispell, Montana 59903-1997 • Telephone (406) 758-7700 FAX (406) 758-7758 Augu , 2000 TO: James C. Hansz, City Engineer FROM: David A. Holst, Construction Inspector RE: 2000 Epoxy Paint Striping Project The analysis of the bid results for the above reference project is as follows: 2000 Epoxy Paint Striping Project Firm Name: Mark Rite Lines of MT, Inc. Item & Description Mobilization: Lump Sum Striping - 4" White Epoxy Per fin. ft. Striping - 8" White Epoxy Per lin. ft. Striping — Yellow Epoxy: Double Yellow line Per lin. ft. Skip Strip — White Epoxy: Per fin. ft. (Actual painted striping only) Words & Symbols -Epoxy Per sq. in. Traffic Control. Lump Sum Firm Name: Arrow — Stf•iping Mfg. Inc. Item & Description Mobilization: Lump Sum Striping - 4" White Epoxy Per fin. ft. Striping - 8" White Epoxy Per fin. ft. Striping - Yellow Epoxy: Double Yellow line Per fin, ft. Skip Strip — White Epoxy: Perlin. ft. (Actual painted striping only) Words & Symbols -Epoxy Per sq. in. Traffic Control: Lump Sum Estimated Quantities Unit Price Total Price $ 359.50 31,500fn. ft. $ .12 $ 3,780.00 13,000 lin. ft. $ .24 $ 3,120.00 73,000 fin. ft. $ .24 $17,520.00 8,000lin. ft. $ .12 $ 960.00 3,000 sq. ft. $ 5.00 $15,000.00 $ 359.00 Total Bid $4 0-2-0 Estimated Quantities 31,500lin. ft. 13,000 lin. ft. 73,000 lin. ft. 8,000 lin. ft. 3,000 sq. ft Unit Price Total Price $ 2,950.00 $ .17 $ 5,355.00 $ .34 $ 4,420.00 $ .34 $24,820.00 $ .34 $ 2,720.00 $ 2.82 Total Bid $ 8,460.00 $ 2,624.0 _51.349_00 Item & Description Estimated Quantities Unit Price Total Price Mobilization'. Lump Sum $ 4,500.00 Striping - 4" White Epoxy Per lin. ft. 31,500 lin. ft, $ .13 $ 4,095.00 Striping - 8" White Epoxy Per ]M. ft. 13,000 lin. ft. $ .24 $ 3,120.00 Striping — Yellow Epoxy: Double Yellow line Per lin. ft. 73,000 lin. ft. $ .28 $20,440.00 Skip Strip — White Epoxy: Per lin. ft. 8,000 lin. ft. $ .14 $ 1,120.00 (Actual painted striping only) Words & Symbols -Epoxy Per sq. in. 3,000 sq. ft. $ 4.42 $13,260.00 Traffic Control-. Lump Sum $ 3,345.0 Total Bid $49 8, = X0. 00 All items related to the contract were analyzed for compliance to the specifications and bonding requirements. All contractors complied fully with those requirements