Public Works Monthly Activity ReportCity of Kalispell Post Office Box 1997 - Kalispell, Montana 59903-1997 - Telephone (406)758-7700 Fax(406)758-7758 REPORT TO: Chris A. Kukulski, City Manager SUBJECT: Monthly Activity Report for September 2090 FROM: James Hansz, Public Works Directo DATE: October 10, 2000 Highlights of monthly activity for the operating divisions of the Public Works Department for the month of September 2000 are as follows: ENGINEERING DIVISION 0 Awarded contract and completed epoxy striping of City streets. 0 Began water reservoir roof replacement project. 0 Began Main Street water line replacement project. 0 Continued meetings with business owners and service clubs to outline proposals for downtown streetscape project and gauge preferences for the project design elements. 0 Continued work on utility facility planning project. 0 Continued work on the Second Alley East sewer replacement project. 0 Continued working with MDT on the Willow Glen and Woodland Avenue project. 0 Met with Eagle Transit and County regarding the joint -use storage facility project agreement. 0 Attended the annual meeting of Glacier Village Greens homeowners to discuss annexation issues. 0 Received and awarded bid for a new leaf pick-up machine. 0 Received and awarded bid for a new tandem axle garbage truck. 0 Met with representative of commercial cell phone tower company about potentially construction of a tower at the Buffalo Hills site. 0 Continued research into alternative water metering systems and remote water meter reading systems. 0 Resumed field surveys of recent additions and projects to locate newer utility installations. 0 Located property line of alley intersecting California Street EN to assist Solid Waste Division. 0 Continued field surveys of the SE'/4 of Section 36 to assist the Parks Department (KYAC). 0 Met with two local surveyors and contacted MDOT R/W office in Helena to discuss right-of- way questions along Four -Mile Drive. 0 Prepared three worksheet maps and electronic file for utility study engineers. 0 Plotted two fire hydrant maps for the Fire Department. 0 Hired FVCC surveying student for work/study program to assist surveyor two afternoons a week. ENGINEERING DIVISION continued... 0 Conducted level loops in Tire Rama area to coordinate mosquito storm drain elevations with Hwy 93 Project. 0 Helped Assistant City Engineer to determine elevations for ground water test well in Four Corners area and drainage grade shots for one block on east side. 0 Checked elevations for concrete pad (ice melt tanks) at City Shops for the Street Department. OFFICE AND STAFF There were 9 emergency call -outs for the month of September: Z ■ Water Division - 3 ■ Sewer Division - ■ TSS Division - 2 ■ Street Division - ■ WWTP - 4 ■ Total - 9 CENTRAL GARAGE 76 repair orders were completed during the month of September: ■ Police - 13 ■ Streets - 20 ■ Fire - 6 ■ Garbage - 12 ■ Others — 25 ■ Total - 76 0 Continued regular maintenance of City vehicles and machinery. 0 Responded to numerous road calls. 0 Replaced ignition switch and burned wiring on garbage truck. 0 Replaced bucket teeth on Street Department Loader. 0 Replaced ignition controller and solenoid on mower. 0 Replaced steering console cylinder on new Cat Grader. 0 Winterize water system in Mobil sweeper. 0 Replace alarm module in Street Department tandem. 0 Ongoing modifications to new garbage truck. 0 Fabricate new PTO shaft for Water Department tandem. 0 Modifying new garbage truck per Foreman's request. 0 Replaced hydraulic hoses and air control valve assembly on the garbage truck. 0 Replaced radiator on the Street Division's pickup. 0 Replaced computer module, fan, and bearings on the Elgin Sweeper. SANITARY/STORM SEWER DIVISON 0 Continued video and jet cleaning of sewer lines Monday through Thursday. 0 Performed weekly maintenance of sixteen lift stations each Friday. SOLID WASTE DIVISION 0 Delivered 15 containers to new customers: 13 -100 gallon, 1 -400 gallon, 1 -300 gallon. 0 Repaired 3 containers and responded to 4 violations. 0 Continued weekly garbage service. 0 Continued weekly alley cleanup, Street Division assisting. 0 Started training new operator, Jerry Schroeder. STREET DIVISION 0 General sweeping and flushing of City Streets. 0 Alley grading ongoing. 0 Back filled driveway approaches in paved alleys. 0 Prepped 100 Hill top for patching and patched curb line at 100 Hill Top Avenue. 0 Cleaned City Shop yard. 0 Utility cut at 1st Avenue West. 0 Prepped area at shop for new deicer tanks. 0 Hauled sweepings to Lawrence Park. 0 Assisted the Water Division with the new water main in the City yard. 0 Moved power cable and conduit to new slab and finished forming slab for concrete. 0 Poured new concrete pad for the deicer tanks and plumbed in the new deicer circulation PUMPS. WATER DIVISION WATER PRODUCTION & STORAGE: 0 Produced 99 M gallons of water: 26 M gallons upper zone and 73 M gallons lower zone. 0 Injected 233 gallons of sodium hypochlorite, 12% solution to maintain an average chlorine residual of 0.26 PPM throughout the system. 0 Continued routine maintenance on all pumps, motors, chlorination equipment, grounds, buildings, controls, testing, and record keeping. 0 Drained Reservoir #1. 0 Contractor started roof repair/replacement work on Reservoir #1. 0 Installed water heater at Buffalo Booster Station. 0 Contractor installed underground phone lines across Lawrence Park to the Noffsinger Spring Pump Station. 0 Winterized all irrigation systems. 0 Rebuilt screen for ventilation at Noffsinger Spring Pump Station pump tunnel. 0 Removed old debris and boards from crawl space and wooden site board from Noffsinger Spring. 0 Completed all repair work from lightning damage of May 7, 2000. 0 Set up site tubes for #2 Reservoir. WATER CONSTRUCTIONAND SYSTEMREPAIR: 0 Tagged 65 delinquent accounts on the East Side of Kalispell. 0 Completed 90 work orders during the month of September. 0 Hauled old fire hydrants to Pacific Steel. 0 Assisted with 18" tap on Main Street. 0 Replaced fire hydrants at: 0 6th Avenue East & 13th Street East 0 6th Avenue East & 12th Street East 0 8th Avenue East & 12th Street East WATER CONSTRUCTIONAND SYSTEMREPAIR continued... 0 Repaired main break at lst Avenue East and Idaho Street. 0 Repaired service line at 625 Sylvan Court and at Main Street and 5m Street. 0 Repaired 6" gate valve at 1st Avenue West and repaired an 18" gate valve at Main & Center. 0 Replaced a 6" valve at Main Street. 0 Hauled sweepings to Lawrence Park. 0 Cleaned City yard for new wash pad. 0 Assisted with repairs of the main break on Kelly Road. 0 Repaired 18" bell joint on Main Street. 0 Installed 8" gate valve at Main Street and Market. 0 12x8" tap at Sunnyview. 0 Dug an 18" gate valve on Main Street and Market and opened it. 0 Dug and replaced curb and rod at 5th Avenue East and 6th Street East. 0 12x8" tap at Meridian and Center Street for Nupac. TRAFFIC SIGNS & SIGNALS DIYISON 0 Continued regular maintenance of signals, signs, luminaires, barricades, sight obstructions, and Airport lighting. 0 Coordinated with contractor to remove the four City owned luminaires on North Main Street by Depot Park. 0 Replaced missing sign poles by the Flathead High School. 0 Gathered cabinet electronics from Idaho & Main Street and stored at the TSS shop. 0 Furnished signs and cones for the Cross Country meet held at Woodland Park. 0 Spotted the City streets prior to striping. 0 Repaired damaged conduit at Main and Center Street where contractor hit conduit when digging for underground utilities. 0 Mark Rite Lines of MT, Inc. striped the City streets and avenues with epoxy paint during the week of 9/11/00. 0 Gathering traffic counts at 1st Avenue East and 11 th Street East. 0 Installed six meter poles in the O'Neill Lot for the Parking Commission. 0 Fabricated and installed new street name signs for the Contractor at Greatview. Provided 21hours of support to MDOT for sign and signal repairs in NW Montana at the following locations: Center & Main Street, Idaho & Main Street, Central & fd Street, Hwy 93 North & Hwy 4, Hwy 93 South & 18th Street, Main & Center & West Reserve — Whitefish, Idaho & 5th Avenue WN, and Hwy 40 & Hwy 2 East. WASTEWATER TREATMENT DIVISION 0 128 Work orders were completed during the month of September. 0 381 Lab tests were performed during the month of September. 0 11 Loads of sludge were hauled during September. 0 39,900 pounds of bio-solids were pressed. 0 August Permit Discharge Report: No plant violations. The average daily flow through the plant was 1.85 million gallons; the total monthly flow was 57 million gallons. 0 Replacing east primary clarifier chains, flights, and grease lines; rebuilding clarifier weirs. 0 �V�p- O Q g M v 44� R N O M d' np rt M .ob, — O em s, ea�o OaO �Y'�!. Pn-,. CCY, OM.� aO ^. *N'+ a�D„ 7 .�. N Q�+�". c+� vhi� c4, u? .A ar0,. P �^ V�� l� m N M M m N m N* m m M M m M M N w N N M M m N N i0 .+ f. aD N l+'� p� O tQ In CV a h .D N W pp a0 M 1n 1A OD O ifl .O h 0, M N 4'.1 OD CV N l� �D 000000 O aD O O. O. aD aD cO aO aO aD O. O CO CO h to P `a m �O 'O h h n W iO "0 o 30 -P- o IN ,.0 Lin JO 0- .ev :e 0 � ,•rr � €D ma Pr .• :� ., .• .� _u� to ., . aec r2 ie- we pp -re- cmr m: rh or; -� Na rn -_--v sav sav a me q- -tt- >'.k-'Q!3 � w, -te- -M -M -m- -�„^ '�'E!� ---m %i .,03 -ON --m .� �+` -ii -am -me -, @ .aw -, -CC! = 8+ '£R ro v "A 'D -g 't- iR w "NS -as 'EAR -t- -M TI 'm �k .-e 'M X> 4V ® -t- re -t- V- t-10 h ,0 Or IO .0 h t-10 W) n h 10 OD n h OS O .0 M r0 ,0 [- t- h 10 10 �cD� to <t aD ObIaAQ .D M M N N N N N N N N N M N N N N C N N N v .-, N N N N - — . . . . . . . . . . . . . . . . && , n- em CD =9 = m = ..« L-m um a w z t -- um cm m p a!= v m �: .m = . « al! m: = um ffi- £34 49a fSl - « -4w 4A ' CD a� 4FS; .-n 'IMA m 26; II'9 CT Vt Ht- m• _ _ _ _ _ _ _ _ _ _ _ i*-. SAY`, Q&' Vc- 13D CZI vV- ".06'. M- . - Un ;g, CD Tr, M t`F- M = �9 W =.- = � w&-- �-•- '' . r -' cc R 000 �+ m coo C9 CF VC- m m OC,G 1,� V� uC? m VC- Ow �_ CD l7Fi'� Yw) CF7 m ST�.3 1`f VC lw ur, ti- Im un. .q m m mm It m Ira, .m = W) cu Om cr O[Xi riP ODD i477 w m C�- V- {P PSG = = �a5 w m w ;. m = 'k' g 'm CS iLw GS C` .-+ P7: 69 '. �` • r-- Il.- OD L- = = ® rm to 0, u- = = , ".cm = ti II = ,r in 'm II"w 1II0 iA 01 N CN 00 O 00 O0 .O OD n in O n 0 n 01 O OD V N N V' ci C4 m A n O n V rn cl C : o ' n w a o n cq Qrn m g N cv �n rm cy, M Cl) u`ri^ N O N N O ,--� ,--� ti- f L i� � 06 d OD ifJ ;O .-i O (71 m o '+ •-+ -+ N N CJ N p N rod ' d tt+ M O upO� .+ a0 u7 V i�t ���pp � N pMp � sF Vi 1p tom- cT VN ti ch ova t.- m 0 B- LQ 0 cv 40 Ch OD V) .a- ¢ ra o 0 — a d- .-� a <r um Itz Asa• ;ice 125 sr., aNN ;04 cYSJ (IN dY W ,X l Q a. It, � 6: 'Ili &- �IroT�ok 0 m IM Ch. la �to cc 00 O 9 N -- C oc �O ONi lr Q k. �o 00 ki) {mo f if3 m J a o 0 0 o a $ o 0 00" oo Qo 0 v' N