6. Appendix D - 2022 HCS AnalysisAppendix D
2022 HCS Analysis
HCS+: Unsignalized Intersections Release 5.6
TWO-WAY STOP CONTROL SUMMARY
Analyst: TMW
Agency/Co.: COK
Date Performed: 2/13/2012
Analysis Time Period: 7:45 TO 8:45 AM
Intersection: MERAPPFA
Jurisdiction: FLATHEAD CO
Units: U. S. Customary
Analysis Year: 2022
Project ID:' IZ- 002 �'��
East/West Street: APPLEWAY
North/South Street: MERIDIAN
Intersection Orientation: NS Study period (hrs): 0.25
________Vehicle Volumes and Adjustments
--------------- ---- ------------
Major Street: Approach Northbound Southbound
Movement 1 2 3 4 5 6
L T R I L T R
Volume
75
464 0
0
399 16
Peak -Hour Factor, PHF
0.92
0.92 0.92
0.92
0.92 0.92
Hourly Flow Rate, HFR
81
504 0
0
433 17
Percent Heavy Vehicles
1
-- --
1
-- --
Median Type/Storage
Undivided
/
RT Channelized?
Lanes
0
1 0
0
1 0
Configuration
LTR
LTR
Upstream Signal?
No
No
Minor Street: Approach Westbound Eastbound
Movement 7 8 9 10 11 12
L T R L T R
Volume
23
0
161
Peak Hour Factor, PHF
0.92
0.92
0.92
Hourly Flow Rate, HFR
24
0
174
Percent Heavy Vehicles
0
0
0
Percent Grade (%) 0
1
Flared Approach: Exists?/Storage
/
No /
Lanes
0
1
0
Configuration
LTR
Approach
Movement
Lane Config
Delay, Queue Length, and Level of Service_________
NB SB Westbound Eastbound
1 4 7 8 9 10 11
LTR LTR LTR
12
v (vph)
81
0
198
C(m) (vph)
1116
1066
493
v/c
0.07
0.00
0.40
95% queue length
0.23
0.00
1.91
Control Delay
8.5
8.4
17.1
LOS
A
A
C
Approach Delay
17.1
Approach LOS
C
HCS+: Unsignaliz.ed Intersections Release 5.6
Phone: Fax:
E-Mail:
TWO-WAY STOP CONTROL(TWSC) ANALYSIS
Analyst:
TMW
Agency/Co.:
COK
Date Performed:
2/13/2012
Analysis Time Period:
7:45 TO 6:45 AM
Intersection:
MERAPPFA
Jurisdiction:
FLATHEAD CO
Units: U. S. Customary
Analysis Year:
2022
Project ID:
East/West Street:
APPLEWAY
North/South Street:
MERIDIAN
Intersection Orientation:
NS
Study period (hrs): 0.25
Vehicle Volumes and Adjustments
Major Street Movements
1
2
3
4
5
6
L
T
R
L
T
R
--- --------------------------------------------------------------
Volume
75
464
0
0
399
---------------
16
Peak -Hour Factor, PHF
0.92
0.92
0.92
0.92
0.92
0.92
Peak-15 Minute Volume
20
126
0
0
108
4
Hourly Flow Rate, HFR
81
504
0
0
433
17
Percent Heavy Vehicles
1
--
--
1
--
--
Median Type/Storage
Undivided
/
RT Channelized?
Lanes
0
1
0
0
1
0
Configuration
LTR
LTR
Upstream Signal?
No
No
------------------------------------------------------------------------------
Minor Street Movements
7
8
9
10
11
12
L
T
R
L
T
R
Volume
23
0
161
Peak Hour Factor, PHF
0.92
0.92 .0.92
Peak-15 Minute Volume
6
0
44
Hourly Flow Rate, HFR
24
0
174
Percent Heavy Vehicles
0
0
0
Percent Grade M 0
1
Flared Approach: Exists?/Storage
/
No /
RT Channelized?
Lanes
0
1 0
Configuration
LTR
------------------------------------------------------------
______________________Pedestrian Volumes
and Adjustments --------------------
Movements 13 14
15 16
Flow (ped/hr) 0 0 0 0
Lane Width (ft)
12.0
12.0
12.0
12.0
Walking Speed (ft/sec)
4.0
4.0
4.0
4.0
Percent Blockage
0
0
0
0
Prog.
Flow
vph
S2 Left -Turn
Through
S5 Left -Turn
Through
---Upstream Signal Data_____________
Sat Arrival Green Cycle Prog.
Flow Type Time Length Speed
vph sec sec mph
Distance
to Signal
feet
Worksheet 3-Data for Computing Effect of Delay to Major Street Vehicles
-------------------------------------------------------------------------------
Movement 2
Movement 5
Shared 1n
volume, major
th vehicles:
504
433
Shared In
volume, major
rt vehicles:
0
17
Sat flow
rate, major th
vehicles:
1700
1700
Sat flow
rate, major rt
vehicles:
1700
1700
Number of
major street
through lanes:
1
1
Worksheet 4-Critical Gap and Follow-up Time Calculation
Critical Gap Calculation
Movement
1
4
7
8
9
10
11
12
L
L
L
T
R
L
T
R
._------------------
t(c,base)
----------
4.1
4.1
--------------------------------
7.1
------------------
6.5
6.2
t(c,hv)
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
P (hv)
1
1
0
0
0
t(c,g)
0.20
0.20
0.10
0.20
0.20
0.10
Percent Grade
0.00
0.00
0.00
1.00
1.00
1.00
t(3,it)
0.00
0.00
0.70
0.00
0.00
t(c,T):
1-stage
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
2-stage
0.00
0.00
1.00
1.00
0.00
1.00
1.00
0.00
t(c)
1-stage
4.1
4.1
6.6
6.7
6.3
2-stage
-------------
-------- ---------_--__----------------------------------------
Follow-Up
Time Calculations
Movement
1
4
7
8
9
10
11
12
L
L
L
T
R
L
T
R
--------------------
-----------.----------------------------------------------
t(f,base)
2.20
2.20
3.50
4.00
3.30
t(f,HV)
0.90
0.90
0.90
0.90
0.90
0.90
0.90
0.90
P (HV)
1
1
0
0
0
t(f)
2.2
2.2
3.5
4.0
3.3
Worksheet 5-Effect of Upstream Signals
Computation 1-Queue Clearance Time at Upstream Signal
Movement 2 Movement 5
V(t) V(l,prot) V(t) V(l,prot)
V prog
Total Saturation Flow Rate, s (vph)
Arrival Type
Effective Green, g (sec)
Cycle Length, C (sec)
Rp (from Exhibit 16-11)
Proportion vehicles arriving on green P
g (ql)
g (q2 )
g (q)
------------------------------------------------------------------------------
Computation 2-Proportion of TWSC Intersection Time blocked
Movement 2 Movement 5
V(t) V(l,prot) V(t) V(l,prot)
alpha
beta
Travel time, t (a) (sec)
Smoothing Factor, F
Proportion of conflicting flow, f
Max platooned flow, V(c,max)
Min platooned flow, V(c,min)
Duration of blocked period, t(p)
Proportion time blocked, p 0.000 0.000
Computation 3-Platoon
------------------------------------------------------------
Event Periods
Result
--- --------
p(2)
0.000
_ _ _-_---
p(5)
0.000
p (dom )
p(subo)
Constrained or unconstrained?
------------------------------------
Proportion
--------------------------------------
---
unblocked
(1)
(2)
(3)
for minor
Single -stage
Two -Stage
Process
movements, p(x)
Process
Stage I
Stage II
---------------------------------
p(1)
-------------------------------
------------
p(4)
p(7)
P(8)
p (9)
P(10)
P(11)
p(12)
-----------------------------------------------------------------------------
Computation 4 and 5
Single -Stage Process
Movement
1 4
7 8 9
10 11 12
---------------------
L L
L T R.
L T R
------------
V c,x
----------------------
450 504
----------------_------
1108 1108 442
s
Px
V c, u, x
C r, x
C plat,x
_
Two -Stage Process
7 8 10
11
Stagel Stage2 Stagel Stage2 Stagel Stage2 Stagel Stage2
V(c,x)
s
1500
1500
P(x)
V (c , U , x )
C (r, x)
---- ---------
------------------------
C(plat,x)
----------- -------------------
----
Worksheet 6-Impedance
-------------------------------------------
and Capacity Equations
-----------------------------------------------------------------------------
Step 1: RT from Minor
St.
9
12
------------------------------------------------------------------------------
Conflicting Flows
442
Potential Capacity
612
Pedestrian Impedance
Factor
1.00
1.00
Movement Capacity
612
Probability of Queue
free St.
1.00
0.72
----------------------------------------------------------------------------
Step 2: LT from Major
St.
4
1
-----------------------------------------------------------------------------
Conflicting Flows
504
450
Potential Capacity
1066
1116
Pedestrian Impedance
Factor
1.00
1.00
Movement Capacity .
1066
1116
Probability of Queue
free St.
1.00
0.93
Maj L-Shared Prob Q free
St.
1.00
0.90
Step 3: TH from Minor St. 8 11
-------------------- ----------------------- -----------------------------------
Conflicting Flows 1108
Potential Capacity 199
Pedestrian Impedance Factor 1.00 1.00
Cap. Adj. factor due to Impeding mvmnt 0.90 0.90
Movement Capacity 178
Probability of Queue free St. 1.00 1.00
Step 4: LT from Minor St. 7 10
Conflicting Flows 1108
Potential Capacity 220
Pedestrian Impedance Factor 1.00 1.00
Maj. L, Min T Impedance factor 0.90
Maj. L, Min T Adj. Imp Factor. 0.92
Cap. Adj. factor due to Impeding mvmnt 0.66 0.93
Movement Capacity 204
Worksheet 7-Computation of the Effect of Two -stage Gap Acceptance
Step 3: TH from Minor St. 8 11
Part 1 - First Stage
Conflicting Flows
Potential Capacity
Pedestrian Impedance Factor
Cap. Adj. factor due to Impeding mvmnt
Movement Capacity
Probability of Queue free St.
Part 2 - Second Stage
Conflicting Flows
Potential Capacity
Pedestrian Impedance Factor
Cap. Adj. factor due to Impeding mvmnt
Movement Capacity
Part 3 - Single Stage
Conflicting Flows 1108
Potential Capacity 199
Pedestrian Impedance Factor 1.00 1.00
Cap. Adj. factor due to Impeding mvmnt 0.90 0.90
Movement Capacity 178
Result for 2 stage process:
a
y
C t 178
Probability of Queue free St. 1.00 1.00
Step 4: LT from Minor St. 7 10
Part 1 - First Stage
Conflicting Flows
Potential Capacity
Pedestrian Impedance Factor
Cap. Adj. factor due to Impeding mvmnt
Movement Capacity
Part 2 - Second Stage
Conflicting Flows
Potential Capacity
Pedestrian Impedance Factor
Cap. Adj. factor due to Impeding mvmnt
Movement Capacity
Part 3 - Single Stage
Conflicting Flows 1108
Potential Capacity 220
Pedestrian Impedance Factor 1.00 1.00
Maj. L, Min T Impedance factor 0.90
Maj. L, Min T Adj. Imp Factor. 0.92
Cap. Adj. factor due to Impeding mvmnt 0.66 0.93
Movement Capacity 204
Results for Two -stage process:
a
y
C t 204
Worksheet 8-Shared Lane Calculations
Movement
7 8 9 10
11
12
L T R L
T
R
------------------
Volume (vph)
---------
24
0
174
Movement Capacity (vph)
204
178
612
Shared Lane Capacity (vph)
493
Worksheet 9-Computation of Effect of Flared Minor Street Approaches
Movement 7 8 9 10 11 12
L T R L T R
-------------------------------------------------------------------------------
C sep 204 178 612
Volume 24 0 174
Delay
Q sep
Q Sep +1
round (Qsep +1)
n max
C sh
SUM C sep
n
C act
493
Worksheet 10-Delay, Queue Length, and Level of Service
-------------------- ---------------- -------------------------------------_—
Movement 1 4 7 8 9 10 11 12
Lane Config LTR LTR LTR
v (vph)
81
0
198
C(m) (vph)
1116
1066
493
v/c
0.07
0.00
0.40
95% queue length
0.23
0.00
1.91
Control Delay
8.5
8.4
17.1
LOS
A
A
C
Approach Delay
17.1
Approach LOS
C
Worksheet 11-Shared Major LT Impedance and Delay
Movement 2 Movement 5
p(oj)
0.93
1.00
v(il), Volume for
stream 2 or 5 -
504
433
v(i2), Volume for
stream 3 or 6
0
17
s(il), Saturation
flow rate for stream 2 or 5
1700
1700
s(i2), Saturation
flow rate for stream 3 or 6
1700
1700
P*(oj)
0.90
1.00
d(M,LT), Delay for
stream 1 or 4
8.5
8.4
N, Number of major
street through lanes
1
1
d(rank,l) Delay for
stream 2 or 5
0.9
0.0
HCS+: Unsignalized Intersections Release 5.6
Phone: Fax:
E-Mail:
ALL -WAY STOP CONTROL(AWSC) ANALYSIS
Analyst: TMW
Agency/Co.: COK
Date Performed: 2/13/2012
Analysis Time Period: 7:30 - 8:30 AM
Intersection: MERCENFA
Jurisdiction: FLATHEAD CO
Units: U. S. Customary
Analysis Year ZO2Z
Project ID: 12--002 FUTURE CONDITIONS
East/West Street: CENTER
North/South Street: MERIDIAN
___Worksheet 2 - Volume Adjustments and Site Characteristics
Eastbound I Westbound I Northbound I Southbound
L T R I L T R I L T R I L T R
I I I I
Volume 17 3 3 129 9 295 19 276 36 1299 286 14
% Thrus Left Lane
Eastbound
Westbound
Northbound
L1 L2
Ll L2
L1 L2
Configuration
LTR
LT R
LTR
PHF
0.75
0.92 0.92
0.92
Flow Rate
17
40 320
347
% Heavy Veh
0
0 1
1
No. Lanes
1
2
1
Opposing -Lanes
2
1
1
Conflicting -lanes
1
1
2
Geometry group
4a
5
2
Duration, T 0.25
hrs.
___________Worksheet 3 - Saturation Headway Adjustment
Worksheet
Eastbound
Westbound
Northbound
Ll L2
L1 L2
L1 L2
Flow Rates:
Total in Lane 17
Left -Turn 9
Right -Turn 4
Prop. Left -Turns 0.5
Prop. Right -Turns 0.2
Prop. Heavy Vehicle0.0
Geometry Group 4a
Adjustments Exhibit 17-33:
hLT-adj 0.2
Southbound
Ll L2
LTR
0.92
649
1
1
1
2
2
Southbound
L1 L2
40
320
347
649
31
0
9
324
0
320
39
15
0.8
0.0
0.0
0.5
0.0
1.0
0.1
0.0
0.0
0.0
0.0
0.0
5
2
2
0.5
0.2
0.2
hRT-adj
-0.6
-0.7
-0.6
-0.6
hHV-adj
1.7
1.7
1.7
1.7
hadj, computed
-0.0
0.4
-0.7
-0.0
0.1
_____Worksheet 4 -
Departure
Headway
and Service Time
Eastbound
Westbound
Northbound
Southbound
Ll L2
L1
L2
Ll L2
Ll
L2
Flow rate
17
40
320
347
649
hd, initial value
3.20 3.20
3.20
3.20
3.20 3.20
3.20
3.20
x, initial
0.02
0.04
0.28
0.31
0.58
hd, final value
8.02
7.69
6.59
6.24
5.93
x, final value
0.04
0.09
0.59
0.60
1.07
Move -up time, m
2.0
2.3
2.0
2.0
Service Time
6.0
5.4
4.3
4.2
3.9
Worksheet 5 -
Capacity
and Level
of Service
Eastbound
Westbound
Northbound
Southbound
L1 L2
L1
L2
L1 L2
Ll
L2
Flow Rate
17
40
320
347
649
Service Time
6.0
5.4
4.3
4.2
3.9
Utilization, x
0.04
0.09
0.59
0.60
1.07
Dep. headway, hd
8.02.
7.69
6.59
6.24
5.93
Capacity
267
290
537
567
649
Delay
11.33
11.11
18.19
18.19
79.78
LOS
B
B
C
C
F
Approach;
Delay
11.33
17.40
18.19
79.78
LOS
B
C
C
F
Intersection Delay
----------------------------------------------------------------=------------
47.01
Intersection LOS E
HCS+: Unsignalized Intersections Release 5.6
Phone: Fax:
E-Mail :
ALL -WAY STOP CONTROL(AWSC) ANALYSIS
Analyst: TMW
Agency/Co.: COK
Date Performed: 2/13/2012
Analysis Time Period: 7:30 - 8:30 AM
Intersection: MER2NDFA
Jurisdiction: FLATHEAD CO
Units: U. S. Customary
Analysis Year: 2022
Project ID: 12-002 FUTURE CONDITIONS
East/West Street: 2ND
North/South Street: MERIDIAN
__Worksheet 2 - Volume Adjustments and Site Characteristics
I Eastbound I Westbound I Northbound I Southbound
L T R I L T R I L T R I L T R
volume 117 11 1 129 1 5.3 13 249 89 185 204 4
% Thrus Left Lane
Eastbound
Westbound
Northbound
L1 L2
L1 L2
L1
L2
Configuration
LTR
LTR
LTR
PHF
0.80
0.82
0.92
Flow Rate
35
100
369
% Heavy Veh
0
0
1
No. Lanes
1
1
1
Opposing -Lanes
1
1
1
Conflicting -lanes
1
1
1
Geometry group
1
1
1
Duration, T 0.25
hrs.
___________Worksheet 3 - Saturation Headway
Adjustment
Worksheet
Eastbound
Westbound
Northbound
Ll L2
Ll L2
L1
L2
Flow Rates:
Total in Lane 35
Left -Turn 21
Right -Turn 1
Prop. Left -Turns 0.6
Prop. Right -Turns 0.0
Prop. Heavy Vehicle0.0
Geometry Group 1
Adjustments Exhibit 17-33:
hLT-adj 0.2
Southbound
L1 L2
LTR
1.00
293
1
1
1
1
1
Southbound
L1 L2
100
369
293
35
3
85
64
96
4
0.3
0.0
0.3
0.6
0.3
0.0
0.0
0.0
0.0
1
1
1
0.2
0.2
0.2
hRT-adj
-0.6
-0.6
-0.6
-0.6
hHV-adj
1.7
1.7
1.7
1.7
hadj, computed
0.1
-0.3
-0.1
0.1
___Worksheet 4 - Departure Headway and Service Time
Eastbound
Westbound
Northbound
Southbound
L1 L2
L1 L2
Ll L2
L1 L2
Flow rate
35
100
369
293
hd, initial value
3.20 3.20
3.20 3.20
3.20 3.20
3.20 3.20
x, initial
0.03
0.09
0.33
0.26
hd, final value
5.73
5.19
4.50
4.77
x, final value
0.06
0.14
0.46
0.39
Move -up time, m
2.0
2.0
2.0
2.0
Service Time
3.7
3.2
2.5
2.8
_Worksheet 5 - Capacity and Level
of Service
Eastbound
Westbound
Northbound
Southbound
L1 L2
L1 L2
Ll L2
L1 L2
Flow Rate
35
100
369
293
Service Time
3.7
3.2
2.5
2.8
Utilization, x
0.06
0.14
0.46
0.39
Dep. headway, hd
5.73
5.19
4.50
4.77
Capacity
285
350
619
543
Delay
9.07
9.06
11.30
10.78
LOS
A
A
B
B
Approach:
Delay
9.07
9.06
11.30
10.78
LOS
A
A
B
B
Intersection Delay
10.73
Intersection
LOS B
HCS+: Unsignalized Intersections Release 5.6
TWO-WAY STOP CONTROL SUMMARY
Analyst: TMW
Agency/Co.: COK
Date Performed: 2/13/2012
Analysis Time Period: 7:45 TO 8:45 AM
Intersection: MERAPPFA-1
Jurisdiction: FLATHEAD CO
Units: U. S. Customary
Analysis Year: 2022
Project ID: 12-002 FUTURE CONDITIONS W/ NORTHBOUND LTL
East/West Street: APPLEWAY
North/South Street: MERIDIAN
Intersection Orientation: NS Study period (hrs): 0.25
------------------
__Vehicle Volumes and Adjustments
-- ------------
Major Street: Street: Approach Northbound Southbound
Movement 1 2 3 1 4 5 6
L T R I L T R
Volume
75
464
0
0
399
16
Peak -Hour Factor, PH F
0.92
0.92
0.92
0.92
0.92
1.00
Hourly Flow Rate, HFR
81
504
0
0
433
16
Percent Heavy Vehicles
1
--
--
1
--
--
Median Type/Storage
TWLTL `ilk
/ 2
SIC
RT Channelized?
Lanes
1
1 0
0
1 0
Configuration
L
TR
LTR
Upstream Signal?
No
No
-------------------------------------------------------------------------------
Minor Street: Approach
Westbound
Eastbound
Movement
7
8
9 I
10
11
12
L
T
R I
L
T
R
------------------------------
Volume
------------------------------------------
23
0
161
Peak Hour Factor, PHF
0.92
0.92
0.92
Hourly Flow Rate, HFR
24
0
174
Percent Heavy Vehicles
0
0
0
Percent Grade (%)
0
1
Flared Approach: Exists?/Storage
/
No /
Lanes
0
1 0
Configuration
-------------------------------
------------------------------------------
LTR
Approach
Movement
Lane Config
v (vph)
C (m) (vph)
v/c
95% queue length
Control Delay
LOS
Approach Delay
Approach LOS
Delay, Queue Length, and Level of Service_________ --_
NB SB Westbound Eastbound-
1 4 I 7 8 9 10 11 12
L LTR I LTR
------------------------------------ -----------------
81 0 198
1117 1066 574
0.07 0.00 0.34
0.23 0.00 1.53
8.5 8.4 14.5
A A B
14.5
B
HCS+: Unsignalized Intersections Release 5.6
Phone: Fax:
E-Mail:
TWO-WAY STOP CONTROL(TWSC) ANALYSIS
Analyst:
TMW
Agency/Co.:
COK
Date Performed:
2/13/2012
Analysis Time Period:
7:45 TO 8:45
AM
Intersection:
MERAPPFA-1
Jurisdiction:
FLATHEAD CO
Units: U. S. Customary
Analysis Year:
2022
Project ID: 12-002 FUTURE
CONDITIONS
W/
NORTHBOUND LTL
East/West Street:
APPLEWAY
North/South Street:
MERIDIAN
Intersection Orientation:
NS
Study period (hrs): 0.25
----------- -------------
Vehicle Volumes
and
Adjustments --------------
Major Street Movements
1
2
3
4 5
6
L
T
R
L T
R
-------------------------------------------------------
Volume
75
464
0
0 399
----------
16
Peak -Hour Factor, PHF
0.92
0.92
0.92 0.92 0.92
1.00
Peak-15 Minute Volume
20
126
0
0 108
4
Hourly Flow Rate, HFR
81
504
0
0 433
16
Percent Heavy Vehicles
1
--
--
1 --
--
Median Type/Storage
TWLTL
/ 2
RT Channelized?
Lanes
1
1 0
0 1
0
Configuration
L
TR
LTR
Upstream Signal? No No
Minor Street Movements 7 8
L T
9 10
R L
11
T
12
R
------------------------------------------------------------------------------
Volume
23
0
161
Peak Hour Factor, PHF
0.92
0.92
0.92
Peak-15 Minute Volume
6
0
44
Hourly Flow Rate, HFR
24
0
174
Percent Heavy Vehicles
0
0
0
Percent Grade (o) 0
1
Flared Approach: Exists?/Storage
/
No /
RT Channelized?
Lanes
0
1
0
Configuration
LTR
Movements
Pedestrian Volumes and Adjustments
13 14 15 16
Flow (ped/hr) 0 0 0 0
Lane Width (ft)
Walking Speed (ft/sec)
Percent Blockage
Prog
Flow
vph
S2 Left -Turn
Through
S5 Left -Turn
Through
12.0 12.0 12.0 12.0
4.0 4.0 4.0 4.0
0 0 0 0
------------------------
---- upstream Signal Data__________
Sat Arrival Green Cycle Prog.
Flow Type Time Length Speed
vph sec sec mph
Distance
to Signal
feet
Worksheet 3-Data for Computing Effect of Delay to Major Street Vehicles
Movement 2 Movement 5
------------------------------------------------------------------------------
Shared In volume, major th vehicles: 433
Shared In volume, major rt vehicles: 16
Sat flow rate, major th vehicles: 1700
Sat flow rate, major rt vehicles: 1700
Number of major street through lanes: 1
------------------------------- ---------------------------------------- -------
Worksheet 4-Critical Gap and Follow-up Time Calculation
-------------------------------------------------------------------------------
Critical Gap Calculation
Movement 1 4 7 8 9 10 11 12
L L L T R L T R
----- --------- ------------------- -----------------------.--_-------------------
t(c,base) 4.1 4.1 7.1 6.5 6.2
t(c,hv) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
P (hv) 1 1 0 0 0
t(c,g) 0.20 0.20 0.10 0.20 0.20 0.10
Percent Grade 0.00 0.00 0.00 1.00 1.00 1.00
t(3,1t) 0.00 0.00 0.70 0.00 0.00
t(c,T): 1-stage 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
2-stage 0.00 0.00 1.00 1.00 0.00 1.00 1.00 0.00
t(c) 1-stage 4.1 4.1 6.6 6.7 6.3
2-stage 4.1 4.1 5.6 5.7 6.3
- -----------------------------------------------------------------------
Follow-Up Time Calculations
Movement 1 4 7 8 9 10 11 12
L L L T R L T R
------_------------------- ------------ ------------------------------------ ----
t(f,base) 2.20 2.20 3.50 4.00 ' 3.30
t(f,HV) 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90
P (HV) 1 1 0 0 0
t(f) 2.2 2.2 3.5 4.0 3.3
---- -------------------------------------- ----------------------------- -------
Worksheet 5-Effect of Upstream Signals
---- --------- ------------------ ---------------------- -------------------------
Computation 1-Queue Clearance Time at Upstream Signal
Movement 2 Movement 5
V(t) V(l,prot) V(t) V(l,prot)
V prog
Total Saturation Flow Rate, s (vph)
Arrival Type
Effective Green, g (sec)
Cycle Length, C (sec)
Rp (from Exhibit 16-11)
Proportion vehicles arriving on green P
g(ql)
g(q2)
g(q)
----------------------------------------------------------------------------
Computation 2-Proportion of TWSC Intersection Time blocked
Movement 2 Movement 5
V(t) V(l,prot) V(t) V(l,prot)
alpha
beta
Travel time, t(a) (sec)
Smoothing Factor, F
Proportion of conflicting flow, f
Max platooned flow, V(c,max)
Min platooned flow, V(c,min)
Duration of blocked period, t(p)
Proportion time blocked, p
0.000
0.000
-------------------------------------
Computation 3-Platoon Event Periods
-----------------------------
Result
---------_.--
-------------------------------------------------------------------------------
p(2)
0.000
p(5)
0.000
p(dom)
p(subo)
Constrained or unconstrained?
------------------------------------------------------------------------------
Proportion
unblocked (1)
(2)
(3)
for minor Single -stage
Two -Stage
Process
movements, p(x) Process
Stage I
Stage II
------------------------------------------------------------------------------
p(1)
p(4)
p(7)
P(8)
P(9)
P(10)
P(11)
p(12)
— ---------------------------------------------------------
Computation 4 and 5
Single -Stage Process
Movement 1 4
7 8 9
10 11 12
L L
------------------------------------------------------------------------------
L T R
L T R
V c,x 449 504
1107 1107 441
s
Px
v c, u, x
—_-----------------------------------
C r, x
-- --------------------------------------
C plat, x
-------------------------------- --------
Two-Stage Process
-----------------------
-----------
7
8 10
11
Stagel Stage2 Stagel Stage2 Stagel Stage2 Stagel Stage2
V(c,x) 441 666 441 666
s 1500 1500
P (x)
V (C, u, x )
C(r,x)
C(plat,x)
Worksheet 6-Impedance and Capacity Equations
Step 1: RT from Minor St.
----------------------------
9
12
--------------------------------------------------
Conflicting Flows
441
Potential Capacity
613
Pedestrian Impedance Factor
1.00
1.00
Movement Capacity
613
Probability of Queue free St.
-------------------------------------------------------------------------------
1.00
0.72
Step 2: LT from Major St.
4
1
--------------------------
Conflicting Flows
504
------------------
449
Potential Capacity
1066
1117
Pedestrian Impedance Factor
1.00
1.00
Movement Capacity
1066
1117
Probability of Queue free St.
1.00
0.93
Maj L-Shared Prob Q free St.
-------------------------------------
1.00
-----------------------------------------
Step 3: TH from Minor St.
--------------------------------------
8
11
___--_-------------
Conflicting Flows
---------------------
1107
Potential Capacity
199
Pedestrian Impedance Factor
1.00
1.00
Cap. Adj. factor due to Impeding mvmnt
0.93
0.93
Movement Capacity
185
Probability of Queue free St.
------------- -----------------------------------------------------------------
1.00
1.00
Step 4: LT from Minor St.
_-------------------
7
10
------------------- ----------
Conflicting Flows
--------------------
---------
1107
Potential Capacity
221
Pedestrian Impedance Factor
1.00
1.00
Maj. L, Min T Impedance factor
0.93
Maj. L, Min T Adj. Imp Factor.
0.94
Cap. Adj. factor due to Impeding mvmnt
0.68
0.93
Movement Capacity
205
----------- -------------------------------------
Worksheet 7-Computation of the Effect of
------------------------------------------------------------------------------
-----------
Two -stage Gap
-------------------
Acceptance
Step 3: TH from Minor St.
------------------------------------------------------------------------------
8
11
Part 1 - First Stage
Conflicting Flows
441
Potential Capacity
460
566
Pedestrian Impedance Factor
1.00
1.00
Cap. Adj. factor due to Impeding mvmnt
0.93
1.00
Movement Capacity
427
566
Probability of Queue free St.
1.00
1.00
Part 2 - Second Stage
Conflicting Flows
666
Potential Capacity
576
444
Pedestrian Impedance
Factor
1.00
1.00
Cap. Adj. factor due
to Impeding
mvmnt
1.00
0.93
Movement Capacity
576
412
--- --------------------------------------------------------------------------
Part 3 - Single Stage
Conflicting Flows
1107
Potential Capacity
199
Pedestrian Impedance
Factor
1.00
1.00
Cap. Adj. factor due
to Impeding
mvmnt
0.93
0.93
Movement Capacity
185
-----------------------------------------------------------------------------
Result for 2 stage process:
a
0.95
0.95
Y
C t
185
Probability of Queue
free St.
1.00
1.00
--------- ----------------------------------------------------
Step 4: LT from Minor
St.
7
10
--------------------------
Part 1 - First Stage
----------------------------------------------
Conflicting Flows
441
Potential Capacity
515
637
Pedestrian Impedance
Factor
1.00
1.00
Cap. Adj. factor due
to Impeding
mvmnt
0.93
1.00
Movement Capacity
478
637
---- --------- ------------------------------_..------------------------------------
Part 2 - Second Stage
Conflicting Flows
666
Potential Capacity
596
496
Pedestrian Impedance
Factor
1.00
1.00
Cap. Adj. factor due
to Impeding
mvmnt
0.72
0.93
Movement Capacity
427
460
Part 3 - Single Stage
Conflicting Flows
1107
Potential Capacity
221
Pedestrian Impedance Factor
1.00
1.00
Maj. L, Min T Impedance factor
0.93
Maj. L, Min T Adj. Imp Factor.
0.94
Cap. Adj. factor due to Impeding mvmnt
0.68
0.93
Movement Capacity
205
-----------------------------------------------------------------------------
Results for Two -stage process:
a
0.95
0.95
y
1.69
C t
393
Worksheet 8-Shared Lane Calculations
Movement
7 8 9 10 11 12
L T R L T R
Volume (vph) 24 0 174
Movement Capacity (vph) 393 185 613
Shared Lane Capacity (vph) 574
Worksheet 9-Computation of Effect of Flared Minor Street Approaches
Movement 7
8
9
10
11
12
L
T
R
L
T
R
C sep 393 185 613
Volume 24 0 174
Delay
Q sep
Q sep +1
round (Qsep +1)
------------------------------- ----------- ------------------------------------
n max
C sh 574
SUM C Sep
n
C act
-----------------
=-----
------------------------------------------------------
Worksheet 10-Delay, Queue Length, and Level of Service
Movement
Lane Config
1
L
4 7
LTR
8 9 10 11 12
LTR
----------------------
v (vph)
------------------------------------
81
0
198
C(m) (vph)
1117
1066
574
v/c
0.07
0.00
0.34
95% queue length
0.23
0.00
1.53 Ae-
Control Delay
8.5
8.4
14.5
LOS
A
A
B
Approach Delay
14.5
Approach LOS
B
Worksheet 11-Shared Major LT Impedance and Delay
Movement 2
Movement 5
-------------------------------------------------------------....----------------
p(oj)
0.93
1.00
v(il), Volume for
stream 2
or 5
433
v(i2), Volume for
stream 3
or 6
16
s(il), Saturation
flow rate
for stream 2 or 5
1700
s(i2), Saturation
flow rate
for stream 3 or 6
1700
P*(oj)
1.00
d(M,LT), Delay for
stream 1
or 4 8.5
8.4
N, Number of major
street through
lanes
1
d(rank,l) Delay for
stream
2 or 5
0.0
HCS+: Unsignalized Intersections Release 5.6
Phone: Fax:
E--Mail;
ALL -WAY STOP CONTROL(AWSC) ANALYSIS
Analyst: TMW
Agency/Co.: COK
Date Performed: 2/13/2012
Analysis Time Period: 7:30 - 8:30 AM
Intersection: MERCENFA-1
Jurisdiction: FLATHEAD CO
Units: U. S. Customary
Analysis Year:
Project ID: 12-002 FUTURE CONDITIONS W/ SOUTHBOUND LTL
East/West Street: CENTER
North/South Street: MERIDIAN
__Worksheet 2 - Volume Adjustments and Site Characteristics_____
I Eastbound I Westbound I Northbound I Southbound
I L T R I L T R I L T R I L T R
Volume 17 3 3 129 9 295 19 276 36 1299 286 14
Thrus Left Lane
Eastbound
Westbound
Northbound
L1 L2
L1 L2
L1 L2
Configuration
LTR
LT R
LTR
PHF
0.75
0.92 0.92
0.92
Flow Rate
17
40 320
347
% Heavy Veh
0
0 1
1
No. Lanes
1
2
1
Opposing -Lanes
2
1
2
Conflicting -lanes
2
2
2
Geometry group
4b
5
4b
Duration, T 0.25
hrs.
----_______Worksheet 3 - Saturation Headway Adjustment
Worksheet
Eastbound
Westbound
Northbound
L1 L2
L1 L2
L1 L2
Flow Rates:
Total in Lane 17
Left -Turn 9
Right -Turn 4
Prop. Left -Turns 0.5
Prop. Right -Turns 0.2
Prop. Heavy Vehicle0.0
Geometry Group 4b
Adjustments Exhibit 17-33:
hLT-adj 0.2
Southbound
Ll L2
L TR
0.92 0.92
324 325
1 0
2
1
2
5
Southbound
L1 L2
40
320
347
324
325
31
0
9
324
0
0
320
39
0
15
0.8
0.0
0.0
1.0
0.0
0.0
1.0
0.1
0.0
0.0
0.0
0.0
0.0
0.0
0.0
5
4b
5
0.5
0.2
0.5
hRT-adj
-0.6
-0.7
-0.6
hHV-adj
1.7
1.7
1.7
hadj, computed
-0.0
0..4
-0.7
-0.0
Worksheet 4 - Departure
Headway and
Service Time
Eastbound
Westbound
Northbound
L1 L2
Ll
L2
Ll L2
Flow rate
17
40
320
347
hd, initial value
3.20 3.20
3.20
3.20
3.20 3.20
x, initial
0.02
0.04
0.28
0.31
hd, final value
8.13
7.57
6.49
6.60
x, final value
0.04
0.08
0.58
0.64
Move --up time, m
2.3
2.3
2.3
Service Time
5.8
5.3
4.2
4.3
_______________Worksheet 5 - Capacity
and Level
of Service
Eastbound
Westbound
Northbound
L1 L2
L1
L2
L1 L2
Flow Rate
17
40
320
347
Service Time
5.8
5.3
4.2
4.3
Utilization, x
0.04
0.08
0.58
0.64
Dep. headway, hd
8.13
7.57
6.49
6.60
Capacity
267
290
533
534
Delay
11.15
10.97
17.64
20.12
LOS
B
B
C
C
Approach:
Delay
11.15
16.90
20.12
LOS
B
C
C
Intersection Delay
18.54
Intersection
LOS C
-0.7
1.7
0.5 -0.0
Southbound
L1 L2
324 325
3.20 3.20
0.29 0.29
6.91 6.36
0.62 0.57
2.3
4.6 4.1
Southbound
L1 L2
324 325
4.6 4.1
0.62 0.57
6.91 6.36
513 557
20.33 17.27
C C
18.80
C
HCS+: Unsignalized Intersections Release 5.6
TWO-WAY STOP CONTROL SUMMARY
Analyst:
Agency/Co.: COK
Date Performed: 2/13/2012
Analysis Time Period: 4:30 TO 5:30 PM
Intersection: MERAPPFP
Jurisdiction: FLATHEAD CO
Units: U. S. Customary
Analysis Year: 2022
Project ID:
East/West Street: APPLEWAY
North/South Street: MERIDIAN
Intersection Orientation: NS Study period (hrs): 0.25
_____Vehicle Volumes and Adjustments
Major Street: Approach Northbound Southbound
Movement 1 2 3 1 4 5 6
L T R I L T R
Volume
126
583 0
0
581 68
Peak -Hour Factor, PHF
0.92
0.92 0.92
0.92
0.92 0.92
Hourly Flow Rate, HFR
136
633 0
0
631 73
Percent Heavy Vehicles
1
-- --
1
-- --
Median Type/Storage
Undivided
/
RT Channelized?
Lanes
1
1 0
0
1 0
Configuration
L
TR
LTR
Upstream Signal?
No
No
Minor Street: Approach
Movement 7
L
Westbound
8 9
T R
Eastbound
1 10 11
I L T
12
R
--------._......_.__-.....____.____._.------_._.--------------------------------------------_-.—
Volume
36
0
98
Peak Hour Factor, PHF
0.92
0.92
0.92
Hourly Flow Rate, HFR
39
0
106
Percent Heavy Vehicles
0
0
0
Percent Grade (%)
0
1
Flared Approach: Exists?/Storage
/
No /
Lanes
0
1
0
Configuration
------------------------------------------------------------------------------
LTR
Approach
Movement
Lane Config
Delay, Queue Length, and Level of Service_________
NB SB Westbound Eastbound
1 4 I 7 8 9 1 10 11
L LTR I 1, LTR
v (vph)
136
0
145
C(m) (vph)
898
955
225
v/c
0.15
0.00
0.64
95% queue length
0.53
0.00
3.91
Control Delay
9.7
8.8
46.1
LOS
A
A
E
Approach Delay
46.1
Approach LOS
E
12
HCS+: Unsignalized Intersections Release 5.6
Phone: Fax:
E-Mail:
TWO-WAY STOP CONTROL(TWSC) ANALYSIS
Analyst:
Agency/Co.: COK
Date Performed: 2/13/2012
Analysis Time Period: 4:30 TO 5:30 PM
Intersection: MERAPPFP
Jurisdiction: FLATHEAD CO
Units: U. S. Customary
Analysis Year: 2022
Project ID:
East/West Street: APPLEWAY
North/South Street: MERIDIAN
Intersection Orientation: NS Study period (hrs): 0.25
--- ------------------ _Vehicle Volumes and Adjustments
--------- --
Major Street Movements 1 2 3 4 5 6
L T R L T R
Volume
126
583
0
0
581
68
Peak -Hour Factor, PHF
0.92
0.92
0.92
0.92
0.92
0.92
Peak-15 Minute Volume
34
158
0
0
158
18
Hourly Flow Rate, HFR
136
633
0
0
631
73
Percent Heavy Vehicles
1
--
--
1
--
--
Median Type/Storage
Undivided
/
RT Channelized?
Lanes
1
1 0
0
1 0
Configuration
L
TR
LTR
Upstream Signal?
No
No
-----------------------------------------------------------------------------
Minor Street Movements
7
8
9
10
11
12
L
T
R
L
T
R
--- --------------------------------------------------------------------------
Volume
36
0
98
Peak Hour Factor, PHF
0.92
0.92
0.92
Peak-15 Minute Volume
10
0
27
Hourly Flow Rate, HFR
39
0
106
Percent Heavy Vehicles
0
0
0
Percent Grade (o)
0
1
Flared Approach: Exists?/Storage
/
No /
RT Channelized?
Lanes
0
1 0
Configuration
LTR
--Pedestrian Volumes and Adjustments
-------------------- ----------------------
Movements 13 14 15 16
Flow (ped/hr)
0 0 0 0
Lane Width (ft)
Walking Speed (ft/sec)
Percent Blockage
Prog.
Flow
vph
S2 Left -Turn
Through
S5 Left -Turn
Through
12.0 12.0 12.0 12.0
4.0 4.0 4.0 4.0
0 0 0 0
---Upstream Signal Data_______
Sat Arrival Green Cycle -Prog.
Flow Type Time Length Speed
vph sec sec mph
Distance
to Signal
feet
------------------------------------------------------------------------
Worksheet 3-Data for Computing Effect of Delay to Major Street Vehicles
Movement 2 Movement 5
Shared In
volume, major
th vehicles:
631
Shared In
volume, major
rt vehicles:
73
Sat flow
rate, major th
vehicles:
1700
Sat flow
rate, major rt
vehicles:
1700
Number of
major street
through lanes:
1
Worksheet 4-Critical Gap and Follow-up Time Calculation
----------------------------- ----------- -------------------------
Critical Gap Calculation
Movement 1 4 7 8 9 10 11 12
L L L T R L T R
t(c,base)
4.1
4.1
7.1
6.5
6.2
t(c,hv)
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
P(hv)
1
1
0
0
0
t(c,g)
0.20
0.20
0.10
0.20
0.20
0.10
Percent Grade
0.00
0.00
0.00
1.00
1.00
1.00
t(3,lt)
0.00
0.00
0.70
0.00
0.00
t(c,T):
1-stage
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
2-stage
0.00
0.00
1.00
1.00
0.00
1.00
1.00
0.00
t(c)
1-stage
4.1
4.1
6.6
6.7
6.3
2-stage
----- ---------------------------
Follow-Up
Time Calculations
----------------------------------------------
Movement
1
4
7
8
9
10
11
12
L
L
L
T
R
L
T
R
-------------------
t(f,base)
----------------------------------------------.-------------
2.20
2.20
3.50
4.00
3.30
t(f,HV)
0.90
0.90
0.90
0.90
0.90
0.90
0.90
0.90
P(HV)
1
1
0
0
0
t(f)
2.2
2.2
3.5
4.0
3.3
Worksheet 5-Effect of Upstream Signals
-------------------------------------------------------------------------------
Computation 1-Queue.Clearance Time at Upstream Signal
Movement 2 Movement 5
V(t) V(l,prot) V(t) V(l,prot)
V prog
Total Saturation Flow Rate, s (vph)
Arrival Type
Effective Green, g (sec)
Cycle Length, C (sec)
Rp (from Exhibit 16-11)
Proportion vehicles arriving on green P
g(q1)
g(q2)
g (q)
-------------------------------------------------------------------------------
Computation 2-Proportion of TWSC Intersection Time blocked
_-_
Movement 2 Movement
5
VW V(l,prot) V(t)
V(l,prot)
------------------------------------------------------------
alpha
----------
beta
Travel time, t(a) (sec)
Smoothing Factor, F
Proportion of conflicting flow, f
Max platooned flow, V(c,max)
Min platooned flow, V(c,min)
Duration of blocked period, t(p)
Proportion time blocked, p
0.000
0.000
----------------------------------_ --.--------------------------.-----------------
Computation 3-Platoon Event Periods
Result
-----------------------------------------------------------------
p(2)
0.000
p(5)
0.000
p (dom)
p(subo)
Constrained or unconstrained?
------------- ------------------- ---------------------
Proportion
-----------
---------- ----
unblocked (1)
(2) (3)
for minor Single -stage
Two -Stage Process
movements, p(x) Process
Stage I Stage II
---- ----------------------------------------------
p(1)
---------- ------------------
p(4)
p(7)
P(8)
P(9)
P (10)
P(11)
P(12)
----------------------------------------------------------------------------
Computation 4 and 5
Single -Stage Process
Movement 1 4
7 8 9 10
11 12
L L
L T R L
T R
---------------------- ----------------------------------------------------
V c,x 704 633
1573
1573 668
s
Px
V c, u, x
----------------------------------------------------------------------------
C r, x
C plat, x
--------------- -----
Two-Stage Process
--- ----- ---- —_..------------------
7
8 10
11
Stagel Stage2 Stagel Stage2 Stagel Stage2 Stagel Stage2
V(c,x)
s 1500 1500
P(x)
V (c, u, x )
-----------------------------------------------------------------------------
C(r,x)
C(plat,x)
Worksheet 6-Impedance and Capacity Equations
------------------------------------------------------------------------------
Step 1: RT from Minor St.
-----------------------------------------------------------------------------
9
12
Conflicting Flows
668
Potential Capacity
453
Pedestrian Impedance Factor
1.00
1.00
Movement Capacity
453
Probability of Queue free St.
-----------------------------------------------------------------------------
1.00
0.77
Step 2: LT from Major St.
-------------------------------------------------------------------------------
4
1
Conflicting Flows
633
704
Potential Capacity
955
898
Pedestrian Impedance Factor
1.00
1.00
Movement Capacity
955
898
Probability of Queue free St.
1.00
0.85
Maj L-Shared Prob Q free St.
1.00
------------- ------------------------------------
Step 3: TH from Minor St.
----------------------_-----
8
11
------------------- --------------------------------------------------------
Conflicting Flows
---
1573
Potential Capacity
102
Pedestrian Impedance Factor
1.00
1.00
Cap. Adj. factor due to Impeding mvmnt
0.85
0.85
Movement Capacity
87
Probability of.Queue free St.
---- _----------
1.00
1.00
------------------------------------------
Step 4: LT from Minor St.
-----------------------------------------------------------------------------
---------------------
7
10
Conflicting Flows
1573
Potential Capacity
112
Pedestrian Impedance Factor
1.00
1.00
Maj. L, Min T Impedance factor
0.85
Maj. L, Min T Adj. Imp Factor.
0.88
Cap. Adj. factor due to Impeding mvmnt
0.68
0.85
Movement Capacity
95
Worksheet 7-Computation of the Effect of Two -stage Gap Acceptance
Step 3: TH from Minor St. 8 11
Part 1 - First Stage
Conflicting Flows
Potential Capacity
Pedestrian Impedance Factor
Cap. Adj. factor due to Impeding mvmnt
Movement Capacity
Probability of Queue free St.
Part 2 - Second Stage
Conflicting Flows
Potential Capacity
Pedestrian Impedance Factor
Cap. Adj. factor due to Impeding mvmnt
Movement Capacity
Part 3 - Single Stage
Conflicting Flows 1573
Potential Capacity 102
Pedestrian Impedance Factor 1.00 1.00
Cap. Adj. factor due to Impeding mvmnt 0.85 0.85
Movement Capacity 87
Result for 2 stage process:
a
y
C t 87
Probability of Queue free St. 1.00 1.00
Step 4: LT from Minor St. 7 10
Part 1 - First Stage
Conflicting Flows
Potential Capacity
Pedestrian Impedance Factor
Cap. Adj. factor due to Impeding mvmnt
Movement Capacity
Part 2 - Second Stage
Conflicting Flows
Potential Capacity
Pedestrian Impedance Factor
Cap. Adj. factor due to Impeding mvmnt
Movement Capacity
Part 3 - Single Stage
Conflicting Flows
1573
Potential Capacity
112
Pedestrian Impedance Factor
1.00
1.00
Maj. L, Min T Impedance factor
0.85
Maj. L, Min T Adj. Imp Factor.
0.88
Cap. Adj. factor due to Impeding mvmnt
0.68
0.85
Movement Capacity
95
Results for Two -stage process:
a
y
C t 95
Worksheet 8-Shared Lane Calculations
Movement 7 8 9 10 11 12
L T R L T R
Volume (vph) 39 0 106
Movement Capacity (vph) 95 87 453
Shared Lane Capacity (vph) 225
Worksheet 9-Computation of Effect of Flared Minor Street Approaches
Movement
7
8 9 10
11
12
--------------------------------------------------------------------
L
T R L
T
R
C Sep
95
87
----
453
Volume
39
0
106
Delay
Q sep
Q sep +1
round (Qsep +1)
---------------------------------------------
n max
-----------------------
C sh
225
SUM C sep
n
C act
_-------- -----------------------
Worksheet 10-Delay, Queue
----------- ---------------------
------------------------
Length, and Level
---------------------
of Service
Movement
1
_-__---------
4 7 8
--------------------------------
9 10
11 12
Lane Config
------------------------------------
L
LTR
LTR
v (vph)
136
-----------------------------_-....----___-----
0
145
C(m) (vph)
898
955
225
v/c
0.15
0.00
0.64
95% queue length
0.53
0.00
3.91
Control Delay
9.7
8.8
46.1
LOS
A
A
E
Approach Delay
46.1
Approach LOS
---------- --------------------------
E
Worksheet 11-Shared Major
-------------------------------------------------------------------------------
-----------------------
LT Impedance and
----------------
Delay
---
-- ------------------------------------------------------------------------
Movement 2
Movement
5
P(oi)
0.85
1.00
v(il), Volume for
stream 2
or 5
631
v(i2), Volume for
stream 3
or 6
73
s(il), Saturation
flow rate
for stream 2 or
5
1700
s(i2), Saturation
flow rate
for stream 3 or
6
1700
P*(oj)
1.00
d(M,LT), Delay for
stream
1 or 4
9.7
8.8
N, Number of major
street
through lanes
1
d(rank,l) Delay for
stream
2 or 5
0.0
HCS+: Unsignalized Intersections Release 5.6
Phone: Fax:
E-Mail.
ALL -WAY STOP CONTROL(AWSC) ANALYSIS
Analyst: TMW
Agency/Co.: COK
Date Performed: 2/13/2012
Analysis Time Period: 4:30 TO 5:30 PM
Intersection: MERCENFP
Jurisdiction: FLATHEAD CO
Units: U. S. Customary
Analysis Year: 2022
Project ID: 12-002 FUTURE CONDITIONS
East/West Street: CENTER
North/South Street: MERIDIAN
__Worksheet 2 - Volume Adjustments and Site Characteristics
Eastbound I
Westbound I
Northbound
I Southbound
L
T R I L
T R I L
T
R
I L T R
I
Volume 114 7
I
I
7 341 10
I
4 143
299
36
1296 375 13
% Thrus Left Lane
Eastbound
Westbound
Northbound
Southbound
L1 L2
L1 L2
Ll
L2
L1 L2
Configuration
LTR
LT R
LTR
LTR
PHF
0.60
0.92 0.92
0.92
0.92
Flow Rate
29
53 370
363
742
% Heavy Veh
0
0 1
1
1
No. Lanes
1
2
1
1
Opposing -Lanes
2
1
1
1
Conflicting --lanes
1
1
2
2
Geometry group
4a
5
2
2
Duration, T 0.25
hrs.
Worksheet 3 - Saturation Headway Adjustment Worksheet
Eastbound
L1 L2
Flow Rates:
Total in Lane 29
Left -Turn 17
Right --Turn 4
Prop. Left -Turns 0.6
Prop. Right -Turns 0.1
Prop. Heavy Vehicle0.0
Geometry Group 4a
Adjustments Exhibit 17--33:
hLT-adj 0.2
Westbound
Northbound
Southbound
L1 L2
L1 L2
Ll L2
53 370
363
742
46 0
0
321
0 370
39
14
0.9 0.0
0.0
0.4
0.0 1.0
0.1
0.0
0.0 0.0
0.0
0.0
5
2
2
0.5
0.2
0.2
hRT-adj
-0.6
-0.7
-0.6
-0.6
hHV-adj
1.7
1.7
1.7
1.7
hadj, computed
0.0
0.4
-0.7
-0.0
0.1
Worksheet
4 -
Departure
Headway
and Service Time
Eastbound
Westbound
Northbound
Southbound
Ll
L2
L1
L2
Ll L2
Ll L2
Flow rate
29
53
370
363
742
hd, initial value
3.20
3.20
3.20
3.20
3.20 3.20
3.20 3.20
x, initial
0.03
0.05
0.33
0.32
0.66
hd, final value
8.46
7.88
6.73
6.56
6.28
x, final value
0.07
0.12
0.69
0.66
1.30
Move -up time, m
2.0
2.3
2.0
2.0
Service Time
6.5
5.6
4.4
4.6
4.3
_------------- Worksheet
5 -
Capacity
and Level
of Service -----
--------- ---
Eastbound
Westbound
Northbound
Southbound
Ll
L2
Ll
L2
Ll L2
L1 L2
Flow Rate
29
53
370
363
742
Service Time
6.5
5.6
4.4
4.6
4.3
Utilization, x
0.07
0.12
0.69
0.66
1.30
Dep. headway, hd
8.46
7.88
6.73
6.56
6.28
Capacity
279
303
528
539
742
Delay
12.08
11.61
23.15
21.49
165.63
LOS
B
B
C
C
F
Approach:
Delay
12.08
21.70
21.49
165.63
LOS
B
C
C
F
Intersection Delay
90.06
Intersection
LOS F
HCS+: Unsignalized Intersections Release 5.6
Phone: Fax:
E-Mail.
ALL -WAY STOP CONTROL(AWSC) ANALYSIS
Analyst: TMW
Agency/Co.: COK
Date Performed: 2/13/2012
Analysis Time Period: 3:15 to 4:15 PM
Intersection: MER2NDFP
Jurisdiction: FLATHEAD CO
Units: U. S. Customary
Analysis Year: 2022
Project ID: 12-002 FUTURE CONDITIONS
East/West Street: 2ND
North/South Street: MERIDIAN
__Worksheet 2 - Volume Adjustments and Site Characteristics
Eastbound I Westbound I Northbound I Southbound
I L T R I L T R I L T R I L T R
Volume 120 16 7 147 7 91 17 239 46 189 320 17
% Thrus Left Lane
Eastbound
Westbound
Northbound
Ll L2
L1 L2
Ll L2
Configuration
LTR
LTR
LTR
PHF
0.75
0.75
0.92
Flow Rate
56
192
315
% Heavy Veh
0
0
2
No. Lanes
1
1
1
Opposing -Lanes
1
1
1
Conflicting -lanes
1
1
1
Geometry group
1
1
1
Duration, T 0.25
hrs.
Worksheet 3 - Saturation Headway
Adjustment Worksheet
Eastbound
Westbound
Northbound
L1 L2
Ll L2
L1 L2
Flow Rates:
Total in Lane 56
Left -Turn 26
Right -Turn 9
Prop. Left -Turns 0.5
Prop. Right --Turns 0.2
Prop. Heavy Vehicle0.0
Geometry Group 1
Adjustments Exhibit 17-33:
hLT-adj 0.2
Southbound
L1 L2
LTR
0.92
461
2
1
1
1
1
Southbound
L1 L2
192
315
461
62
7
96
121
49
18
0.3
0.0
0.2
0.6
0.2
0.0
0.0
0.0
0.0
1
1
1
0.2
0.2
0.2
hRT-adj
-0.6
-0.6
-0.6
hHV-adj
1.7
1.7
1.7
hadj, computed
-0.0
-0.3
-0.1
--------------- Worksheet 4 -
Departure Headway and
Service Time
Eastbound
Westbound
Northbound
L1 L2
Ll L2
Ll L2
Flow rate
56
192
315
hd, initial value
3.20 3.20
3.20 3.20
3.20 3.20
x, initial
0.05
0.17
0.28
hd, final value
6.38
5.73
5.30
x, final value
0.10
0.31
0.46
Move -up time, m
2.0
2.0
2.0
Service Time
4.4
3.7
3.3
_Worksheet 5 -
Capacity and Level
of Service
Eastbound
Westbound
Northbound
L1 L2
L1 L2
L1 L2
Flow Rate
56
192
315
Service Time
4.4
3.7
3.3
Utilization, x
0.10
0.31
0.46
Dep. headway, hd
6.38
5.73
5.30
Capacity
306
442
565
Delay
10.08
11.22
12.79
LOS
B
B
B
Approach:
Delay
10.08
11.22
12.79
LOS
B
B
B
Intersection Delay
14.65
Intersection
LOS B
-0.6
1.7
0.1
Southbound
L1 L2
461
3.20 3.20
0.41
5.20
0.67
2.0
3.2
Southbound
L1 L2
461
3.2
0.67
5.20
675
17.91
C
17.91
C
HCS+: Unsignalized Intersections Release 5.6
TWO-WAY STOP CONTROL SUMMARY
Analyst: TMW
Agency/Co.: COK
Date Performed: 2/13/2012
Analysis Time Period: 4:30 TO 5:30 PM
Intersection: MERAPPFP-1
Jurisdiction: FLATHEAD CO
Units: U. S. Customary
Analysis Year: 2022
Project ID: 12-002 FUTURE CONDITIONS W/ NORTHBOUND LTL
East/West Street: APPLEWAY
North/South Street: MERIDIAN
Intersection Orientation: NS Study period (hrs): 0.25
__--Vehicle Volumes and Adjustments
----------------- ------- ---------
Major Street: Approach Northbound Southbound
Movement 1 2 3 1 4 5 6
L T R I L T R
Volume
126 583 0
0
581 0
Peak -Hour Factor, PHF
0.90 0.90 0.90
0.90
0.90 0.90
Hourly Flow Rate, HFR
140 647 0
0
645 0
Percent Heavy Vehicles
1 -- --
1
-- --
Median Type/Storage
TWLTL 7Y'
/ 2
RT Channelized?
Lanes
1 1 0
0
1 0
Configuration
L TR
LTR
Upstream Signal?
No
No
Minor Street: Approach Westbound
Eastbound
Movement 7 8 9
I 10
11
12
L T R
I L
T
R
------------------------------
---------------------------------------------
Volume
36
0
98
Peak Hour Factor, PHF
0.90 0.90
0.90
Hourly Flow Rate, HFR
40
0
108
Percent Heavy Vehicles
0
0
0
Percent Grade (%) 0
1
Flared Approach: Exists?/Storage
/
No /
Lanes
0 1 0
Configuration
------------------------------- --------------------------------------
LTR
Approach
Movement
Lane Config
v (vph)
C(m) (vph)
v/c
95% queue length
Control Delay
LOS
Approach Delay
Approach LOS
Delay, Queue Length, and Level of Service
NB
SB Westbound
Eastbound
1
4 17 8 9
I 10 11 12
L
LTR I
I LTR
----------
140
----------------_.--.-.....---------.----.
0
---.--.--.--.-
148
945
943
388
0.15
0.00
0.38
0.52
0.00
1.75
9.5
8.8
19.9
A
A
C
19.9
C
HCS+: Unsignalized Intersections Release 5.6
Phone: Fax:
E--Mail:
TWO-WAY STOP CONTROL(TWSC) ANALYSIS
Analyst: TMW
Agency/Co.: COK
Date Performed: 2/13/2012
Analysis Time Period: 4:30 TO 5:30 PM
Intersection: MERAPPFP-1
Jurisdiction: FLATHEAD CO
Units: U. S. Customary
Analysis Year: 2022
Project ID: 12-002 FUTURE CONDITIONS W/ NORTHBOUND LTL
East/West Street: APPLEWAY
North/South Street: MERIDIAN
Intersection Orientation: NS Study period (hrs): 0.25
Vehicle Volumes and Adjustments
------------------------ ---------------
Major Street Movements 1 2 3 4 5 6
L T R L T R
Volume
126
583
0
0
561
0
Peak -Hour Factor, PHF
0.90
0.90
0.90
0.90
0.90
0.90
Peak-15 Minute Volume
35
162
0
0
161
0
Hourly Flow Rate, HFR
140
647
0
0
645
0
Percent Heavy Vehicles
1
-
--
1
--
--
Median Type/Storage
TWLTL
/ 2
RT Channelized?
Lanes
1
1 0
0
1
0
Configuration
L
TR
LTR
Upstream Signal?
No
No
— ---------------------------------------------------------------------------
Minor Street Movements
7
8
9
10
11
12
L
T
R
L,
T
R
------------------------------------------------------------------------------
Volume
36
0
98
Peak Hour Factor, PHF
0.90
0.90
0.90
Peak-15 Minute Volume
10
0
27
Hourly Flow Rate, HFR
40
0
108
Percent Heavy Vehicles
0
0
0
Percent Grade (%)
0
1
Flared Approach: Exists?/Storage
/
No /
RT Channelized?
Lanes
0
1
0
Configuration
LTR
------------------
_--_Pedestrian Volumes and Adjustments
Movements 13 14 15 16
Flow (ped/hr) 0 0 0 0
Lane Width (ft) 12.0 12.0 12.0 12.0
Walking Speed (ft/sec) 4.0 4.0 4.0 4.0
Percent Blockage 0 0 0 0
Prog.
Flow
vph
S2 Left -Turn
Through
S5 Left -Turn
Through
___Upstream Signal Data_______ _____
Sat Arrival Green Cycle Prog Distance
Flow Type Time Length Speed to Signal
vph sec sec mph feet
Worksheet 3-Data for Computing Effect of Delay to Major Street Vehicles
Movement 2 Movement 5
-------------------------------------------------------------------------------
Shared In
volume, major
th vehicles:
645
Shared In
volume, major
rt vehicles:
0
Sat flow
rate, major th
vehicles:
1700
Sat flow
rate, major rt
vehicles:
1700
Number of
major street
through lanes:
1
Worksheet 4-Critical Gap and Follow-up Time Calculation
Critical Gap Calculation
Movement
1
4
7
8
9
10
11
12
--------------------------
L
L
--------------------------------------------------
L
T
R
L
T
R
t(c,base)
4.1
4.1
--
7.1
6.5
6.2
t(c,hv)
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
P (hv)
1
1
0
0
0
t(c,g)
0.20
0.20
0.10
0.20
0.20
0.10
Percent Grade
0.00
0.00
0.00
1.00
1.00
1.00
t(3,1t)
0.00
0.00
0.70
0.00
0.00
t(c,T):
1-stage 0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
2-stage 0.00
0.00
1.00
1.00
0.00
1.00
1.00
0.00
t(c)
1-stage 4.1
4.1
6.6
6.7
6.3
2--stage 4.1
4.1
5.6
5.7
6.3
---------------------------------------------------
Follow-Up
Time Calculations
--------------------------
Movement
1
4
7
8
9
10
11
12
L
L
L
T
R
L
T
R
------------
t(f,base)
-------------------------------
2.20
2.20
-----------------------------------
3.50
4.00
3.30
t(f,HV)
0.90
0.90
0.90
0.90
0.90
0.90
0.90
0.90
P(HV)
1
1
0
0
0
t(f)
2.2
2.2
3.5
4.0
3.3
Worksheet
5-Effect of
Upstream
Signals
---------------------------------------------------------------------------
Computation
1-Queue Clearance
Time at
Upstream
Signal
Movement
2
Movement 5
V(t)
V(l,prot)
V(t)
V(l,prot)
V prog
Total Saturation Flow Rate, s (vph)
Arrival Type
Effective Green, g (sec)
Cycle Length, C (sec)
RP (from Exhibit 16-11)
Proportion vehicles arriving on green P
g(ql)
g (q2)
g (q)
--------------------------------------------------------------------------
Computation 2-Proportion of TWSC Intersection Time blocked
Movement 2 Movement 5
V(t) V(l,prot) V(t) V(l,prot)
alpha
beta
Travel time, t (a) (sec)
Smoothing Factor, F
Proportion of conflicting flow, f
Max platooned flow, V(c,max)
Min platooned flow, V(c,min)
Duration of blocked period, t(p)
Proportion time blocked, p 0.000 0.000
--------- ---------------------------------------------
Computation 3-Platoon Event Periods Result
------------- ------------- ---------- ---------------------------- --------------
p(2) 0.000
p(5) 0.000
p (dom )
p(subo)
Constrained or unconstrained?
------------------------------------- ----------------------------------------
Proportion
unblocked (1) (2) (3)
for minor Single -stage Two -Stage Process
movements, p(x) Process Stage I Stage II
P(1)
p(4)
p(7)
p(8)
p(9)
p(10)
p(11)
p(12)
-----------------------------------------------------------------------------
Computation 4 and 5
Single -Stage Process
Movement 1 4 7 8 9 10 11 12
L L L T R L T R
---------------------------------------- -----------------------------
V c,x 645 647 1572 1572 645
s
Px
V c, u, x
C r, x
C plat, x
-
Two -Stage Process
7 8 10
11
Stagel Stage2 Stagel Stage2 Stagel Stage2 Stagel Stage2
V(c,x)
645
927 645 927
s
1500 1500
P(x)
V(C,U,x)
--------------- ----------------
-----------
C(r,x)
----------------------------------
C (plat, x)
----------------------------------------
-----------
Worksheet 6-Impedance and Capacity Equations
-----------------------------------------------------------------------------
--------------------------
Step 1: RT from Minor St.
------------------------------------------------------------------------------
9
12
Conflicting Flows
645
Potential Capacity
467
Pedestrian Impedance Factor
1.00
1.00
Movement Capacity
467
Probability of Queue free St.
1.00
0.77
---------------------------------------------------------------------------------
Step 2: LT from Major St.
--- ------------------
4
1
---------------------------.-------------------,-----------
Conflicting Flows
647
645
Potential Capacity
943
945
Pedestrian Impedance Factor
1.00
1.00
Movement Capacity
943
945
Probability of Queue free St.
1.00
0.85
Maj L-Shared Prob Q free St.
------------------------------------------------------------------------------
1.00
Step 3: TH from Minor St.
-------------------------._.._---------------------------------------------------
8
11
Conflicting Flows
1572
Potential Capacity
102
Pedestrian Impedance Factor
1.00
1.00
Cap. Adj. factor due to Impeding mvmnt
0.85
0.85
Movement Capacity
87
Probability of Queue free St.
---------------------------------------------------------------------------------
1.00
1.00
Step 4: LT from Minor St.
------- ------------------------------------
7
10
-----------------
Conflicting Flows
---------------_---
1572
Potential Capacity
112
Pedestrian Impedance Factor
1.00
1.00
Maj. L, Min T Impedance factor
0.85
Maj. L, Min T Adj. Imp Factor.
0.89
Cap. Adj. factor due to Impeding mvmnt
0.68
0.85
Movement Capacity
----------------------------
95
---------- -----------------------------------------
Worksheet 7-Computation of the Effect of Two -stage
------------------------------------------------------------------------------
Gap
Acceptance
Step 3: TH from Minor St.
8
11
------------------------------------------------------------------------------
Part 1 - First Stage
Conflicting Flows
645
Potential Capacity
350
454
Pedestrian Impedance Factor
1.00
1.00
Cap. Adj. factor due to Impeding mvmnt
0.85
1.00
Movement Capacity
298
454
Probability of Queue free St.
1.00
1.00
Part 2 - Second Stage
Conflicting Flows 927
Potential Capacity 471 332
Pedestrian Impedance Factor 1.00 1.00
Cap. Adj. factor due to Impeding mvmnt 1.00 0.85
Movement Capacity 471 283
Part 3 - Single Stage
Conflicting Flows 1572
Potential Capacity 102
Pedestrian Impedance Factor 1.00 1.00
Cap. Adj. factor due to Impeding mvmnt 0.85 0.85
Movement Capacity 87
Result for 2 stage process:
a 0.95 0.95
y
C t 87
Probability of Queue free St. 1.00 1.00
Step 4: LT from Minor St.
Part 1 - First Stage
Conflicting Flows
Potential Capacity
Pedestrian Impedance Factor
Cap. Adj. factor due to Impeding mvmnt
Movement Capacity
7 10
645
389
508
1.00
1.00
0.85
1.00
331
508
Part 2 - Second Stage
Conflicting Flows 927
Potential Capacity 497 369
Pedestrian Impedance Factor 1.00 1.00
Cap. Adj. factor due to Impeding mvmnt 0.77 0.85
Movement Capacity 382 314
------------------------------------------------------------------------------
Part 3 - Single Stage
Conflicting Flows 1572
Potential Capacity 112
Pedestrian Impedance Factor 1.00 1.00
Maj. L, Min T Impedance factor 0.85
Maj. L, Min T Adj. Imp Factor. 0.89
Cap. Adj. factor due to Impeding mvmnt 0.68 0.85
Movement Capacity 95
--------------------------------------------------------------------------------
Results for Two -stage process:
a 0.95 0.95
y 1.89
C t 266
---------- ---------------------- ---------- ------------------- -----------------
worksheet 8-Shared Lane Calculations
------------------------------------------------------------------------------
Movement 7 8 9 10 11 12
L T R L T R
Volume (vph) 40 0 108
Movement Capacity (vph) 266 87 467
Shared Lane Capacity (vph) 388
Worksheet 9-Computation of Effect of Flared Minor Street Approaches
------------------------------------------------------------------
Movement 7 8 9 10 11
L T R L T
C sep
volume
Delay
Q sep
Q sep +1
round (Qsep +1)
---------------
n max
C sh
SUM C sep
n
C act
Worksheet 10-Delay, Queue Length, and Level of Service
266 87
40 0
388
12
R
467
108
Movement
Lane Config
------ --------------------------------------------------------------
1
L
4 7
LTR
8 9 10 11 12
LTR
v (vph)
140
0
148
C(m) (vph)
945
943
388
v/c
0.15
0.00
0.38
95% queue length
0.52
0.00
1.75.
Control Delay
9.5
8.8
19.9
LOS
A
A
C
Approach Delay
19.9
Approach LOS
C
Worksheet 11-Shared Major LT Impedance and Delay
Movement 2 Movement 5
------------------------------ ------------------------------------------
P(oj) 0.85 1.00
v(il), Volume for stream 2 or 5 645
v(i2), Volume for stream 3 or 6 0
s(il), Saturation flow rate for stream 2 or 5 1700
s(i2), Saturation flow rate for stream 3 or 6 1700
P*(oj) 1.00
d(M,LT), Delay for stream 1 or 4 9.5 8.8
N, Number of major street through lanes 1
d(rank,l) Delay for stream 2 or 5 0.0
HCS+: Unsignalized Intersections Release 5.6
Phone: Fax:
E-Mail:
ALL --WAY STOP CONTROL(AWSC) ANALYSIS
Analyst: TMW
Agency/Co.: COK
Date Performed: 2/13/2012
Analysis Time Period: 4:30 TO 5:30 PM
Intersection: MERCENFP-1
Jurisdiction: FLATHEAD CO
Units: U. S. Customary
Analysis Year: 2022
Project ID: 12-002 FUTURE CONDITIONS W/ SOUTHBOUND LTL
East/West Street: CENTER
North/South•$treet: MERIDIAN
Worksheet 2 - Volume Adjustments and Site Characteristics
I Eastbound I
Westbound I
Northbound
I Southbound 1
L
T R I L
T
R I
L T R
I L T
R 1
1---------------1---------------I---------------I---------------I
Volume 114 7
7
341 10
13 1
4 143
299 36
1296 375
% Thrus Left Lane
Eastbound
Westbound
Northbound
Southbound
Ll L2
L1
L2
L1 L2
L1
L2
Configuration
LTR
LT
R
LTR
L
TR
PHF
0.80
0.92
0.92
0.92
0.92
0.92
Flow Rate
29
53
370
363
321
421
% Heavy Veh
0
0
1
1
0
1
No. Lanes
1
2
1
2
Opposing -Lanes
2
1
2
1
Conflicting -lanes
2
2
2
2
Geometry group
4b
5
4b
5
Duration, T 0.25
hrs.
Worksheet
-----------
3 - Saturation
Headway
Adjustment
Worksheet --------------
Eastbound
Westbound
Northbound
Southbound
L1 L2
L1
L2
Ll L2
L1
L2
Flow Rates:
Total in Lane
29
53
370
363
321
421
Left -Turn
17
46
0
0
321
0
Right -Turn
4
0
370
39
0
14
Prop. Left -Turns
0.6
0.9
0.0
0.0
1.0
0.0
Prop. Right -Turns
0.1
0.0
1.0
0.1
0.0
0.0
Prop. Heavy Vehicle0.0
0.0
0.0
0.0
0.0
0.0
Geometry Group
4b
5
4b
5
Adjustments Exhibit 17-33:
hLT-adj
0.2
0.5
0.2
0.5
hRT-adj
-0.6
-0.7
-0.6
hHV-adj
1.7
1.7
1.7
hadj, computed
0.0
0.4
-0.7
-0.0
_____-Worksheet 4 -
Departure
Headway and
Service Time
Eastbound
Westbound
Northbound
L1 L2
L1
L2
L1 L2
Flow rate
29
53
370
363
hd, initial value
3.20 3.20
3.20
3.20
3.20 3.20
x, initial
0.03
0.05
0.33
0.32
hd, final value
8.83
7.98
6.83
7.07
x, final value
0.07
0.12
0.70
0.71
Move -up time, m
2.3
2.3
2.3
Service Time
6.5
5.7
4.5
4.8
--------------- Worksheet 5 -
Capacity
and Level
of Service -----
Eastbound
Westbound
Northbound
L1 L2
Ll
L2
L1 L2
Flow Rate
29
53
370
363
Service Time
6.5
5.7
4.5
4.8
Utilization, x
0.07
0.12
0.70
0.71
Dep. headway, hd
8.83
7.98
6.83
7.07
Capacity
279
303
514
501
Delay
12.21
11.73
24.09
25.43
LOS
B
B
C
D
Approach:
Delay
12.21
22.54
25.43
LOS
B
C
D
Intersection Delay
25.57
Intersection
LOS D
-0.7
1.7
0.5 -0.0
Southbound
Ll
L2
321
421
3.20
3.20
0.29
0.37
7.36
6.84
0.66
0.80
2.3
5.1
4.5
Southbound
L1 L2
321 421
5.1 4.5
0.66 + 0.80
7.36 W 6.84
485 522
23.03 31.59
C D
27.89
D