11-23-05 Site Review MinutesSITE DEVELOPMENT REVIEW COMMITTEE SUMMARY
Wednesday, November 23, 2005
Building Department Conference Room
ATTENDING:
Frank Castles, Asst. City Engineer
Dwain Elkins, Building Inspector
Roger Krauss, Asst. Police Chief
P. J. Sorensen, Zoning Administrator,
Sandy Wheeler, Comm. Dev. Mgr.
Kathy Kuhlin, Recording Secretary
Mark Crowley, Construction Manager
Craig Kerzman, Building Official
F. Ray Ruffatto, Fire Inspector
Chair Narda Wilson, City Planner
Jennifer Young, Recreation Supervisor
Guests: Jason Hatten, Datum Drafting Design and Michael Blend, Blend Design and Build
Hear the Public: Nothing.
Performance Bond Reminders: Same as last week. Keep working toward completing the list.
OLD BUSINESS:
West Coast Hotel/Kalispell Center Mall — expansion — Plans have not yet been
submitted. F. Ray has been working with them on their water issues.
NEW BUSINESS:
Glacier Meadows, LLC — apartment complex / 421-429 2nd Ave W — This went through
Architectural Review this morning. ARC changes include adding a Dutch hip, some railings.,
a courtyard common area, and some landscape buffering between the buildings. Utility issues
with gas company, and they asked that the lines be routed. There has been some discussion
about bindings together due to various utility issues. Discussion was held regarding keeping
it as three separate lots with shared connections on each individual lot. Put separate
connections for each lot with one meter per lot, then the issue of binding the lots together
goes away. These will be built as townhouses, and a duplex. Two 2-unit duplexes. They will
have 2-hour separation walls. From the Site Review and zoning perspective, they will need to
move the building to allow for a 10 foot setback from the parking spaces to the alley. They
will need to add a van accessible handicap parking space. A Lighting Plan needs to be
submitted, and the landscaping improved as previously noted. The alley will need to be paved
if it isn't yet, from the closest end to the end of their property. They will need a Landscaping
Plan for the common area. Addressing will be handled by Fred Zavodny. This is approved
with the conditions as listed above.
PLANNING OFFICE ITEMS:
Planning Board Agenda — Nothing.
OTHER REPORTS:
Village Greens — The Police Department has done some traffic control of the area discussed
last week. They also have the radar trailer set up there.
Glacier High School — Frank has asked Swank to put garbage bags on the fire hydrants at
the new high school.
Jim Holmquist — West Evergreen — He can now connect to the sewer connections.
Luther French — He got all of his annexation paperwork in. This property is located off of
Woodland Avenue, east of Lehi Lane.
Burton — He will be asking for a municipal facilities sign off from Public Works and will be
asking for a building permit. Narda said we should handle the building permit.
Touchmark — a/k/a Waterford — Came in with a request for 272 units for Phase I. They will
be extending the road connection between Northland and Four Mile Drive.
Stillwater and Reserve Subdivision — The wall on a berm was discussed. Bruce Lutz spoke
with Mike Baker about this. Jennifer will e-mail the plans to Roger, F. Ray, Mark and Narda.
The meeting was adjourned at 10:45 a.m.
cc: Police
City Manager
Bldg
Fire
Planning