Loading...
03. Award Bid - South Meridian Roadway Improvement ProjectMEMORANDUM August 15, 2012 2011" Avenue East PO Box 1997 Kalispell, MT 59903 Phone: 406-758-7720 Fax: 406-758-7831 www.kalispell.com /public works TO: Doug Russell, City Manage FROM: Keith Haskins, City Project Manager SUBJECT: Award Bid — South Meridian Road Intersection Improvement Project MEETING: August 20, 2012 BACKGROUND: Recommendations to mitigate the traffic flow problems on South Meridian Road were developed as part of a study completed by Stelling Engineers. The study found that the two intersections causing the most congestion on South Meridian Road were Center Street and Appleway Drive. Stelling Engineers' proposed solution to the problem is to widen the roadway and add left turn lanes at Center Street and Appleway Drive. The City retained Stelling Engineers to develop the necessary plans to accomplish these goals. The South Meridian Road Intersection Improvement Project modifies the intersection of South Meridian Road and Center Street with the work contained in the Base Bid portion of the contract and modifies the intersection of Meridian Road and Appleway Drive with the work contained in Additive Bid Item No. 1. Negotiations are currently taking place with a landowner north of Appleway Drive to acquire the necessary right-of-way to adequately widen the road for the intersection at Appleway Drive. As such, approval of Additive Bid Item No. 1 is contingent upon finalizing and filing the required right-of-way documents. Bids were opened on Monday, August 13, 2012 at 2:30 pm. Two responsive bids were received. The bid results follow: CONTRACTOR BASE BID LHC Inc. $ 123,529.82 Knife River $ 159,446.35 A.B.I. No. 1 BID TOTAL $ 48,084.22 $ 171,614.04 $ 50,720.60 $ 210,166.95 STAFF RECOMMENDATION: Award the Base Bid for the South Meridian Road Intersection Improvement Project to LHC in the amount of $123,529.82. Award the Additive Bid Item No. 1 in the amount of $48,084.22 contingent upon attainment of required additional street right-of-way. 1JUMINIM Z'A FISCAL EFFECTS: The project will be funded by the Westside Tax Increment Capital Project Fund. ALTERNATIVES: As suggested and approved by the City Council. 1z I Keith Hasfdns --susie Turner City Project Manager Director of Public Works