Section 607/FencesReset guardrail is measured by the linear foot (meter) from center -to -center of
the end posts of each section reset.
606.04.6 Raise Guardrail. Raise guardrail, including terminal sections, is
measured by the linear foot (meter) from center -to -center of the end posts of each
section.
606.04.7 Cable Guardrail. Cable guardrail is measured by the linear foot (meter)
to the nearest 0.1 foot (0.1 m) from center -to -center of the end posts of each
section.
606.04.8 Cable Guardrail Anchor Sections. Cable guardrail end anchor sections
and road approach anchor sections are measured by the unit for each type
specified.
606.04.9 Revise Guardrail Elements. Revise guardrail elements is measured by
the unit for each element revised, as specified in the Contract.
606.04.10 Stiffened Guardrail Sections. Stiffened guardrail sections are
measured by the linear foot (meter) to the nearest 0.1 foot (0.1 m) from center -to -
center of the end posts of each stiffened section.
606.05 BASIS OF PAYMENT. Payment for the completed and accepted quantities
is made under the following.
Pay Item
Pay Unit
Metal Guardrail
Linear Foot (meter)
Metal Guardrail End Anchor
Each
Bridge Approach Sections
Each
Concrete Median Barrier Rail
Linear Foot (meter)
Remove Guardrail and Reset Guardrail
Linear Foot (meter)
Raise Guardrail
Linear Foot (meter)
Cable Guardrail
Linear Foot (meter)
Cable Guardrail Anchor Sections
Each
Revise Guardrail Elements
Each
Stiffened Guardrail Sections
Linear Foot (meter)
Revise guardrail elements is paid for under "Revise Bridge Approach
each, or "Revise Guardrail Terminal Section" -each.
Payment at the contract unit price is full compensation for all
necessary to complete the item of work under the Contract.
SECTION 607
FENCES
607.01 DESCRIPTION. This work is constructing, removing and resetting barbed
wire, combination barbed and woven wire, chain link fences and gates.
607.02 MATERIALS. Furnish materials meeting the following requirements:
Chain Link Fence .................... Subsection 712.01
Interstate and Farm Fence ............. Subsection 712.02
Class "F" Portland Cement Concrete .......... Section 551
Fence material acceptance test samples will be taken from the materials
delivered to the project.
607.03 CONSTRUCTION REQUIREMENTS.
607.03.1 General Requirements. Construct fencing before any other work is
performed on all parcels of land. This requirement may be waived where the
Contractor has obtained a landowner written waiver. The waiver must state a
completion date agreed to by the Landowner and Contractor for completing the
fence work.
Maintain all existing fence enclosures. Close Contractor fence openings using
new permanent fence, or use temporary fence, cattleguards, or watchman where
new permanent fence cannot be constructed the same day.
Temporary fence may be used in place of new permanent fence if approved.
607.03.2 Clearing and Leveling Fence Lines. Keep clearing and leveling outside
h(I�pill l
the fence line to a minimum.
Ipp
Remove and dispose of trees, shrubs, brush, rocks, and other obstacles that
jl
interfere with the fence construction under Section 201. Contour the ground at the
G
fence line to permit fence construction.
607.03.3 Constructing Chain Link Fence. Construct chain link fence as specified
in the Contract and.meeting the following requirements:
it"�
9i+'r
A. Posts. Set posts vertically, spaced at maximum 10 foot (3 m) centers,
m " ',
'ii� )i�
measured parallel to the ground surface.
h,,
Set posts for 5 and 6 foot (1.5 m and 1.8 m) fence in concrete. Set end,
rw.� �r'h
corner, and pull posts for 3 and 4 foot (0.9 m and 1.2 m) fence and line
ces"�!
posts connected by bracing to end, corner, or pull posts in concrete. Drive
or set in concrete, line posts on 3 and 4 foot (0.9 m and 1.2 m) fence as
specified.
6
Use the footing dimensions and post embedment depths shown in the
Detailed Drawings. Crown concrete footings to shed water.
Do not damage posts while driving them. Backfill and compact the voids
around posts.
in least 14-
Set line posts placed solid rock without soil overburden, at
ili
inches (360 mm) deep. When in solid rock, set end, corner, gate, and pull
304 305
B.
C.
ttO aL icctsi cu-mcnes (bio mm) deep. Excavate or drill holes to a
minimum width or diameter 1-inch (25 mm) greater than the largest
dimension of the post being set.
Cut posts to the required length before installing. The Contractor may
use an even post length set deeper into the solid rock at Contractor
expense.
For metal posts placed in bored rock holes or consolidated soils, set the
post plumb and fill the holes with grout that is one part portland cement and
three parts clean, uniformly graded sand. Work the grout into the holes to
eliminate voids. Concrete footings are not required where posts are set in
bored holes.
Place posts, set in solid rock covered by soil or loose rock, to the
specified depths or to the minimum solid rock depths specified above,
whichever is less. When solid rock is encountered before reaching the
specified depth, construct concrete footings from the solid rock to the top
of the ground on 5 and 6 foot (1.5 and 1.8 m) fence and on end, corner, and
pull posts for 3 and 4 foot (0.9 and 1.2 m) fence. Grout around that part of
the post that is in solid rock.
Assure all posts are solid once they are driven, backfilled or concrete
is placed.
Top Rail or Cable. Pass the top rails through the line post tops, providing
a continuous brace from end -to -end of each fence section. Join top rail
sections using sleeve -type couplings. Fasten the top rails to the terminal
posts using pressed steel fittings.
Replace the top rails with a 3/8-inch (9.5 mm) diameter galvanized steel
cable when fences are placed within 50 feet (15.2 m) from the edge of the
nearest driving lane.
Fence Fabric. Place chain link fabric for 6 foot (1.8 m) fence on tangents,
on the post face away from the highway. On 3, 4 , and 5 foot (0.9, 1.2, and
1.5 m) fence, place the fabric as directed. On curves, place the fabric for all
fence heights on the outside face of the posts on curves.
Place the chain link fabric on a straight grade between posts, leveling
high points on the ground. Obtain the Project Manager's approval to fill in
depressions along the fence line.
Stretch taut and securely fasten the fabric to the posts. Stretching by
motor vehicle is prohibited. Use stretcher bars and fabric bands spaced at
1 foot intervals (305 mm) to fasten to end, gate, corner, and pull posts. Cut
the fabric and attach each span independently at all pull and corner posts.
Fasten fabric to line posts at 14-inch (360 mm) intervals with tie wire, metal
bands, or other approved fasteners. Fasten the top edge of the fabric to the
top rail or cable with tie wires spaced at 18-inch (460 mm) intervals.
Join rolls of wire fabric by weaving a single strand into the ends of the
rolls forming a continuous mesh.
When a winged cattle guard is located in a chain link fence, extend the
wire fabric beyond the post supporting the wing and securely fasten it to the
wing.
306
D. Tension Wire. Attach a tension wire to the bottom of the chain link fabric
using ring fasteners at 24-inch (610 mm) maximum intervals and secure at
the terminal posts or pull posts using brace bands.
E. Gates. Fasten chain link fabric to the gate frame end bars using stretcher
bars and fabric bands, and to the top and bottom of gate frame bars using
tie wires for the chain link fence, or by other approved standard methods.
Clean welded connections on steel gate frames with burned spelter
coating by wire brushing, to remove all traces of the welding flux and loose
or cracked spelter. Paint the cleaned areas with two coats of zinc oxide -zinc
dust paint mixed in a weight ratio of one part zinc oxide to four parts zinc
dust.
Provide the drop -bar locking device for double metal gates with a 12-
inch (305 mm) square by 15-inch (380 mm) deep Class "F" concrete footing
crowned at the top. Provide a minimum 6-inch (155 mm) hole in the footing
to receive the locking bar.
F. Panels. Install panels as shown in the Detailed Drawings.
Double panels at fence corners and angle points consist of one corner
post, two line posts, two braces, two truss rods, two top rails, concrete, and
other fixtures. Single panels at gates and fence ends consist of one gate or
end post, one line post, one brace, one truss rod, one top rail, concrete, and
associated fixtures.
607.03.4 Con$tructing Barbed and Woven Wire Fences. Construct barbed and
woven wire farm and interstate fences meeting the Contract requirements and the
following.
A. Posts and Braces. Excavate post holes, footing excavations, and anchors
as shown in the Detailed Drawings.
Wood posts may be driven. Repair or replace all damaged posts at
Contractor expense.
Treat cut or trimmed areas on posts and braces with three applications
of a copper naphthenate solution containing a minimum of 2 percent copper
metal or with chromated copper arsenate (CCA) meeting AWPA M4
requirements.
Securely nail braces to terminal and brace posts.
Metal posts not specified to be set in concrete may be driven. Place
and grout metal posts placed in rock as specified.
Backfill and compact post hole material in 6-inch (155 mm) loose lifts.
Dampen holes before placing concrete. Assure the concrete has set
before placing and stretching the fence wire or attaching gates to the posts
and braces._
B. Placing Wire. After the posts, braces, and footings are set, place the
woven wire and/or barbed wire, stretch it tightly, and fasten to the posts.
Apply tension following the wire manufacturer's recommendations with
a mechanical or other approved wire stretcher. Do not use motor vehicles
to stretch fence.
Diagonally drive U-shaped staples across the wood grain so both points
enter different grains. Where wire uplift occurs, drive staples with the points
slightly upward. On level ground and over knolls, drive staples slightly
307
- - FENCES
downward. Staple the wire tightly at corner, end, and pull posts. The staples
on line posts must allow wire movement without damaging the wire.
Place "Deadman" as shown in the Detailed Drawings at grade
depressions, alignment angles, and other places where stresses might pull
posts from the ground or out of alignment.
Install one metal line post in each 500 foot (152.5 m) wood post fence
run and in smaller runs between gate post ends for lightening protection.
Construct gates as shown in the Detailed Drawings meeting Subsection
712.02 requirements.
607.03.5 Temporary Fence. Erect temporary fence to keep livestock and traffic out
of the work area. Temporary fence may remain in place only during the work or until
the fence is directed to be removed.
Use Type F3M as temporary fence for livestock enclosures. Construct all
temporary fence from metal posts and materials meeting Section 712. Use the
minimum number of braces, panels, deadman, and other accessories for
constructing temporary fence.
Undamaged material used in the temporary fence that meets specifications may
be used in the permanent fence. Material not used in permanent fencing remains
the Contractor's property.
Remove temporary fence at Contractor expense.
607.03.6 Remove and Reset Fence. When removing and resetting a fence, furnish
all required materials over and above the usable salvaged fence that are new
materials meeting Section 712 requirements. Required new materials are listed in
the Contract. Use, to the extent practical, materials of the same type and quality as
those of the old fence that meet of Section 712 requirements.
Replace rotten, damaged, or broken posts and rusty, unusable wire with new
material. Do not use any galvanized materials with abraded or broken coating.
Furnish all additional fence wire required for depressions.
Carefully handle and stockpile, at designated locations, all removed fence
determined to be salvageable.
607.04 METHOD OF MEASUREMENT.
607.04.1 New Fence. Chain link fence is measured by the linear foot (meter) to the
nearest foot (0.1 m). Interstate, farm, and temporary fence is measured by the linear
foot (meter) and converted to rods (meter) to the nearest 0.1 rod (0.1 m). The
measurements are made on the fence line along the top wire or rail or along a line
parallel thereto, from end post to end post including wing fences to structures.
Gates, cattle guards, or other openings are measured separately. Double sections
of fence erected across depressions are measured for payment. All other temporary
closures are included in the measurement of temporary fence. Temporary fence
materials ordered by the Contractor but not used in the work will not be measured
or paid for. Temporary fence removal is not measured separately.
607.04.2 Remove and- Reset Fence. Remove and reset chain link fence is
measured by the linear foot (meter). Remove and reset fence (interstate and farm)
is measured by the linear foot (meter) and converted to rods (meter) to the nearest
0.1 rod (0.1 m). Measurement of re -set fence in place is made under Subsection
607.04.1.
New posts and wire required to reset the removed fence is measured as follows:
1. Wood and metal posts are measured by the unit.
2. Barbed wire is measured by the spool. A spool contains 80 rods (402.6 m)
of wire.
3. Woven wire is measured by the roll. A roll contains 20 rods (100.6 m) of
woven wire.
The post and wire quantity specified in the contract is an estimate only. The
actual quantity required to complete the work will be paid for at the contract unit
price bid.
Panels required for remove and reset fence are not measured for payment.
507.04.3 Gates. Gates are measured by the linear foot (meter) between gate posts.
607.04.4 Fence Panels. Single and double fence panels are measured by the unit.
607.04.5 Deadman. Deadman are measured by the unit. Anchors are not
measured for payment.
607.04.6 Dozer Operation. Dozer operation is measured by the hour under
Subsection 210.04.1. When dozer operation is not a bid item, it is incidental to and
Included in other fencing items.
.04.7 Remove Fence. Remove chain link fence is measured by the linear foot
ter). Remove fence (interstate and farm) is measured by the linear foot (meter)
lace before removal along the top wire, or on a line parallel thereto, exclusive of
Ds, cattle guards, and other openings, and converted to rods (meter) to the
rest 0.1 rod (0.1 m).
17.05 BASIS OF PAYMENT. Payment for the completed and accepted quantities
made under the following:
Pay Item
New Fence Chain Link
Interstate, Farm & Temp.
Remove and Reset Fence Chain Link
Interstate and Farm
New wood or metal posts
Barb Wire
Woven Wire
Gates
Fence Panels
Deadman
Dozer Operation
Remove Fence
Pay Unit
Linear Foot (meter)
Linear Rod (meter)
Linear Foot (meter)
Linear Rod (meter)
Each
Spool
Roll
Linear Foot (meter)
Each
Each
Hour (see subsection 210.05)
Linear Foot (meter)