Part 7 - Wage Rate SchedulePART VII WAGE RATE SCHEDULE
WAIS Document Retrieval
Page 1 of 5
GENERAL DECISION: MT20030002 11/07/2003 MT2
Date: November 7, 2003
General Decision Number: MT20030002 11/07/2003
Superseded General Decision Number: MT020002
State: Montana
Construction Types: Highway
Counties: Montana Statewide.
HIGHWAY CONSTRUCTION PROJECTS
Modification Number Publication Date
0 06/13/2003
1 11/07/2003
* SUMT2001-001 09/04/2003
**ZONE PAY**
CARPENTERS, CEMENTS MASONS, IRON WORKERS, LABORERS, POWER
EQUIPMENT OPERATORS, TRUCK DRIVERS
The hourly wage rates applicable to each project shall be
determined by measuring the road miles over the shortest
practical maintained route from the County Court House of the
following towns to the center of the job:
BILLINGS, BOZEMAN, BUTTE, GREAT FALLS, HAVRE, HELENA,
KALISPELL, LEWISTOWN, MILES CITY, MISSOULA
ZONE 1: 0 to 30 miles
ZONE 2: 30 to 60 miles - Base Pay +$2.95
ZONE 3: Over 60 miles - Base Pay + $4.75
Rates Fringes
Carpenters:
Carpenter ...................$ 19.55 5.85
Piledriverman...............$ 19.55 5.85
Cement Mason ...................$ 17.37 5.50
Electricians:
Area
I ......................$
18.74
2.93+3.8%
Area
2......................$
20.13
4.76+3.8%
Area
3......................$
19.98
3.44+3.8%
Area
4......................$
19.84
3.51+3.8%
Area
5......................$
20.54
3.54+3.8%
Area
6......................$
18.02
3.44+3.8%
ELECTRICIANS AREA DESCRIPTIONS
AREA 1: Beaverhead, Deer Lodge, Granite, Jefferson, MZdison,
Silver Bow, and Powell Counties
AREA 2: Big Horn, Carbon, Carter, Custer, Dawson, Fallon,
Garfield, Golden Valley, Musselshell, Powder River, Prairie,
Rosebud, Stillwater, Treasure, Wibaux, and Yellowstone
counties
AREA 3: Blaine, Cascade, Chouteau, Daniels, Fergus, Glacier,
Hill, Judith Basin, Liberty, McCone, Petroleum, Pondera,
Phillips, Richland, Roosevelt, Sheridan, Teton, Toole,
http://frwebgate. access.gpo.gov/cgi-bin/getdoc.cgi?dbname=Davis-Bacon&docid=MT200... 4/19/2005
WAIS Document Retrieval
Page 2 of 5
Valley, and Wheatland Counties
AREA 4: Broadwater, Lewis and Clark, and Meagher Counties
AREA 5: Flathead, Lake, Lincoln, Mineral, Missoula, Ravalli,
and Sanders Counties
AREA 6: Gallatin, Park, and Sweet Grass Counties
Ironworker
Flathead, Glacier,
Lake, Lincoln,
Mineral, Missoula and
Sanders Cos .................$ 20.43 10.00
Remaining Counties .......... $ 18.97 10.87
Laborers:
Group I
.....................$
13.68
5.50
Group 2
.....................$
16.18
5.50
Group 3
.....................$
16.35
5.50
Group 4
.....................$
17.18
5.50
LABORERS
CLASSIFICATIONS
GROUP 1: Flag person
GROUP 2: All General Labor work; Burning Bar; Bucket man;
Carpenter Tender; Caisson Worker; Cement Mason Tender; Cement
Handler (dry); Chuck Tender; Choker Setter; Concrete worker;
Curb Machine -Lay Down; Crusher and Batch Plant Worker; Fence
Erector; Form Setter; Form Stripper; Heater Tender;
Landscaper; Pipe Wrapper; Pot Tender; Powderman Tender;
Rail and Truck Loaders and Unloaders; Riprapper; Sealants
for Concrete and other materials; Sign Erection, Guard Rail
and Jersey Rail; Stake Jumper; Spike Driver; Signalman;
Tail Hoseman; Tool Checker and Houseman; Traffic Control
worker
GROUP 3: Concrete Vibrator; Dumpman (Grademan); Equipment
Handler; Geotextile and Liners; High -Pressure Nozzlemen;
Jackhammer (Pavement Breaker); Laser equipment; Non -riding
Rollers; Pipelayer; Posthole Digger (power); Power Driven
Wheelbarrow; Rigger; Sandblaster; Sod Cutter -power; Tampers
GROUP 4: Ashpalt Raker; Cutting Torch; Grade Setter; High -
Scaler; Power Saws (Faller & Concrete); Powderman ($1.00 per
hour above Group 4 rate); Rock & Core Drill; Track or Truck
mounted Wagon Drill; Welder including Air Arc
Line Construction
Equipment Operator .......... $ 19.16 5.05
Groundman...................$ 15.40 5.05
Painters: ...................... $ 19.55 5.50
Pavement marking and related work. Includes operating marking
and all other equipment and all work involved in traffic m
arking including removal, surface preparation and
application of pavement markings including epoxies, paints,
tape, buttons, thermo- plastics and any other products
applied for traffic marking purposes and for directing and
regulating traffic
Power Equipment Operator
Group
1.....................$
17.51
5.50
Group
2.....................$
18.38
5.50
Group
3.....................$
19.12
5.50
Group
4.....................$
19.71
5.50
Group
5.....................$
20.85
5.50
httn //frcvahnota annAoo _"r d/ionnm
WAIS Document Retrieval
Page 3 of 5
Group 6.....................$ 21.44 5.50
Group 7.....................$ 23.22 5.50
POWER EQUIPMENT OPERATORS CLASSIFICATIONS
GROUP 1: A -Frame Truck Crane; Air Compressor; Auto Fine
Grader; Belt Finishing Machine; Boring Machine (small);
Cement Silo, Crane; Crusher Conveyor, DW-10, 15, and 20
Tractor Roller; Farm Tractor; Forklift; Form -Grader;
Front-end Loader under 1 cu yd;0iler, Heavy Duty Drills;
Pumpman; Oiler (All, except Cranes and Shovels)
GROUP 2: Air Doctor; Backhoe/Excavator/ Shovel to & incl 3 cu
yd Bit Grinder; Bitunimous Paving Travel Plant; Boring
Machine, large: Broom, Self -Propelled; Concrete Bucket
Dispatcher; Concrete Conveyor; Concrete Finish Machine;
Concrete Float and Spreader; Concrete Travel Batcher;
Distributor; Dozer, Rubber tired, Push, and Side Boom;
Drills, Heavy Duty (all types); Elevating Grader/Gradall;
Field Equipment Serviceman; Front-end Loader 1 cu yd to and
incl. 5 cu yd; Grade Setter; Hoist/Tugger (All Hydralift &
Similar); Industrial Locomotive; Motor Patrol (Except
Finish); Mountain Skidder; Oiler, Cranes & Shovels; Pavement
Breaker, EMSCO; Power Saw, Self -Propelled; Pugmill;
Pumperete/ Grout Machine; Punch Truck; Rollers (All except
Asphalt Finish and Breakdown); Ross Carrier; Rotomill under 6
ft; Trenching Machine; Washing/Screening Plant
GROUP 3: Asphalt Finish Roller; Asphalt Breakdown Roller;
Asphalt Paving Machine; Backhoe/Excavator/Shovel larger than
3 cu yd; Asphalt Screed; Concrete Batch Plant; Cableway
Highline; Concrete Curing Machine; Cranes, 24 tons & under;
Cranes, Creter; Cranes, Electric Overhead; Concrete Pump;
Curb Machine/Slip Form Paver; Finish Dozer; Mechanic/Welder;
Pioneer Dozer; Rotomill 6 ft and over; Scraper, Single
Engine; Scraper Twin or pulling Belly Dump; Yo Yo Cat
Front-end Loader over 5 cu yd;
GROUP 4: Asphalt/Hot Plant Operator; Cranes, 25 tons to 44
tons; Crusher Operator; Finish Motor Patrol; Finish Scraper
SPECIAL OPERATORS:
GROUP 5: Cranes, 45 tons to and including 74 tons
GROUP 6: Cranes, 75 tons to and including 149 tons
GROUP 7: Cranes, 150 tons to and including 250 tons; Cranes
over 250 tons: add $1.00 for every 100 tons over 250 tons;
Crane, Stiff -Leg or Derrick; Crane, Tower all); Crane,
Whirley (all); Helicopter Hoist
Truck drivers:
Group 1.....................$ 14.96 5.50
Group 2.....................$ 19.55 5.50
GROUP 1: Pilot Car
GROUP 2: Combination Truck and Concrete Mixer and Transit
Mixer; Dry Batch Trucks; Distributor Driver; Dumpman; Dump
Trucks and similar equipment; Dumpster; Flat Trucks; Lumber
Carriers; Lowboys; Pickup; Powder Truck Driver; Power Boom;
Serviceman; Service Truck/Fuel Truck/Tireperson; Truck
Mechanic; Trucks with Power Equipment; Warehouseman,
Partsman, Cardex and Warehouse Expeditor; Water Trucks
http: //frwebg ate. acces s . gpo. gov/cgi-binlgetdoc. cgi ?dbn ame=Davis-Bacon &doci d=MT200... 4/ 19/2005
WAIS Document Retrieval
Page 4 of 5
WELDERS - Receive rate prescribed for craft performing
operation to which welding is incidental.
----------------------------------------------------------------
----------------------------------------------------------------
Unlisted, classifications needed for work not included within
the scope of the classifications listed may be added after
award only as provided in the labor standards contract clauses
(29CFR 5'.5 (a) (1) (ii)) .
In the listing above, the "SU" designation means that rates
listed under the identifier do not reflect collectively
bargained wage and fringe benefit rates. Other designations
indicate unions whose rates have been determined to be
prevailing.
WAGE DETERMINATION APPEALS PROCESS
1.) Has there been an initial decision in the matter? This can
be:
* an existing published wage determination
* a survey underlying a wage determination
* a Wage and Hour Division letter setting forth a position on
a wage determination matter
* a conformance (additional classification and rate) ruling
On survey related matters, initial contact, including requests
for summaries of surveys, should be with the Wage and Hour
Regional Office for the area in which the survey was conducted
because those Regional Offices have responsibility for the
Davis -Bacon survey program. If the response from this initial
contact is not satisfactory, then the process described in 2.)
and 3.) should be followed.
With regard to any other matter not yet ripe for the formal
process described here, initial contact should be with the
Branch of Construction Wage Determinations. Write to:
Branch of Construction Wage Determinations
Wage and Hour Division
U.S. Department of Labor
200 Constitution Avenue, N.W.
Washington, DC 20210
2.) If the answer to the question in 1.) is yes, then an
interested party (those affected by the action) can request
review and reconsideration from the Wage and Hour Administrator
(See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:
Wage and Hour Administrator
U.S. Department of Labor
200 Constitution Avenue, N.W.
Washington, DC 20210
The request should be accompanied by a full statement of the
interested party's position and by any information (wage
payment data, project description, area practice material,
etc.) that the requestor considers relevant to the issue.
3.) If the decision of the Administrator is not favorable, an
interested party may appeal directly to the Administrative
Review Board (formerly the Wage Appeals Board). Write to:
�,}t„•»f,.,,o�,,,,to.---n n --, d»00005
WAIS Document Retrieval
Page 5 of 5
Administrative Review Board
U.S. Department of Labor
200 Constitution Avenue, N.W.
Washington, DC 20210
4.) All decisions by the Administrative Review Board are final.
END OF GENERAL DECISION