Loading...
08/26/10 RFR No. 1HEEnyineerm, Inc. �� pla"I"ing e Transportation 0 Wastewater 9 Airports 9 Water 9 Site Development 9 Structures Cau/te Kalispell Office 1372 Airport Road Kalispell, MT 59901 406.755.8602 FAX 406.755.8710 Email: Mail@stellinginc.com August 26, 2010RECEf"T"D Ms. Jane Howington, City Manager SEP Attn: Fred Leistiko City of Kalispell P.O. Box 1997 FINANCE OPl"ICE Kalispell, MT 59901 KAL.ISPEL , I�;C pi'ANA RE: Kalispell City Airport —Master Plan Update Project AIP 3-30-0043-003-2010 Dear Ms. Howington: Please find enclosed Request for Reimbursement (RFR) No. 1 for the Kalispell City Airport Master Plan Update, AIP 3-30-0043-003-2010. Please sign the RFR and mail it with the enclosed letter and invoices directly to Gary Gates at the FAA. I have also enclosed a copy of the RFR package for your files. RFR No. I includes the following: Engineering Fees 01 ecaw9/�7�iv J q? e° Task 1 — Master Plan Update 10/11 I //� ga $9,000.00 Task 2 — ALP Update i�, /0 1,250.00 Task 3 — Public Outreach Program 1,850.00 Subtotal Engineering Fees $12,100.00 Total Allowable Costs $12,100.00 fE 0 Federal Share (95% of Allowable) $11,495.00' Sponsor Share (5%) tl,1 q $605.00yA 91 2'? I to In approximately two (2) to three (3) weeks, you will receive a direct deposit from the FAA in the amount of $11,495.00 The Federal government requires you to make payment on outstanding claims within five (5) business days of receiving your reimbursement. Upon receipt of your FAA payment on RFR No. 1, please make the following payments: Stelling Engineers, Inc. Sincerely, Jeff Walla, P.E. Stelling Engineers, Inc. Enclosure $12,100.00 y3o 3�0 - 9ya ` Z:\Project-Active\Airports\0043 -Kalispell City\003-2010\Grants\RFR's\0043-003-2010 RFR No 1 Transmit Howington.doc < 0 CD Z) a) 0- o m ID O. 0 O CD CD 00 0 CD 3 U) Q) to rq. < 0 0 -n m 0 12. CD > 0 :3 ID CD En 7C) q CD 0 70 m 0 CD Z) > 41 41 E3 0 co 0 — -f, 00 C: (o -�n co 0 C� CD C) C� Ll LT IGS a Q0 p 0 0 Engineers, Franning e Transportation 9 Wi canouirmg Kalispell Office 1372 Airport Road Kalispell, IVIT 59901 406.755.8602 FAX 406.755.871 Email: Mail@stellingine.com August 26, 2010 Ms. Jane Howington, City Manager Attn: Fred Leistiko City of Kalispell P.O. Box 1997 Kalispell, MT 59901 M�� =M Please find enclosed Request for Reimbursement (RFR) No. 1 for the Kalispell City Airport Master Plan Update, AIP 3-30-0043-003-2010. Please sign the RFR and mail it with the enclosed letter and invoices directly to Gary Gates at the FAA. I have also enclosed a copy of the RFR package for your files. RFR No. 1 includes the following: Engineering Fees Task 1 — Master Plan Update $9,000.00 Task 2 — ALP Update 1,250.00 X Task 3 — Public Outreach Program 1,850.00— Subtotal Engineering Fees $12,100.00 Total Allowable Costs In approximately two (2) to three (3) weeks, you will receive a direct deposit from the FAA in the amount of $11,495.00 The Federal government requires you to make payment on outstanding claims within five (5) business days of receiving your reimbursement. Upon receipt of your FAA payment on RFR No. 1, please make the following payments: Stelling Engineers, Inc. $12,100.00 Sincerely, Jeff Walla, P.E. Stelling Engineers, Inc. Enclosure Z:\Project-Active\Airports\0043 -Kalispell City\003-2010\Grants\RFR!s\0043-003-2010 RFR No 1 Transmit Howington.doc eers, Inc. Transportation ! Wastewater e Airports 9 Water ® Site Development e Structures e Kalispell Office 1372 Airport Road Kalispell, MT 59901 406.755.8602 FAX 406.755.8710 Email: Mail@stellingine.com August 26, 2010 Ms. Jane Howington, City Manager Attn: Fred Leistiko City of Kalispell P.O. Box 1997 Kalispell, MT 59901 RE: Kalispell City Airport —Master Plan Update Project AIP 3-30-0043-003-2010 Dear Ms. Howington: Please find enclosed Request for Reimbursement (RFR) No. 1 for the Kalispell City Airport Master Plan Update, AIP 3-30-0043-003-2010. Please sign the RFR and mail it with the enclosed letter and invoices directly to Gary Gates at the FAA. I have also enclosed a copy of the RFR package for your files. RFR No. 1 includes the following: Engineering Fees Task 1 — Master Plan Update Task 2 — ALP Update Task 3 — Public Outreach Program Total Allowable Costs Federal Share (95% of Allowable) Sponsor Share (5%) $9,000.00 1,250.00 1,850.00 Subtotal Engineering Fees $12,100.00 $12,100.00 $11,495.00 $605.00 In approximately two (2) to three (3) weeks, you will receive a direct deposit from the FAA in the amount of $11,495.00 The Federal government requires you to make payment on outstanding claims within five (5) business days of receiving your reimbursement. Upon receipt of your FAA payment on RFR No. 1, please make the following payments: Stelling Engineers, Inc. $12,100.00 Sincerely, Jeff Walla, P.E. Stelling Engineers, Inc. Enclosure Z:\Project-Active\Airports\0043 - Kalispell City\003-2010\Grants\RFR's\0043-003-2010 RFR No I Transmit Howington.doc stelling Engineesw� Inc. imo Is " na planning eTransportation 9 Wastewater e Airports 9 Water 9 Site Development 0 Structures consulting Kalispell Office 1372 Airport Road Kalispell, MT 59901 406.755.8602 FAX 406.755.8710 Email: Mail@stellinginc.com August 26, 2010 Mr. Gary Gates, PE Helena Airports Division Office Federal Aviation Administration FAA Building, Suite 22725 Skyway Drive Helena, MT 59601 RE: Kalispell City Airport — Master Plan Update AIP 3-30-0043-003-2010 Dear Mr. Gates: Please find enclosed Request for Reimbursement (RFR) No. 1 for the Kalispell City Airport Master Plan Update, AIP 3-30-0043-003-2010 project. RFR No. 1 includes the following: Engineering Fees Task 1 — Master Plan Update Task 2 — ALP Update Task 3 — Public Outreach Program Total Allowable Costs Federal Share (95% of Allowable) Sponsor Share (5%) Enclosure $9,000.00 1,250.00 1,850.00 Subtotal Engineering Fees $12,100.00 $12,100.00 $11,495.00 $605.00 Z:\Project-Active\Airports\0043 - Kalispell City\003-2010\Grants\RFR's\0043-003-2010 RFR No 1 Transmit Gates.doc ... ..... . . I -T 7 1 �0 M 614 Park Wve South Great Fags. MT 59405 406.452UW - Fax: 406.452.8700 Email: mallbstellfton-com z Hateria office 2205 Lime Kiln Street Helena, MT 59601 40&443.0611 - FaX 405.443.0755 Email'. wraftesteflingimcom August 25, 2010 City of Kalispell 201 1st Avenue East Kalispell, MT 59901 Professional Services Invoice#: KALISPELL CITY AIRPORT MASTER PLAN UPDATE TAXID #: KALISPELL, MONTANA PROJECT NO: A.I.P. 3-30-0043-003-2010 KafiSpell OffiCe 1372 Al Wft Road Kalispell, MT 59901 406.755.8602 - F= 406.755,8710 Email., Imllacastellinilimcom 011110111! i x I km A I Mel N OULTMOn ILU L-ILIr oi Yl.-aasplvu RIM 3LUI-tivir, rmLimcurs, 111IL;. Ill it Plan Update Project. Services through August 20, 2010 Project Completion Total Amount Earned to Date Total Amount Billed Previously $45,000.00 20% $9,000.00 0.00 -------------- $9,000.00 Z:\Project-ActiveWrports\0043 - Kalispell Clt A003-20101BIlling\lnvoices\0043-003 T1.0 2409.xis vrJ Engineers, tivir. ® Transportation a Wastewater e Airports -plater a Site Development a Structures t Falls 614 Park Drive South Great Falk, MT 59405 406A52.UW - FaX: 406ASZ8700 Email: mallostellini0mcom =5 Lime Win Street Helena, MT S9601 406.443.0611 - Fax: 406.443.0755 Email: khanisestellftinccoat August 25, 2010 City of Kalispell 201 1 st Avenue East Kalispell, MT 59901 Professional Services Invoice#: KALISPELL CITY AIRPORT MASTER PLAN UPDATE TAX ID #: KALISPELL, MONTANA PROJECT NO A.I.P. 3-30-0043-003-2010 Kallsvell Office 1372 Airport Road KalispelL MT 59901 406.7552602 - Fa)c406.7552710 EM8ll:Jwal!aQStell[V=com In accordance with the Master Agreement dated February 1, 20 10 and Contract Amendment No. I dated July 20, 20 10, between the City of Kalispell and Stelling Engineers, Inc. for the City of Kalispell Master Plan Update Project. Services through August 20, 2010 Total Amount of Contract (Lump Sum) Project Completion Total Amount Earned to Date Total Amount Billed Previously $12,500.00 10% $1,250.00 0.00 -------------- $1,250.00 Z-.\Project-Ac6ve\Airportsk0043 - Kalispell City\003-2010\81[llng\lnvolcesN0043-003 T2.0 2410.xls Engineers, mir. a Transportation e Wastewater a Airports ® Water a Site Development ® Structures 614 Park Drive South Great Fads, W S9405 406.452,8600 - Rx 406.452.8700 EMB11: Maff@Stelffng!nC.CDM Helena mce 2205 Llme Kiln Street Helena, Mr 59601 406.443.0611 - FaX 406.443.0755 Email: kharrisastellhalgirr-com August 25, 2010 City of Kalispell 201 1st Avenue East Kalispell, MT 59901 Professional Services Invoice#: KALISPELL CITY AIRPORT MASTER PLAN UPDATE TAXIED #.- KALISPELL, MONTANA PROJECT NO: A.I.P. 3-30-0043-003-2010 I = L �# 1372 A#M Road KallSpall, Mr 59901 406ISSAM - Fax. 406.755.8710 Email: 1wallaOstallinginc.com In accordance with the Master Agreement dated February 1, 2010 and Contract Amendment No. I dated July 20, 2010, between the City of Kalispell and Stelling Engineers, Inc. for the City of Kalispell Master Plan Update Project. Services through August 20, 2010 Total Amount of Contract (Lump Sum) Project Completion Total Amount Earned to Date Total Amount Billed Previously $37,000.00 5% $1,850.00 0.00 ----------------- $1,850.00 ZaPrqJect-AdveNAlrports\0G43 - Kalispell City100320I01BillingA[nvoiceskO043-003 T3.0 241 Ixls r�_ti K-�� 0 W C H W O P. U) o Z O U > a aa)) c cz � a, :c o E a v U) Q a U U) 0- c -- W CO CL E Q W 0 w o �- 0) � Q •� ac o c 0 w ° n a) > c U) a 0- 7 3 d U 0) 0 Q E p o CL0 O c6 Q c N U Q W CO O O O Gi -c) O O CQ N O D O N N O N r- (0 co C. E U * (v o 00 o 00 o 00 o E LO 00 r 0 T U-) N O 0-0 O O U U) a) o E o Q 0) C is ° c 2 3 O 2 - � ro Q_ a o x c V C Q a) c ._ Q Q Q c co C� N CO 'O U N !n 0_ CL Cn U cz co a) U) a) C w co CL a) a) L ++ C �Q) c �d (Z $Qs co c= =ca ogctf cz a) a) O O (A CL Q C) a a) E .� a � Z cu co Q W (nn a) > O C w C co c� >' J CL �-¢ a N Ca 0_ Y 0) C c�� O o C a) L o> 0_ 0_ d N 0 Co 0 0 o > Q 0 a) U o a) Q ctt O 0_ < ILx W a) a •� > a _Q �' E Q) E N 0 w as Q a) - Q a) 7 U¢ J Q Q O m c -� o 0 0 � a o 0 0 w�� c X 0_ 0_ 0_ x 0_ D D U X X J 0_ U W 0 17L T N C'') ,I:0 COO O0 000 0 O T N C2 d' O T' N C� d' (fl r T r T N N N N N N N 3IVadn 31vadnNVId E1331SVW 0' L NVId 1nOAvi laOdHIV 07 N 0 0 z 0 0 a 0 0 a. W C H W C .N N .O co N co O c Z E Z •d _ c M O O E N � Q. N 0 O O U O a) 0) Y J o Q a � .O � N O c o � N U) U aa) 0 d 00 d E O a; U d Q. o o E orr ,n o O U U) Q - �o 0 J LD Q. O "O QCD ?> N Q . U Q O Q •� � o U � O V c c E c in c U a cz � O>' jEU C2U O °) c x CZ � s a a Cvi a O U O Q a) � �E U C - N O d 0 U U LL O �- N C� rY Lq CO r N C'7 ',I - CO co C') C7 Ch CO d It Il- It wvaooad laod3a Honuino ino3so13 onand o•s 133rodd o•ti O Q Q o d � � J O Q ai U c o o U) o n > U o �a) ; Ir — a a a? V o o m m Q Q U• a_cnm0U r O O N 4i cci >+ m a� 0 CL Q EO N O N OUTLAY REPORT AND REQUEST FOR REIMBURSEMENT OMB APPROVAL NO.0348-0002 PAGE OF FOR CONSTRUCTION PROGRAMS 1 1 1 PAGES TYPE OF REQUEST 2. BASIS OF REQUEST 1. (See instructions on back) [ ] FINAL [ X ] PARTIAL [ X ] CASH [I ACCRUAL 3. FEDERAL SPONSORING AGENCY AND ORGANIZATIONAL ELEMENT TO 4. FEDERAL GRANT OR OTHER 5. PARTIAL PAYMENT REQUEST NO. WHICH THIS REPORT IS SUBMITTED IDENTIFYING NUMBER DOT -FAA ASSIGNED BY FEDERAL AGENCY One (1) DOT-FAI ONM-2032 6. EMPLOYER IDENTIFICATION 7. RECIPIENT'S ACCOUNT NUMBEF PERIOD COVERED BY THIS REQUEST FROM (Month, day, year) TO (Month, day, year) NUMBER OR IDENTIFYING NUMBER 81-6001281 3-30-0043-003-2010 7/15/2010 8/25/2010 9. RECIPIENT ORGANIZATION 10. PAYEE (Where check is to be sent if different than Item 9) Name: City of Kalispell Name: No. and Street: 201 1st Avenue East No. and Street: City, State and Kalispell, MT 59901 City, State and ZIP Code: ZIP Code: 11. STATUS OF FUNDS CLASSIFICATION TOTAL No. 1 a. Administrative expense $0.00 b. Preliminary expense $0.00 c. Land, structures, right-of-way $0.00 d. Architectural engineering basic fees $12,100.00 $12,100.00 e. Other architectural engineering fee $0.00 f. Project inspection fees $0.00 g. Land development $0.00 h. Relocation expense $0.00 i. Relocation payments to individuals and businesses $0.00 j. Demolition and removal $0.00 k. Construction and project improvement cost $0.00 I. Equipment $0.00 m. Miscellaneous cost $0.00 n. Total cumulative to data (sum oflines a thru m) $0.00 $0.00 $12,100.00 $12,100.00 o. Deductions for program income $0.00 p. Net cumulative to date (line n minus line c) $0.00 $0.00 $12,100.00 $12,100.00 q. Federal share to date $11,495.00 r. Rehabilitation grants (100% reimbursement) $0.00 s. Total Federal share (sum of lines q and r) $11,495.00 I. Federal payments previously requested $0.00 u. Amount requested for reimbursement $11,495.00 v. Percentage of physical completion of project (Grant Amount $92,910.00) 12.4% 12. CERTIFICATION SIGNATURE OF AUTHORIZED CERTIFYING OFFICIAL DATE REPORT SUBMITED a. RECIPIENT I certify that to the best of my knowledge and PED OR PRINTED NAME AND TITLE TELEPHONE (Area code, number, belief the billed Costs or disbursements are in accordance with the terms of the project and that and-t-ftr) the reimbursement represents the Federal share Jane Howington (406) 758-7703 due which has not been previously requested and SIGNATURE OF AUTHORIZED CERTIFYING OFFICIAL DATE SIGNED that an inspection has been performed and all work is in accordance with the terms of the award. 8/2512010 b. REPRESENTATIVES' r P CERTIFYING TO LINE 11 TYPFD O6AD TITLE TELEPHONE (Area code, number, and -Mansion) Jeff Walla, PE 406-755-8602 AUTHORIZED FOR LOCAL REPRODUCTION PREVIOUS EDITION USABLE 271-103 STANDARD FORM 271 (Rev. 7-97) Prescribed by OMB Circular A-102 and A-110 C:\Users\Jeff\Desktop\0043-003-2010 RFR No 1.xls